part c 中文意思是什麼
part c
解釋
第三部分-
Contract procedures for building works - part c : general technical specifications for building works ; ashlar works
建築工程合同.第c部分:建築工程通用技術規范.毛石作 -
Contract procedures for building works - part c : general technical specifications for building works - plaster and stucco works
建築工程承包條例.第c部分:建築工程通用技術規范.石 -
2 filler metals shall conform to the asme boiler and pressure vessel code, section ii, part c
填充金屬應符合asme鍋爐與壓力容器規范第卷c篇的要求。 -
Contract procedures for building works - part c : general technical specifications for building works ; tile laying works
建築工程合同.第c部分:建築工程通用技術規范.鋪瓦作 -
Contract procedure for building works - part c : general technical specifications for building works ; wall paper hanging
建築工程合同.第c部分:建築工程通用技術規范.裱糊工 -
I have read and understand the conditions of quarantine surveillance detailed as listed in part c above and i undertake to comply with these conditions, acknowledging that compliance is necessary for the post - arrival quarantine to be served as quarantine surveillance
本人已閱畢及明白上述丙部所列的檢疫監察條件,並承諾予以遵守,而本人確知必須遵守有關條件,才可讓該犬只接受檢疫監察,作為其抵港后的檢疫程序。 -
Contract procedures for building works - part c : general technical specifications for building works ; drainage work
建築工程合同.第c部分:建築工程通用技術規范.排水工 -
Contract procedures for building works - part c : general technical specifications for building works ; asphalt flooring works
建築工程合同.第c部分:建築工程通用技術規范.敷瀝青 -
The application shall be made within a period 3 years after passing the part c road test ; and
申請人須在電單車駕駛測驗c部分路試獲取及格后三年內遞交申請及 -
Part c test i. e. road test appointment letter or application for part c test i. e. road test
須附上有關駕駛考試丙部(路試)排期信或同時申請丙部(路試)排期。 -
Contract procedures for building works - part c : general technical specifications for building works ; railway track works
建築工程合同.第c部分:建築工程通用技術規范.鐵路工 -
Contract procedures for buildings works - part c : general technical specifications for building works ; grouting works
建築工程合同.第c部分:建築工程通用技術規范.灌漿工 -
Asme boiler pressure vessel code - section 2 : materials ; part c : specifications for welding rods, electrodes and filler metals ; 2005 addenda july 1, 2005
Asme鍋爐和壓力容器規范.第2部分:材料. c部分:焊條電焊條和填充金屬規范.補充件2005 -
After cancellation, he has to retake the part c road test and start a fresh 12 - month probationary period again
暫準駕駛執照被吊銷后,該名司機必須重考c部分的路試,並且重新開始為期12個月的暫準期。 -
Contract procedures for building works - part c : general technical specifications for building works ; parquet works
建築工程合同.第c部分:建築工程通用技術規范.鑲木地 -
Contract procedures for building works - part c : general technical specifications for building works ; gas, water and sewage plumbing works inside of buildings
建築工程合同.第c部分:建築工程通用技術規范.建築物 -
Contract procedures for building works - part c : general technical specifications for building works - carpentry and timber construction works
建築工程承包條例.第c部分:建築工程通用技術規范.木 -
Contract procedures for building works - part c : general technical specifications for building works ; construction works for traffic lines, top layers of asphalt
建築工程承包條例.第c部分:建築工程通用技術規范.瀝 -
Contract procedures for building works - part c : general technical specifications for building works ; construction works for traffic lines, top layers without binders
建築工程承包條例.第c部分:建築工程通用技術規范.無 -
Contract procedures for building works - part c : general technical specifications for building works ; construction works for traffic lines, stone and tile pavements, kerbs
建築工程承包程序.第c部分:建築工程通用技術規范.鋪
分享友人