pile-fit 中文意思是什麼

pile-fit 解釋
適宜採用樁基的
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  • fit : vt ( tt )1 適合。2 使適合,使適應使(服裝等)合身使合格,使勝任〈美國〉使準備(投考)。3 為…提...
  1. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的地質災害,它的整治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和地質環境干擾小、工期短、抗滑能力強的滑坡整治方法.風動潛孔錘鉆進是一種具有許多優點的鉆進方法,它的許多特點,如成孔質量高、應用范圍廣、無液體循環介質、鉆進規程參數小、可實現大直徑基巖鉆孔等都適合於抗滑樁施工.文章在介紹風動潛孔錘鉆進特點的基礎上,根據抗滑樁施工要求,分析了風動潛孔錘用於抗滑樁施工的可行性,並舉出了其應用實例
  2. The paper can concern the soil ' s instantaneous fallout, soil ' s main settlement due to concretion, and the coactions of soil and pile by applying the contact surface to simulate the coactions. the paper can analyze the service behavior of reuniting foundation and the effect of the pile ' s intensity, length and distance. the paper is concerned with the stressing of pile and the arrangement of pile for the smaller cost to fit the subsidence of throughway

    通過有限元計算,分析了復合地基樁土工作性狀,分析了樁的剛度,長度,樁距對地基沉降及超孔隙水壓力的影響,並根據復合地基中樁的受力特點,提出合理的樁的布置方式,在滿足高速公路路面沉降要求的前提下,節省工程投資,加快建設進度。
  3. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心樁基礎的質量檢測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石壓漿混凝土空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  4. Finally summarizing comprehensively various measures deals with collapsible loess, aiming at property and actual condition of collapsible loess at guanzhong area, taking example for foundation trea tment of xianyang aerodrome speedway, investigating and demonstrating many projects on foundation treatment and think dynamic compaction and lime - soil compaction pile are fit to treat collapsible loess of this section, designing both of the projects and hope to offer suggestions to engineering practice

    最後全面總結了濕陷性黃土處理的各種措施,針對關中地區濕陷性黃土的特點和實際情況,以咸陽機場高速公路路基處理為例,對多種地基處理方案進行研究論證后認為,強夯法和灰土擠密樁法適合該路段濕陷性黃土處理,並分別對這兩種方案進行了設計,以期給工程實踐提供建議值。
  5. It is fit neither for the soil nor for the manure pile ; it is thrown out. " he who has ears to hear, let him hear.

    35或用在田裡,或堆在糞里,都不合式。只好丟在外面。有耳可聽的,就應當聽。
  6. It is fit neither for the land nor for the manure pile ; they will throw it out. he who has ears to hear, let him hear

    35或用在田裡,或堆在糞里,都不合式,只好扔在外面。有耳可聽的,就應當聽。
  7. Lk. 14 : 35 it is fit neither for the land nor for the manure pile ; they will throw it out. he who has ears to hear, let him hear

    路十四35或用在田裡,或堆在糞里,都不合式,只好扔在外面。有耳可聽的,就應當聽。
  8. In the site investigation, we adopt a new machine to mold pile, which handling is easy, the moving is convenience, the power cost is low, bulk is small, and provided some relative technics parameter, the site result indicates that the work efficiency of such machine and technics is very high so as to fit to be used in fa - lime - sulfate concrete pile

    現場研究採用了一種操作簡單、移動方便、能耗低、體積小的施工設備,並給出了有關工藝參數,現場試驗結果表明所採用設備和工藝工效高,特別適合於粉煤灰-石灰-硫酸鹽混凝土樁的施工,有很廣闊的工程應用前景。
分享友人