ore caving 中文意思是什麼

ore caving 解釋
礦石冒落
  • ore : n. 礦;礦砂,礦石;〈詩〉金屬(尤指貴金屬)。 be in ore 含有礦物。n. (pl. ore)1. 歐爾〈瑞典貨幣單位,等於1/100克朗〉。2. 歐爾硬幣。
  • caving : 岸崩
  1. Study on ore loss and dilution in pillarless sublevel caving based on sls system

    系統的無底柱崩落法礦石損失貧化的研究
  2. With computer imitation and laboratory physical analog as the lead and on the basis of test ore blocks and industrial blownoff - ore rock tests, study on the enlarged - structure parameters of sublevel caving in meishan iron mine was carried out, which included single tests of drilling and blasting parameters , transition sublevels and equipment complementation. the timely popularization of this enlarging structural parameter technique has greatly improved the performances of the sublevel caving mining and promoted the technological advance of underground mining

    梅山鐵礦加大無底柱分段崩落法采礦結構參數研究,採用計算機模擬、實驗室物理模擬為先導,試驗礦塊、工業放出體試驗為基礎,分別進行了采場鑿巖爆破參數、過渡分段、設備配套等單項試驗,並在全礦及時進行了推廣應用,極大地改善了礦石開采過程中的各項指標,促進了地下礦山開採的技術進步。
  3. Research on the influence of structural parameters of sublevel caving on ore drawing results

    無底柱分段崩落法結構參數對礦石回收指標的影響研究
  4. Based on the analysis of the evolution of the structural parameters of non - pillar sublevel caving of mines both in and outside china, it is pointed out that increasing continuously the sublevel height is not suitable for application in china because of the limitation of various factors while increasing the access space is the main way to reduce the amount of developing work, reduce the mining cost and increase the one - time caved ore amount so as to raise the mining strength and the labour production rate

    分析了國內外礦山無底柱分段崩落法結構參數演變過程后指出,繼續增大分段高度由於諸多因素的限制,在我國並不適宜推廣應用,而增大進路間距卻是減少採準工程量、降低采礦成本、增大一次崩礦量、提高采礦強度和勞動生產率的主要途徑。
分享友人