pile section 中文意思是什麼

pile section 解釋
樁段
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. Strengthening ill geologic section road chasm side slope with prestressed achor pile grid beam

    預應力錨桿格梁加固不良地質地段路塹邊坡
  2. Hole completion technology for large - tonnage rectangular section pile in wanfeng road bridge

    萬豐路橋大噸位矩形截面樁成孔施工技術
  3. Failure modes of the tension piles are introduced first. based on the failure modes, the utmost bearing capacity calculations of single uniform - section pile are analysed and studied

    首先介紹了抗拔樁的破壞模式,並在此基礎上分析研究了的等截面抗拔樁單樁極限承載力計算。
  4. In consideration of the soil arch effect between anti - slide piles, a calculation formula for the anti - slide pile spacing was developed, taking the following factors as the controlling conditions - the static equilibrium equation of the frictional resistance and adhesive force between the side of piles and slope soil, which sustains the thrusting force of the landside, and the strength conditions at the medial cross - section and two end sections of soil arch

    摘要考慮抗滑樁樁間土拱效應,以樁側與邊坡土體間的摩阻力及黏著力承擔滑坡推力的靜力平衡條件和土拱跨中與拱腳處截面的強度條件共同控制,建立了抗樁間距的計算公式。
  5. Abstract : the paper is based on the working particle for sever al bridges in the construction of w8 section of sheng - yan railway project. it sy stematicaly instructs the construction method of bore - hole filling pile in the rock area with under - earth mined - out layer

    文摘:筆者以神延鐵路w8標段多座橋梁工程實踐為基礎,系統介紹了有地下采空層的巖石地區鉆孔灌注樁施工的方法
  6. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合作者多年來對華鎣山隧道減少壓煤量研究、深圳地鐵重疊隧道第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰樁施工對策研究和重慶輕軌大坪大斷面車站鄰近基礎淺埋暗挖工法優化分析等諸多近接施工問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下工程近接施工的分類、分區、分區指標表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接施工問題的普遍方法,如數值分析先行,模型試驗、現場測試驗證等。
  7. I - section steel pile

    工字型鋼樁
  8. The pile is assumed to be vertical, elastic and of uniform cross - section, and the soil is regarded as a linear visco - elastic layer with hysteretic damping

    假定樁為豎直彈性等截面體,土為線性粘彈性體,其材料阻尼為滯回阻尼。
  9. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  10. The principal conclusions include : ( a ) the composite system is composed of both active - bearing structural members and inactive - bearing ones, being of a character of combination of rigid retaining structures with flexible ones, so its working mechanism will be behaved as sharing loadings, waterproof and impermeability, loading transfer, local reinforcement and pre - reinforcement ; ( b ) the experimental results show that much more subsoil will participate in retaining action, soil stresses of internal slope will be shared uniformly and deflections caused by excavation will be reduced notably because of cooperation of nails and cement - soil mixing pile wall ; and ( c ) the internal forces of facing in vertical model will be a control factor of design and the cross section tensile strength of cement - soil wall will govern strength of the

    主要研究結論有: ( 1 )復合土釘支護的作用機理主要為臨時加固土體以保證局部穩定、有機聯系以共同承擔荷載、改善土體性質起到止水抗滲作用。 ( 2 )試驗結果表明:復合土釘支護能夠充分調動周圍土體共同作用,有效地控制基坑變形;復合土釘支護中止水帷幕的插入深度和強度對控制邊坡變形與失穩有較大作用;復合土釘支護效果明顯優於一般的土釘支護。 ( 3 )面層與邊坡土體共同變形,設計時可按外力作用下的彈性地基梁進行計算。
  11. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  12. Finally summarizing comprehensively various measures deals with collapsible loess, aiming at property and actual condition of collapsible loess at guanzhong area, taking example for foundation trea tment of xianyang aerodrome speedway, investigating and demonstrating many projects on foundation treatment and think dynamic compaction and lime - soil compaction pile are fit to treat collapsible loess of this section, designing both of the projects and hope to offer suggestions to engineering practice

    最後全面總結了濕陷性黃土處理的各種措施,針對關中地區濕陷性黃土的特點和實際情況,以咸陽機場高速公路路基處理為例,對多種地基處理方案進行研究論證后認為,強夯法和灰土擠密樁法適合該路段濕陷性黃土處理,並分別對這兩種方案進行了設計,以期給工程實踐提供建議值。
  13. Successful application to many station jobsites of the fu - ba line of beijing metro program shows that using the cavern - pile method in loose soft stratum for excavating shallow buried large section tunnels is practicable. therefore it has broad prospect for application

    在北京地鐵「復一八線」多個車站工程中的成功應用,充分證明採用淺埋暗挖洞樁法在鬆散軟弱地層中進行淺埋大斷面洞室的開挖是可行的,具有良好的發展前景和推廣價值。
  14. This paper analyzes the influence of pile spacing, pile diameter and pier cross - section on the stiffness of bridge foundation through the calculation of the longitudinal stiffness at pier - top

    摘要對橋墩縱向剛度進行計算,分析影響橋梁下部結構剛度的主要因素,包括樁徑、樁間距以及墩截面幾何尺寸。
  15. Figure 8 - typical section of driven pile foundation for cooling water pumping station

    圖8 -冷卻用水抽水站打入樁地基剖面圖
  16. The objective function is the cost of anti - slide pile " s per meter ; the constraint conditions are the strength of anti - slide pile " s normal section and inclined section, the ratio of reinforcing design and the size of section in the design code ; the design variables are the height of section, the area of reinforcement and the amount of hoop. and the optimization model is solved by 0. 618 method

    本文提出的優化設計方法,以樁單位長度的總造價為目標函數,以規范對單筋梁的正、斜截面強度,配筋率及截面尺寸等要求為約束條件,以樁截面高度,抗彎縱筋面積,抗剪箍筋數量等為設計變量,來建立優化模型,並用0 . 618法進行求解。
  17. The main original work includes : 1. with laplace transformation, the solution for longitudinal vibration of a pile with variable cross - section is derived when surrounding soil is simulated respectively with normal voigt model and normal maxwell model

    主要工作包括: 1 、採用拉氏變換法分別得到了標準voigt模型和標準maxwell模型條件下成層土中任意段變截面樁縱向振動解。
  18. The load distributed by central piles under vertical load are higher than by others of the pile group ; 2. under higher vertical load, the foundation soil shows an obvious characteristic of plastic strengthening ; 3. the bearing capacity of pile group under vertical load is larger than the whole sum of bearing capacity of single piles in pile group ; 4. the position of the maximum or zero value of bending moment inpiles, the line shape of bending moment diagram and the value of bending moment of the same cross section of a pile under same load is different according to the lateral loading and the longitudinal loading ; 5

    在較大的豎向荷載作用下,土體出現明顯的塑性強化特徵; 3在豎向荷載作用下,群樁的承載力大於各基樁承載力之和; 4沿線路水平縱、橫向加載時,最大彎矩和零彎矩的位置、彎矩變化曲線的形狀以及在相同荷載作用下各樁同一截面的彎矩值都有一定差異; 5
  19. According to the engineering practise data, one method to calculating utmost single - pile bearing capacity is provided after simulating the uniform - section pile " side friction curve by power - function math models. analyse indicates that the method possesses good counting precision

    並結合實測資料,在對等截面樁側摩阻力曲線進行冪函數數學模型擬合的基礎上提出了抗拔樁承載力計算的計算式,分析結果表明:本文提出的計算式具有很好的計算精度。
  20. Figure 9 - typical section of bored pile foundation for cooling water pumping station

    圖9 -冷卻用水抽水站鉆孔樁地基剖面圖
分享友人