pile column 中文意思是什麼

pile column 解釋
群柱
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  • column : n 1 【建築】圓柱;圓柱狀物〈如煙柱〉。2 【軍事】縱隊 (opp line); 隊;(艦隊的)縱陣,縱列,艦列...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. Compaction pile, compacted column

    地基處理擠密樁
  3. The preparations, drilling rig adjustment, pile distribution control, mixing verticality control, elevation measurement, elevation control of pile top and column bottom, curing agent choice and control of mixing speed and blending quantity, must be done well for strengthening soft soil foundation by mixing cement with soil in construction

    在實踐中要做到6點: 1 )調整好鉆機; 2 )控制好柱的分佈位里與攪拌軸的垂直度; 3 )測量好高程; 4 )控制好樁頂、柱底高程; 5 )選擇好固化劑; 6 )控制好攪拌速度和摻加量。
  4. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗橋設計使用壽命100年的要求,確定出高耐久性混凝土的設計控制指標,基於最緊密堆積原理和最佳漿骨比原理對橋梁的墩柱、蓋梁、預制箱梁和橋面板用高耐久性混凝土的配合比進行設計,並對其施工應用技術進行了研究。
  5. Works are accomplished as follows in this paper : firstly, according to the real condition of the fourth pier, through analysis of several generally - used anti - slipping schemes, new method has been put forward to substitute anchored column pile with the foundation of drilled shafts so as to prevent cofferdam from slipping

    為此本文主要做了以下工作:首先根據4 #墩基礎的具體條件,通過對現有常用的幾種抗滑方案的綜合比較分析,提出了以工程本身的鉆孔樁基礎代替錨固柱樁防止鋼圍堰滑移的方案。
  6. In this paper, by way of example of the elevated pile cap construction of sanmenjiang bridge in liuzhou city, the design and construction of the column steel boxed cofferdam of tensile and compressive type are introduced with particular details given to its design scheme, working principles, construction technology and construction key points, and the matters of attention in the construction with the cofferdam are expatiated as well

    以柳州市三門江大橋高樁承臺施工為例,介紹拉壓柱式鋼吊箱圍堰的設計與施工,重點介紹鋼吊箱圍堰的設計方案、工作原理、施工工藝及施工要點等技術細節,同時對鋼吊箱圍堰施工中的注意事項進行了闡述。
  7. Calculated length of compression bar in pile bent column pier

    單排樁柱墩壓桿的計算長度
  8. 5 ) the method to calculate the natural periods of staggered truss with sshsti with raft - pile foundation is decided, and the natural periods of staggered truss with column foot fixed and sshsti with raft - pile foundation are calculated and investigated

    5 )明確了計算地基及樁筏基礎共同作用時固有周期的計算方法,計高層鋼結構交錯析架體系一與地基基礎共同作用研究算研究了交錯析架體系柱腳固定時和地基及樁筏基礎共同作用時體系的各個固有周期。
分享友人