pile down 中文意思是什麼

pile down 解釋
逐漸停堆
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  • down : adv (downmost)1 向下(面);下,降;在下(面)。 come down 下來;下(樓)來;(雨等)落下。 The...
  1. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的地質災害,它的整治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和地質環境干擾小、工期短、抗滑能力強的滑坡整治方法.風動潛孔錘鉆進是一種具有許多優點的鉆進方法,它的許多特點,如成孔質量高、應用范圍廣、無液體循環介質、鉆進規程參數小、可實現大直徑基巖鉆孔等都適合於抗滑樁施工.文章在介紹風動潛孔錘鉆進特點的基礎上,根據抗滑樁施工要求,分析了風動潛孔錘用於抗滑樁施工的可行性,並舉出了其應用實例
  2. An impressive pile forms. heywood bends down and inhales deeply, smelling the aroma. rapture

    一小排香煙。海沃德低下頭使勁地聞著香煙的氣味,高興不已。
  3. Many survey data refer to mortal down load and sedimentation be produced due to the negative friction in pile foundation. the inequable sedimentation endanger the pile foundation greatly

    國內外一些實測資料表明樁基礎在使用階段負摩擦力可能產生非常大的下拉荷載和沉降,尤其產生的不均勻沉降對基礎危害最大。
  4. If they were all burnt as the grandest of suttees on his funeral pile, it would only be like cutting down an oak after its acorns have sown a forest.

    橡樹種籽入土,百樹挺起,生動表達了他的著作影響廣泛、深遠。
  5. He led her through the wall of prickly trees, that were difficult to come through, to a place where was a little space and a pile of dead boughs. he threw one or two dry ones down, put his coat and waistcoat over them, and she had to lie down there under the boughs of the tree, like an animal, while he waited, standing there in his shirt and breeches, watching her with haunted eyes. but still he was provident - he made her lie properly, properly

    他引著她在不易穿過的刺人的樹叢中穿了進去,直到二塊稍為空曠而有著一叢拓死的樹枝的地方,他把些干拓的樹校鋪在地上,再把他的鈣套和上衣蓋在上面,她只好象一隻野獸似地,在樹下躺下去同時,只穿著襯衣和短褲的他,站在旁邊等待著,牢牢地望著她,但是他還有體貼閡到的,他使她舒舒服服地躺著,不過,他卻他她的內衣的帶子扯斷了,因為她只管懶慵地躺著,而不幫助他。
  6. As soon as we reckoned everybody was asleep that night we went down the lightning - rod, and shut ourselves up in the lean - to, and got out our pile of fox - fire, and went to work

    那天晚上,估計大家都熟睡了,我們便順著避雷針滑了下來,躲進那個披間,把那一堆爛木頭狐火取出來,就動手幹了起來。
  7. He gave the pile of tins a jog and they all fell down.

    他輕輕一碰,那些罐子就都倒了。
  8. Cut three times crosswise. put into a stewing earthen bowl with the backside down. pile the ham slices and mushrooms on the chicken

    將豬裡脊的背脊骨跺去大半,切片,用刀背橫直捶打3遍,切成帶骨肉條,荸薺切片
  9. This machine is a unit machine of non - woven cloth production line, mainly aiming at raising pile and processingof cloth by needl, processing it into the product with goose down pile and loop pile. after arrangement, the cloth can be made into decorative outside material of inside motor vehicle, carpet, toy pile and others

    本機是非織造布生產線中的一臺單元機,主要用於對針刺基布進行針刺起絨加工,加工成具有毛絨面與圈絨面的產品,經后整理后,可製成汽車內飾面料,地毯以及玩具絨等。
  10. In this thesis summarize how to avoid and deal with the negative friction in designing and using. researches indicate : ( 1 ) the negative friction in pile will lead to large number of down load in some designs. this friction must be considered in design to avoid the sedimentation and destroy in the building

    研究結果表明: ( 1 )在工程設計中,有些情況由於負摩擦力產生的下拉荷載數值相當大,在設計中應充分給予重視,以避免在使用中由於下拉荷載使樁的軸向荷載增加引起樁的沉降或不均勻沉降,而導致建築物的破壞。
  11. Using votis electric pile he discovered how to use an electric current to break down various materials into their separate elements.

    他用伏打電池發現通電可將各種物質分解成單質元素。
  12. Operation : pile up two palms, pressing from shoulder bladder down repeatedly for three to six times, then pressing from “ da zhui ” to sacral vertebra

    操作:施術者雙掌相疊,自受術者肩胛處開始,由對側膀胱經從上由下反復按壓三至六次,然後再從大椎處按壓至腰骶。
  13. In gravel stratum, the method combined soil nails and anchor pile is adopted in deep foundation pit bracing, it can obviously cut down engineering cost, raise efficiency and shorten construction period

    在卵礫石地層中,採用土釘和錨桿樁聯合支護技術進行深基坑支護,節省工程投資,提高工效,縮短施工工期。
  14. Once the grouting technique being applied, diameter and length of pile can be decreased. pile ' s tip can be directly laid in gravel and construction work can be cut down, which means lower construction difficulties and less expenditure

    採用樁端壓力灌漿技術,可以減小樁徑、縮短樁長,將樁端位於卵石層或減少卵石層中工作量,從而降低施工難度,減少工程投入。
  15. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與錨拉抗滑樁、擋墻進行支擋結合的處理方法,同時結合截排水等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
  16. Anchor jacked pile is a new technique researched by ourselves for building reinforce and has some strongpoint others have not. twenty years " popularization makes this technique widely used. now anchor jacked pile can be applied in some other project such as correction, ground strengthening, pile foundation ' s top - down construction in newly built building

    錨桿靜壓樁作為我國自行研製的一種地基托換加固新技術,有著其它施工方法所不具有的自身的優點,經過二十年的推廣使用,目前在很多地區已經廣泛使用,而且其適用范圍也從以前的單一的托換加固作用發展成可用於糾偏、補強加固、新建工程逆作法樁基施工等工程。
  17. This thesis put forward a systemic method to settle the negative friction in project design. it includes when the negative friction must be consider, the zero position decided, count the down load, the negative friction group pile, the infection on end - bearing and sedimentation and stability, how to deal with in design to avoid the negative friction and how to solve when the negative friction produced

    本文提出了在工程設計中如何處理樁基負摩擦力的方法,包括什麼情況下考慮負摩擦力、負摩擦力中性點位置的確定、樁基下拉荷載的計算、負摩擦力的群樁效應、負摩擦力對樁基豎向承載力和沉降的影響、設計施工中如何避免出現負摩擦力以及對已經出現的負摩擦力如何根治。
  18. Research on the applying of pneumatic down - hole hammer in anti - slide pile construction

    風動潛孔錘用於抗滑樁施工的研究
  19. Down - the - hole hammer combined with auger drill in the pile of rock foundation

    潛孔錘旋挖鉆機組合在基巖樁施工中的應用
  20. The bones of legs and feet in a pile as kindling for a fire, he couldn ' t cut himself down, i thought, but if he ' ll be patient, it will happen

    腿和腳的骨頭堆在一起,充當引火物,我當時想,他無法把自己砍下來,不過,假如他有耐心的話,是可以做到的。
分享友人