phase block 中文意思是什麼

phase block 解釋

  • phase : n 1 形勢,局面,狀態;階級。2 方面,側面。3 【天文學】(月等的)變相,盈虧;【物、天】相,周相,...
  • block : n 1 片,塊,大塊;粗料,毛料;木料;石料;金屬塊;【建築】塊料,砌塊;【地質學;地理學】地塊。2 ...
  1. Influenced by the alternating current field, all of the eutectic microstructure of al - 20si - 5fe - ti alloy changed into very small particles which is well - distributed on the base of a - al. electromagnetic stirring stimulates the forming of equiaxed crystal in al - 20si - 5fe - mn alloy. primary iron - phase is transformed from thick needle into smooth block

    電磁攪拌促進al - 20si - 5fe - xmn合金中等軸晶的生成,初生富鐵相由原來粗厚的片狀物轉化成比較圓整的塊狀,共晶組織中鐵相主要以較短的針片狀存在。
  2. They are paleozoic ~ early mesozoic - fold deformation and the appearance of reversed fault ; mesozoic - the beginning of graben faulting - block period ; early cenozoic - the phase of broke - the forming of block hill ; late cenozoic - the phase of segging - the forming of buried hill. we mark off five kinds of buried hill belts. they include three different kinds of trap on the basis of the cause of trap formation

    本次研究在重新認識濟陽坳陷區域構造背景的基礎上,將濟陽坳陷古生界潛山的形成過程分為四個階段,即古生代早中生代?穩定沉降?隆升?輕微褶皺變形及逆斷層發育階段、中生代?初步斷陷階段?塊斷期、新生代早期?斷拗階段?塊斷潛山形成期以及新生代晚期?坳陷階段?潛山定型期。
  3. Having analyzed preliminarily formation mechanism of these common characteristics of anomaly, it concludes that : these are results, controlled by basically united tectonic stress field of large - range, caused by stress - strain accumulation and certain phase strong earthquakes, according to deformation difference brought about in tectonic position along the boundary zone and within second - order faults of active blocks resulted from unstable and inharmonious features for movement of block system at different levels and deformation of boundary

    分析這些異常共性特徵的形成機制,初步認為:是在基本統一的大區域構造應力場控制下,不同層次塊體系統運動及其邊界帶變形的非平穩、非協調性,在活動地塊邊界地帶和地塊內部次級斷裂構造部位產生變形差異而導致應力-應變積累、孕育強震到一定階段的結果。
  4. Research on fine reservoir characterization and residual oil distribution of complex fault block reservoir at later development phase

    復雜斷塊油藏高含水期精細描述技術及剩餘油分佈規律
  5. 2f ( portion ), block a, b & c, phase i, allway garden, tsuen wan, n. t

    荃灣荃威花園第1期a , b及c座2樓(部份)
  6. The clock recovery block of usb2. 0 transceiver macrocell consists of phase locked circuit, such as pll and dll ( delay locked loop ). this block use external crystal 12mhz sin signal to produce 60mhz, 120mhz, 480mhz clock signal, and can recover colock signal form date wave. it can support 480mbps ( hs ) and 12mbps ( fs ) word speeds as defined in usb2. 0 specification.

    目的是用鎖相環電路? pll和dll (延遲鎖相環)實現usb2 . 0收發器宏單元utm的時鐘恢復模塊。其中pll環路構成的時鐘發生器將外部晶振的12mhz正弦信號生成60mhz 、 120mhz 、 480mhz等本地時鐘信號。 dll環路依據本地時鐘信號對外部數據信號進行時鐘恢復。
  7. Following this principle, dpc adopted the method of " goal management ", i. e. disintegrating the three goals of investment, schedule and quality to different levels in accordance with different administrative levels to keep their consistency generally. moreover, dpc tried some effective new pattern such as in - phase management, strategic pass management and block management to shorten the time limit on the premise of ensuring the project quality. using some effective science way and modern management technology such as key line method to realize the reasonable resources allocation, including human resource, material resource and financial resource

    在這一理念的指導下,大連石化分公司運用了目標管理,將投資、進度、質量三大目標層層分解,並保證目標點的設置和時間段的劃分切實可行,方便合理;目標分解結構在較粗的層次上與組織分解結構一致,實現了組織結構設計與目標分解設計的配套;努力提高作為建設單位為各參建方的服務意識,注重與參建各方的有效溝通和相關單位的全方位協調;採用同步管理、關口管理和分塊管理等多種有效的新模式,在保證工程質量的前提下,趕工期,搶進度;用關鍵線路法、凈值法等有效的科學手段和現代管理技術來實現建設工程中資源的合理配置。
  8. In case that coal process system in power plant is lack of certain process, and while timber block, big coal block, stone, sack or metallic block and relevant foreign matter easily clog out belt and make motor overloaded, this sets up overload protection in electric control system, and this sets up overload protection in frequency inverter setup program ; in addition, this sets up branch breaker and switch up power supply in case of lack of phase or overload

    若電廠燃煤處理處理系統缺少某些環節,木塊、大煤塊、石塊、草袋、金屬塊等雜物,容易卡死皮帶,使電機過載,因此在電氣控制系統中設有熱過載保護,變頻器設定程序中設有過載保護;另外設有支路斷路器,在過載缺相情況下,切斷電源。
  9. Analysis shows that when summer precipitation in north china is richer ( less ), tropical east pacific ssta is colder ( warmer ) phase, and slp and 500hpa geo - potential height are negative ( positive ) anomaly over the asia, west pacific sub - high is northerner ( southerner ), and block high in mid - highs latitude happens less ( more ) than normal, east monsoon is stronger ( weaker )

    分析表明華北夏季多(少)雨期,赤道中東太平洋ssta處于冷(暖)位相,在非洲大陸上slp利500hpa位勢高度均為負(正)異常,西北太平洋副高位置偏北(南) ,中緯度阻塞高壓發生頻率較低(高) ,東亞夏季風偏強(弱) 。
  10. Laguna city phase 3 block 16, cha kwo ling road

    麗港城第三期十六座,茶果嶺道
  11. But some enterprises lack systematic thought in informative construction, especially for those enterprises which are now in the transitional phase to flat structural system, they often dismissed the phenomenon that the middle - level contradiction shifts to the two poles therefore a lot of information block in the middle - level, all these greatly obstructed the development of enterprise informative construction

    但是,一些企業在信息化建設中缺乏系統思考,特別是向扁平化結構體系過渡的企業,未看到中層矛盾向兩極轉移,出現信息中層涌塞現象,極大的阻礙了企業信息化建設的步伐。
  12. Application of pre - stack two - phase media attribute inversion in prediction of carbonate reservoirs in tazhong block

    疊前雙相介質屬性反演技術在塔中碳酸巖儲層預測中的應用
  13. The second phase of alloy changes very much for the reheating. all of the primary silicon and iron - phase in al - 20si - 5fe - 3mn alloy is transformed into little well - distributed block

    Al - 20si - 5fe - xti中初晶硅不僅被細化,而且趨向于球形,鐵相轉化為短片狀。
  14. Different zone block in the basin has different construction. cold and heat shells are at intervals. crust behaves as hot, light, flowing and thicker, however, mantle behaves as cold, weight, and harder, multi - phase and deep mantle

    盆地不同區塊熱結構不同,為冷、熱殼相間,地殼表現為熱、輕、軟、流、厚殼,地幔表現為冷、重、硬、多相、深幔的特點。
  15. At implementation phase, based on the design policy, we first choose the language rose as msr language, analyzing the advantage of using the language rose. then we sort the lfb in msr according to the rose language specification, and particular define these five categories of lfb in rose language. in msr, we design forty kinds of lfb in all. finally, we especially list the design and implementation scheme of some important lfb, as the gre logic function block - - checkgreheader, greencap, stripgreheader and the logic function block for distribution operation - - splitfirst

    在實現階段,根據設計方針,首先選擇rose作為msr的語言使用,分析了使用rose的好處。接著我們對msr中的lfb按照rose語言規范進行分類,並在rose語言中詳細定義這五類lfb 。使用rose語言描述邏輯功能模塊。
  16. Objection to the conversion of a public rental housing block in ho man tin south estate phase iii to a home ownership scheme block

    反對將何文田南第三期的一幢租住公屋大廈改作居者有其屋計劃大廈
  17. Third, an active mixer which needs only single - end local oscillator ( lo ) input is presented, which simplifies the rf block design and reduces the impacts of the phase noise of lo

    接著本文提出了一個新型的、只需要單端本振輸入的有源混頻器,簡化了整體電路設計,並降低了本振相噪帶來的影響。
  18. In this work, pluronic f127 was used as a progen and different biodegradation rate and surface property as amorphous calcuim phosphate, a - calcuim triphosphate, - calcuim triphosphate and a / p - calcuim triphosphate were selected to make three - dimensional porous composites with plla. in the phase separation of pure plla or cp / plla composite system the ppo block of pf127 can aggregate plla clew to induce phase separation. this resulted big round pores of 50 ~ 300 m and uniform ladder - like structure of 400 ~ 1000 m

    具體結果如下:浙江大學碩士學位論文在單純的聚乳酸以及鈣磷酸鹽/聚乳酸復合體系的相分離過程中, pf127的ppo鏈段對plla鏈段有聚集作用,促進相分離過程,在不同溶劑中分別可得到孔徑在50一300林m的較大的圓孔和有序度為400一1000林m的梯狀孔,孔隙率為80 % ~ 93 % 。
  19. Shop no. 1, gf, block 3, belvedere garden, phase i, no. 530 - 590, castle peak road, tsuen wan, n. t

    荃灣青山公路530 - 590號麗城花園第一期第三座地下一號鋪
  20. With an introduction of the moving block system applied in wuhan rail transit project, the author analyzes atc operation mode which is based on moving block technique, and fallback mode, an auxiliary safety operation when fault occurs in moving block system, finally describes the failure management in the operation of the 1st phase of wuhan urt line 1

    摘要以武漢軌道交通1號線一期工程信號系統的移動閉塞為例,介紹了移動閉塞技術下的atc模式以及針對工程項目制定的運營輔助手段後退模式,並討論了一期工程中運營的故障管理策略。
分享友人