permanent dam 中文意思是什麼

permanent dam 解釋
固定壩
  • permanent : adj. 1. 永久的,不變的,耐久的;持久的,經久的。2. 常務的,常設的 (opp. temporary)。n. 電燙發 (=permanent wave)。adv. -ly
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. The article introduces the waterproofing and drainage measures and materials for the dam, the foundation of the permanent lock and some buildings of the three gorges project

    介紹了三峽工程中大壩、永久船閘基礎及一些建築物的防排水措施和所用材料。
  2. Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction

    採用非線性靜、動力有限元分析程序對圍壩的4個典型剖面進行了靜、動力模擬模擬,模擬計算了壩體自填築至蓄水運行和發生7地震各階段壩體及壩基的變形以及應力分佈,地震應力響應和地震引起的超靜振動孔隙水壓力分佈以及永久變形。判斷了壩體和壩基中出現裂縫、塑性區以及地震液化的可能性。
  3. 3. the way to calculate the equivalent joint - force is consummated in the equivalent joint - force method to calculate dam ' s permanent displacement caused by earthquake

    3 、完善了計算地震作用下土石壩的永久位移的等價節點力法中等價節點力的計算方法。
  4. Whether the earth dam lapses in seismic response analysis is mainly judged by two criterion, the damage value and the permanent displacement, so the difference of response between multi - point input and one - point input, that is the multi - point effect, is also checked by this two criterion. therewith the method to calculate damage value and permanent displacement is studied too. the multi - point input is two directional, one direction is along river, and another is vertical

    由於土石壩在地震作用下的失效形式包括累積損傷破壞和過大的永久位移,本文從累積損傷和永久位移兩方面研究土石壩多點輸入相對單點輸入地震反應有何不同,即多點效應如何,因此與多點輸入分析相關的損傷值和永久位移的計算方法也在研究之列。
  5. If the inputted accelerations are velocity - zeroized and the damage value is calculated according to shear stress " extrema, as to 100 - meter - high earth dam, multi - point effect is not distinct ; but as to 240 - meter - high earth dam, in the part where permanent displacement and damage value is originally bigger the response is less tenser than that by one - point input, and in the part near basement the maximal shear stress and damage value is bigger, that is the multi - point effect in time domain

    若同時進行了多點地震動速度歸零化和採用基於極值的損傷值計算方法,對於100米高的土石壩,多點輸入與單點輸入反應十分接近。對於240米高的超大型土石壩,壩體內永久位移和損傷值較大的部位多點輸入的反應量較小,這是多點輸入反應的特點或說多點效應。另外,多點效應也包括壩基部位的最大動剪應力和損傷值偏大這一效應。
  6. The maopingxi embankment dam ( med ) with an asphaltic concrete core wall, an a - class permanent building, is an important part of three gorges project

    茅坪溪防護大壩屬一等一級永久建築物,是三峽工程的重要組成部分。
  7. The actual application of the computer supervision system to the permanent water plant on the left bank of three gorges dam is presented herein, for which the equipment composition and the realized functions of the control layer are mainly introduced

    摘要介紹了計算機監控系統在三峽大壩左岸永久水廠中的實際應用,主要介紹了監控系統中控制層的設備組成及實現的功能。
  8. The program is competent to conduct the nonlinear time history response analysis and permanent displacement calculation of embankment dam during earthquakes

    該程序可完成土石壩在地震荷載作用下非線性時程響應分析以及地震荷載引起的永久變形計算。
  9. This platform, being the first dam platform available publicly in hong kong, will likely to spin off more research in dam and its related technologies using this platform as a test - bed. the availability of this platform to anyone will give independent content - producers more creative space to make more innovative products. since this platform is using a next generation fixed content address server, it can archive the digital contents safely and securely. artists do not need to worry about finding a safe place for permanent archival of their works and this systems can be a central repository for the digital artists in hong kong

    這個平臺,作為香港第一個公眾可用的數碼資產管理平臺,將可能會引發更多的數字版權管理及相關科技的研究,並使用該平臺作為實驗臺.任何人都可以使用它將提供獨立的內容製作空間來創作更多的創新產品.因為數字版權管理平臺使用的是下一代的cas伺服器,你可以對數碼內容進行安全可靠的存檔
  10. The three gorges project is a world - famous water conservancy center project. the main parts of it are the body of concrete dam, permanent ship casket, electricity - produce department, etc. these are all large volume concrete which influence the ageing resistance of the project directly, and they also have much to do with ( he concrete of moderate heal portland cement armature and concrete aggregate, etc

    長江三峽工程,是舉世矚目的特大型水利樞紐工程,工程的主體:混凝土大壩壩體、永久船閘,發電廠房等均為大體積混凝土,這些混凝土工程的耐久性既與施工質量有直接關系,也與組成壩體的小熱硅酸鹽水泥、骨料、鋼筋等原料有密切的關系。
  11. Analysis of earthquake induced liquefaction and permanent deformation of shuiniujia central core rock - fill dam

    水牛家心墻堆石壩地震永久變形及液化分析
  12. After the engineering slope was dug, several small plastic zone the designed rock - fill dam will coming in the temporary slope, because rock - fill dam change the stress field on a small degree. but a gravity dam will arouse a great area of plastic zone in the permanent slope, which will bring a stability problem. after detail and depth study, the rock - fill dam project is more compatible of the engineering geology condition in nuozadu hydraulic - power station ' s dam site

    工程邊坡開挖后,擬定的堆石壩方案由於嵌入淺,應力的調整有限,塑性區主要分佈在壩頂高程附近的較小范圍內;而擬定的重力壩方案,由於嵌入深,引起了一定程度的應力調整,邊坡巖體表層產生了鬆弛變形,塑性區主要分佈在壩頂高程到坡頂前緣(永久邊坡)的v ivb類巖體分佈區。
分享友人