over work 中文意思是什麼

over work 解釋
過勞
  • over : adv 1 在上,在高處;從上向下;突出,倚靠;越過。 jump over 跳過。 climb over 爬過。2 在那邊,向那...
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. Chzns pneumatic element plant has two years ensure term of quality from delivery, because question of attaint or not natural work, company will take charge gratis replacing or repair. as soon as you apply our products, you will obtain over - all support, including researching

    所有氣動元件保質期二年內義務對失效元件進行更換和維修,應用中正氣動產品的系統,你將受到全球范圍的支持,包括研究開發設計系統應用準時交貨和專家服務。
  2. Before starting work at ascenvision, mr. babu had worked at a large company in the hsinchu science - based industrial park for a period of one year. this company, which mr. babu joined on a friend s recommendation, produced a wide range of products, and had a large workforce ; mr. babu was mainly involved in voip voice over internet protocol product development and testing

    在工作環境方面,到亞盛科技股份有限公司工作之前, mr . babu曾經由來臺工作的印度朋友介紹,進入新竹科學園區中較具規模產品種類和員工數都較多的另一家企業工作一年,主要作的是voip的開發測試。
  3. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  4. Both theoretical proof and numerical experiments indicate that this algorithm is convergent and effective for solving large - scale semidefinite programming. in the following section, we work over the bisection problems

    數值實驗與理論分析均表明該演算法適用於求解大規模問題,且具有良好的收斂性;其次,研究了電路二等分問題。
  5. Consequently, most of the work was rushed and botched and slobbered over in about half the time that it would have taken to do it properly.

    結果,大多數工作就匆匆忙忙、馬馬虎虎地趕完了事。這些工作如果規規矩矩地做就得多花上一倍的時間。
  6. 21 detumescence of eyelid : fatigue, swallow, over - smoking, eyelid inflammation, or overburden of work before the screen, all can lead to tumescence and eye bags

    眼皮消腫方法:勞累、傷心、過度抽煙、眼睛發炎,或在熒光屏前過度地工作等都會引起眼睛的紅腫和眼袋。
  7. The centimeter - gram - second unit of energy or work equal to the work done by a force of one dyne acting over a distance of one centimeter

    能量或功的單位:厘米-克-秒,相當於一達因的力在移動一厘米時所作的功。
  8. At 6 o ' clock our work was over. after tidying up the meterials, we went to the eatery effete to had our supper. two days ' work made us exhausted, but we didn ' t forget our later work. receiving the news is just a beginning of the new term and our real work doesn ' t begun. during the supper we began our adepted team game, which made us forget tiredness. instead was our friends working together for two years, the progress of the club in the new term and the development aspect for the leaving days

    我們的那新工作一直開展到晚上6點多鐘,將近7點我們收拾好我們的納新材料后才拖著疲憊的身體走進食堂開始我們晚餐,兩天的工作使我們精疲力盡,但我們沒有忘記接下來的工作還有很多,納新只是我們新學期工作的開始,還沒有進入我們的正題,晚餐之間我們又開始了我們最為擅長的團隊游戲,歡聲笑語使我們忘記了疲勞,有的我們共同走過兩年風雨歷程朋友,有的只是我們以後俱樂部的新學期工作的開展,以及俱樂部以後的發展方向。
  9. During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer

    近三年來主要從事機械行業工廠工程設計,先後參與二十五個項目的可行性研究報告編制,初步設計和施工圖設計.涉及機床廠,齒輪廠,拖拉機廠,汽車製造廠,電泵廠,電機廠,電纜廠的新建或技術改造,其中單項投資額最高的為1 . 6億元,總計完成投資額為8 . 5億元(未重復計算)的設計工作量.由於對機械行業發展狀況和省內狀況較為熟悉,具有一定的專業水平,這些設計項目均經有關領導部門,專家審定列入國家計劃,得以實施,為工廠的技術進步,產品更新換代,生產發展創造較好的經濟效益和社會效益.在這些設計,咨詢中,本人均任項目負責人,全面組織,實施設計工作,得到主管部門和用戶較高評價
  10. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河水位的水沙因素,及僅用水沙因素有效研究水位的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應水位過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中高及中低含沙類洪水相應水位過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應洪水位過程的擬合誤差都較小;最後,明確黃河下游含沙量對水位的主要影響方式,即含沙量主要是與其它因素聯合對水位作用;另外分析了要實現變動河床洪水位過程準確預報的困難所在及改進方向。
  11. A great uniformity of work prevails over the wide expanse.

    在這片廣大土地上的工作是一種統一的偉大工作。
  12. For over a week they were hard at work preparing a letter to nikolushka from all the household, writing out rough copies, copying out fair copies. with the watchful care of the countess, and the fussy solicitude of the count, all sorts of necessary things were got together, and money, too, for the equipment and the uniform of the young officer

    他們準備一個多禮拜了,打好了書信的草稿,並且把全家寫給尼古盧什卡的幾封書信謄了一遍,在伯爵夫人的監督和伯爵的關照下,籌措一些必需品和錢款,為已擢升的軍官置備軍服和生活用具。
  13. The seasons succeed one another, and waves of farm work swept over domestic affection.

    季節更迭,農事的波濤淹沒了家庭的慈愛。
  14. He ' s a teacher, over at fillmore. - your mother, does she work

    他是個老師,在菲爾莫中學教書-你母親呢?她有工作么?
  15. - he ' s a teacher, over at fillmore. - your mother, does she work

    -他是個老師,在菲爾莫中學教書-你母親呢?她有工作么?
  16. Abstract : with the composite process of root - pile and infilling consolidation by cement injection with foraminate - steel - tube ; good effect has been made in the treat of sideslip of one fly - over bridge. the work machanism and technology of cement injection with foraminate - steel - tube are discussed in following article

    文摘:用樹根樁及帶眼鋼管充填壓密灌漿工藝復合處理某立交橋側移的實踐取得很好實效;對帶眼鋼管灌漿的工藝與機理作了討論,認為其具有廣闊的應用前景。
  17. My next work was to view the country, and seek a proper place for my habitation, and where to stow my goods to secure them from whatever might happen ; where i was i yet knew not, whether on the continent or on an island, whether inhabited or not inhabited, whether in danger of wild beasts or not : there was a hill not above a mile from me, which rose up very steep and high, and which seem d to over - top some other hills which lay as in a ridge from it northward ; i took out one of the fowling pieces, and one of the pistols, and an horn of powder, and thus arm d i travell d for discovery up to the top of that hill, where after i had with great labour and difficulty got to the top, i saw my fate to my great affliction, viz

    有了上次的經驗,我不再把木排做得像第一個那麼笨重了,也不再裝那麼多貨物了,但還是運回了許多有用的東西。首先,我在木匠艙房裡找到了三袋釘子和螺絲釘,一把大鉗子,二十來把小斧,尤其有用的是一個磨刀砂輪。我把這些東西都安放在一起,再拿了一些炮手用的物品,特別是兩三隻起貨用的鐵鉤,兩桶槍彈,七支短槍一支鳥槍,還有一小堆火藥,一大袋小子彈,還有一大卷鉛皮。
  18. Paragraph of time, the physical - training teacher educating a branch to organize implement new class bid to middle and primary school reforming condition making an investigation, indicate on inquiry in the front, scale is small since a little school running a school, a little rural area elementary school, does not move space especially, be not enough to pay attention to waiting a minute or to physical training, do not have very good according to that new class switches over to demand to open enough physical education, since entering the higher school the system restraint, a little school defies student sports activities and good health, physical education birthplace having some of higher class with the method of work " resorting to fraudulence ", go ahead culture class within outside row physical education, at present major middle and primary school stadium field layout, equipment and material facilities are obsolete, short - supplied, foundation has no way to ensure that regular sports of school is flexible carrying out, is difficult to say material request adapting to new class more

    前段時間,教育部門組織體育教師對中小學實施新課標改革情況進行調查,調查表明,一些學校由於辦學規模小,特別是一些農村小學,沒有運動場地,或者對體育鍛煉不夠重視等等,沒有很好地按照新課改要求開足體育課,由於升學制度的制約,一些學校無視學生體育活動和身體健康,有些高年級的體育課貫用「偷梁換柱」的做法,外排體育課,內上文化課,目前多數中小學體育場地布局、器材設施陳舊、緊缺,根本無法保證學校正常的體育活動的開展,更難以說適應新課材的要求。
  19. No chattering over work.

    工作時禁止閑談。
  20. You stressed over work too much

    你工作太辛苦了
分享友人