phase-failure 中文意思是什麼

phase-failure 解釋
相故障
  • phase : n 1 形勢,局面,狀態;階級。2 方面,側面。3 【天文學】(月等的)變相,盈虧;【物、天】相,周相,...
  • failure : n 1 失敗 (opp success); 不及格。2 不足,缺乏;衰退;【醫學】衰竭。3 不履行,玩忽。4 破產,倒閉...
  1. This test is based on homogeneous soil in foundation, and divided into two phases. the first is to stimulate the construction flow to excavate the pit ; the second phase is destructive test. because the pit is stable in the first phase and the research is point to the geometry shape of the failure surface, moreover, limited to the test condition, the effective surface force is applied to the pit

    此次模擬試驗主要是針對簡單均質的基坑土層進行研究,試驗分為兩個階段,第一階段主要是以相似工況模擬基坑開挖,第二階段主要是破壞性試驗,即由於在第一階段基坑在開挖范圍內能夠自穩,為使基坑達到破壞狀態以研究滑面幾何形態,限於試驗條件,採用「等代面力」的方式施加超載。
  2. When temperature is very close to the temperature of phase transition, critical phenomena appear in the system. fluctuation of order parameters leads to the failure of landau theory of phase transition

    但是,在充分接近相變點時,系統出現臨界現象,序參量有顯著的漲落,這導致landau理論的失效。
  3. Phase failure protection for small threephase asynchronous motors

    小容量三相異步電動機斷相保護方法
  4. A practical digital logic electric circuit of phase failure and phase stagger protection for three phase asynchronous motors

    一種實用的三相異步電動機斷相錯相保護數字邏輯電路
  5. The device has realized the real - time control and protection for short circuit, failure to start, unbalance ( open phase ), under - voltage, earth faults, and overload

    保護與控制裝置實現了對短路、起動故障、不平衡(斷相) 、欠壓、接地故障、過負荷的實時監控和保護。
  6. The instrument can detect all kinds of steam, diesel engine start - up performance, high - voltage ignition performance, fuel injection performance, rechargeable performance, dynamic performance, service gas phase, abnormal sound engine vibration analysis more than 30 kinds of technical parameters, and analyze the causes for the failure, the detection process, may at any time and waveform display various technical parameters and results can be random print, the machines are more than 100 kinds of domestic and foreign memory engine technical parameters, it is rich in content and the test results can be readily compared

    該儀器可檢測各種汽、柴油發動機的啟動性能、高壓點火性能、燃油噴射性能、充電性能、動力性能、配氣相位、發動機異響震動分析等30餘種技術參數,並分析故障產生的原因、檢測過程中,可隨時顯示各種波形及技術參數和結果並可隨機列印,該儀器內存有一百多種國內外發動機技術參數,內容十分豐富,隨時可以與檢測結果對比。
  7. From the viewpoint of the characteristics of two - phase liquid sand slurry wear, combined with the examination and study on easily damaged workpieces, the wear failure ' s basic rules are pointed out, of the pump shell and the cutter - piece on service, and the general principles of material wear - resistant designs put forward. the sand slurry abrasion tester has been designed and developed which can simulate general dredging conditions. summarized and presented are the position - exchange measuring method of sand slurry abrasion test and the experiment specification of sand slurry wear test of dredging conditions

    文中系統論述了作者在疏浚工況泥沙磨損機理及其耐磨新材料課題研究中的工作成果,主要研究內容和創新點如下:總結分析了磨損研究動態和提高材料耐磨性的方法;從兩相流泥沙磨損的特點出發,結合對失效易損件的考察研究,分析指出了現役泥泵殼和絞刀片磨損失效的基本規律,提出了材料耐磨損設計的基本思想;設計研製了能模擬疏浚工況的泥沙磨損試驗機,總結提出了泥沙磨損試驗換位測試法和疏浚工況泥沙磨損試驗規范。
  8. Co - movement to the impinger and the switch, one phase is in failure and three phases cut off at the same time

    配置的撞擊器能量可配合開關脫扣機構動作,達到一相出故障,三相可同時斷開,避免缺相運轉。
  9. The device has considered its practical functions, which include chinese character parameter, waveform display for three - phase current, fixed value and retain of failure information

    裝置考慮了實用功能設計。具有漢字參數、三相電流波形顯示,整定值、故障信息的保留等功能。
  10. Drilling track is key factor which decide trenchless success or failure, but controlling drilling track stay around rectifyed phase at the present. guided the theory of force is the key affectting the drilling track, the paper discuss primary factors on contralling drilling track, and advance the formulary ahout reckoning deviation force and azimuth force, expect to achieve the aim that drilling track were controled real time and be anticipated, and have the initiative on drilling track contaolling

    巖層鉆進軌跡是決定非開挖成敗的關鍵因素,目前對鉆孔軌跡的控制僅僅停留在被打糾偏層面上,本文在力是影響鉆進軌跡本質因素理論指導下,對影響巖層鉆進軌跡控制的因素進行了理論探討,並針對造斜力和變方位力提出了計算模式,希望最終能實現鉆孔軌跡的實時監控與調整,變被打糾偏為主動鉆進。
  11. By face failure and ground subsidence investigation and in - suit monitoring analysis in some lots of shenzhen metro phase line, especially of lot 3a in which two large ground landlides have occurred in construction, the reasons of ground subsidence are expatiated respectively from three aspects, including the characters of the physical mechanical parameters of stratum above tunnel, the monitoring analysis of stratum deformation and contruction technics causation

    通過對深圳地鐵期工程土建施工中全線部分暗挖標段出現的工作面失穩、地表塌陷工程實踐和現場監測結果分析,特別著重對連續2次出現地表塌陷的3a標暗挖隧道研究,從隧道上覆地層物理力學性質參數、地層變形監測分析及施工工藝原因3方面闡述了地表塌陷的原因。
  12. At this moment, both the direct signal and the reflected one impinge into the array, and make the amplitude and phase of the echo change, which cannot be separated from the direct one, thus cause server errors of elevation ’ s estimation, even the failure of tracking

    此時直達信號與反射信號同時進入天線,造成回波幅度與相位的變化,並且這種變化不能從直達信號中分離出來,從而造成目標仰角估計的嚴重誤差,甚至引起跟蹤的失效。
  13. Based on field investigation and computer - aided analysis, pavement conditions in the 2nd phase of guangbei section of national highway 108 is identified as premature failure

    通過對路面的實際路況調查與計算機程序分析,可以確定廣北路二期工程的路面破壞性質為早期破壞。
  14. In the 3 ~ 35kv power supply system of our country, the large part is the not solidly earthed neutral system. when the single - phase earthed phenomena happens in this system, this electric power network can run with failure. and in this way the operated cost can reduce greadty. and at the same time the power supply systemic dependability can be improved. but when the single - phase earthed current is large, this electric power system can engender easily arc earthed overvoltage and interphase short circuit by this means

    在我國10 35kv供電系統中,主要為中性點非直接接地系統,這種系統在發生單相接地時,電網仍可帶故障運行,這樣可以大大降低運行成本,提高供電系統的可靠性,但這種供電方式在單相接地電容電流較大時容易產生弧光接地過電壓和相間短路,給供電設備造成了極大的危害。
  15. 1. beside commonly protective function, the product possesses particular designing, thus radically eliminates phase short circuit failure cause by are over. the product has the best security performance

    1 .設計獨特,除具有有通常產品保護功能外,從根本上消除了產品萬一擊穿損壞時可能發生的相間短路故障,具有最好的安全特性。
  16. Upon the investigations, the mean failure rate of the structure is higher during construction phase and aging phase. whereas, in the field of structure reliability, less studies are focused on the aging phase currently

    據調查,結構在全壽命過程中平均失效率較高的是建造階段和老化階段,而老化階段也是當前結構可靠度領域研究較少的階段。
  17. In light of the system fault happened in shaoguan power plant, the electromagnetic process during the open - phase running of gate - out switch of generator - transformer unit is analyzed in detail with the measures to handle the failure included

    結合韶關發電廠曾發生的系統故障,詳細分析了發變組出口開關非全相運行時的電磁過程,提出了限制故障擴大的處理方法和故障發生時的安全處理措施。
  18. By redefining the cardinality of set, we establish the relationship between the domain / range ratio and the testability metric. pie model can help us doing white box test in unit test phase. based on the fault / failure model and conditional probability, a formula is found to get testability metric, with which we prove there is a max value in software testability metric

    在單元測試階段可以運用pie模型幫助進行白盒測試,本文在軟體的錯誤/故障模型的基礎上,運用概率論中條件概率的相關知識,建立了可測試性的一個計算公式,並使用該公式證明了軟體的可測試度存在一個最大值。
  19. With an introduction of the moving block system applied in wuhan rail transit project, the author analyzes atc operation mode which is based on moving block technique, and fallback mode, an auxiliary safety operation when fault occurs in moving block system, finally describes the failure management in the operation of the 1st phase of wuhan urt line 1

    摘要以武漢軌道交通1號線一期工程信號系統的移動閉塞為例,介紹了移動閉塞技術下的atc模式以及針對工程項目制定的運營輔助手段後退模式,並討論了一期工程中運營的故障管理策略。
  20. Phase - failure protection

    端相保護裝置
分享友人