pier foundation 中文意思是什麼

pier foundation 解釋
墩基礎
  • pier : n. 1. 碼頭;防波堤。2. 橋腳,墩。3. 【建築】窗間壁,戶間壁,扶壁;柱,角柱。
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  2. In combination with the work of < the design and technical construction rules of flexible dolphin pier in port engineering > of designing institute of water transport of transport, the data of some typical experiments of domestic and international pile foundation were analysed emphatically. through comparion of the relation of p - y curves between single pile and pile group under lateral loading and lateral reciprocating loading, the experience formula of p - y curve of single pile under reciprocating loading role is put forward

    本文結合中交水運規劃設計院《港口工程柔性靠船墩設計與施工技術規程》的編制工作,著重分析了國內外幾組典型的試樁資料,通過對比水平靜載單樁、群樁和往復荷載單樁p ? y曲線的關系,提出了往復荷載作用下的單樁p ? y曲線的經驗公式。
  3. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  4. The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier no. 2 of wuhan tianxingzhou changjiang river rail - cum - road bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre - tensioning at the anchor pier

    摘要武漢天興洲公鐵兩用長江大橋2號主塔墩基礎大型鋼吊箱圍堰採用工廠整體製造,下河浮運至墩位,利用錨墩施加預拉力精確定位的施工新工藝。
  5. The seismic responses of the pier with shallow foundation on the sites are studied using ansys software, and the computing results with or without the frozen layer under two boundaries are analyzed and compared

    摘要利用ansys軟體,對類場地上的挖井基礎橋墩在兩種邊界條件下的凍土和融土的地震反應進行了計算,並對結果進行了分析和比較。
  6. Works are accomplished as follows in this paper : firstly, according to the real condition of the fourth pier, through analysis of several generally - used anti - slipping schemes, new method has been put forward to substitute anchored column pile with the foundation of drilled shafts so as to prevent cofferdam from slipping

    為此本文主要做了以下工作:首先根據4 #墩基礎的具體條件,通過對現有常用的幾種抗滑方案的綜合比較分析,提出了以工程本身的鉆孔樁基礎代替錨固柱樁防止鋼圍堰滑移的方案。
  7. Strengthening design and construction monitoring of the pile foundation and pier coping of no. 9 pier of xiedie bridge

    謝疊大橋9號墩樁基和蓋梁加固設計與施工監控
  8. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對巖溶地段鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面作一些探討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  9. A finite element numerical model for arch dam - gravity pier - foundation system was established to evaluate the effect of high gravity piers on the stress, deformation and anti - sliding stability of sizhai arch dam, taking the following factors into account, such as the possible elastoplastic deformation of foundation rocks and the nonlinear interaction between the interfaces of gravity pier - dam foundation, the joint surfaces beneath the right bank, and the interfaces of arch dam - gravity pier

    摘要為評價高重力墩對四寨拱壩的應力變形和抗滑安全的影響,建立了拱壩重力墩地基系統的有限元數值模型,其中考慮重力墩基礎、右岸夾層和拱壩重力墩等交界面的非線性相互作用,以及基巖材料的彈塑性變形行為。
  10. With the development of offshore engineering, pile foundation had been widely used in the offshore platform, port pier, etc.

    隨著近海工程的發展,樁基被廣泛地應用於近海平臺、港口碼頭等。
  11. Analysis of calculating method of the natural frequency of bridge pier supported by pile foundation

    樁基橋墩自振頻率計算方法的分析
  12. Belled pier foundation

    鉆孔墩基礎
  13. This paper analyzes the influence of pile spacing, pile diameter and pier cross - section on the stiffness of bridge foundation through the calculation of the longitudinal stiffness at pier - top

    摘要對橋墩縱向剛度進行計算,分析影響橋梁下部結構剛度的主要因素,包括樁徑、樁間距以及墩截面幾何尺寸。
  14. Discussion on design and structure of pier foundation

    墩基礎設計及構造探討
  15. Drilled - pier foundation

    鉆孔擴底墩
  16. According to features of diffcult anti - washing construction of pier foundation under compley hydroraphic, gological, and water potential conditions, combining construction condition methods, author analyze and conclude key points and difficulties of anti - washing construction of the fourth main pier of great sutong bridge, and difficulties in construction and relevant countermeasures

    摘要針對在復雜的水文、地質、河勢條件下進行橋墩基礎沖刷防護施工難度大的特點,結合施工工藝和方法,對蘇通大橋主橋4號主塔墩沖刷防護施工中的重點難點、施工中出現的不利隋況及應對措施進行了分析研究。
  17. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼圍堰與鉆孔樁相結合的復合基礎。
  18. The supporting brackets ( sb ) are designed to transfer the concreting and launching load from the mss down to the pier column ( foundation )

    牛腿設計為將混凝土和推進荷載從mss轉移到墩柱(基礎)上。
  19. It also discusses how to select the reasonable pier stiffness and foundation stiffness under the condition of the same longitudinal stiffness, so as to guarantee the structural design to be rational and economical

    探討在相同剛度的條件下,如何合理選擇墩柱剛度及基礎剛度,以保證結構受力合理且經濟性好。
分享友人