path float 中文意思是什麼

path float 解釋
路徑浮動時間
  • path : path(ol )=pathological; pathology n (pl paths )1 (自然踏成的)路;路徑;(馬路邊上的)人行...
  • float : vi 1 漂浮,浮起 (opp sink); 飄流,漂流。2 (謠言等)散布。3 (公司)成立;(計劃)實行。4 (票...
  1. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero

    在確定性模型中,關鍵路徑通常定義為浮點值小於或等於指定值(通常為零)的活動。
  2. I have me my summer vacation in a town last year. since whose are there. some of my relations, there have a good view for the mountain and river, i think it ' s a great place be to rest, one day when i ride my bike on the small path, this river catch my eye for very clearly but like very deeply, becauese i can ' t see the end of the water, then. some chap shouting make me look at, they catch a a short boy and thow he in the water with a heavily, waiting for a moment yet the boy not up the water, i ' m very worry and jumping in the river, i want float out but some watergrass be enteine my leg and the body is deeper at every movey, i don ' t know past how long time, i feeling one small hand help me break up the watergrass and push me to the surface of the rive, after that i just kown they are hvae a playing who can sit in the swim and make a long time in deep water, but i want cry for the joking, becauese i couldn ' t swim but i have a forget

    去年我在一個小鎮上度暑假,因為那裡有我的親戚,我認為那裡有好山好水是一個靜休的好地方.一天當我在小路上騎著自行車時,一條非常清澈但好像也挺深的小河吸引了我的視線,因為我好像看不到河的底端,這時,一些小孩的叫喊聲因起了我的注意,他們抓住一個矮小的小男孩然後重重的扔進了水裡,待了一小會這個男孩沒有露出水面,我非常擔心就跳進了水裡,我想浮出來,但一些水草纏住我了的腿,我每動一動身體就會越往下沉,我不知道過了多常時間,我感覺有一雙小手幫我弄掉腿上的水草並往水面推著我的身體,后來我才知道他們是在玩看誰在水底呆的時間長的游戲比賽,但我對于著樣的笑話想哭因為我忘記自己了不會游泳
  3. Abstract : during treatment of a delayed schedule , specific deliberation of calculation on claim for extension of time should be paid attention to the following tasks ; because the critical path of a network might be changed from time to time and the appropriate utilization of float should be carefully considered in the actral schedule , therefore , the claim for extension of time can not be calculated only by the network , but the actual period where the cause of a delaed schedule is set should be considered , and should be calculated on the basis of the actual schedule which is approved by the supervising engineer

    文摘:在工期延誤處理時,工期索賠計算應特別注意:由於網路的關鍵線路可能發生變化,且實際進度計劃要考慮時差的合理利用,因此工期索賠不能僅按網路圖計算,而要考慮工期延誤原因的實際發生時間,按經監理工程師批準的實際進度計劃計算。