pillar strength 中文意思是什麼

pillar strength 解釋
礦柱強度
  • pillar : n 1 柱;紀念柱;(柱)墩,柱腳;【礦物】(礦井中硬炭層或巖石形成的)礦柱,煤柱。2 柱狀物〈水柱,...
  • strength : n. 1. 力,力量,體力。2. 強度,濃度;長處;(要塞等的)抵抗力。3. 實力;兵力;全體人數,額定人數,編制。4. 筆力;文勢。5. (證券等的)市價堅挺。6. 〈美俚〉(可能有的)利潤。
  1. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  2. Flying yuan of travel trade group is one is dominant industry with hotel industry, real estate is pillar industry, building materials course of study and other and relevant industry are burgeoning industry, fame the large company group with distinguished, abundant actual strength, total assets many yuan 40

    開元旅業集團是一家以酒店業為主導產業,房地產業為支柱產業,建材業和其他相關產業為新興產業,聲譽卓著、實力雄厚的大型企業集團,總資產40多億元。
  3. Furthermore, the dynamic responses of single deck supported by single pillar are also considered as for the fatigue strength analysis, the fatigue life assessment of the junctions of transverse web frame and side shell, and the junction of pillar and transverse web frame are investigated

    在疲勞強度分析中,本文針對汽車運送船甲板下方橫向桁材與側板接合部分發及艙柱與橫向桁材接合部分進行疲勞壽命分析。
  4. Among hangzhou magnificent blueprint " construct metropolis city, build new paradise ", hangzhou economic and technological development zone vie for opportunity of paying special attention to, grow with each passing hour, is making new developing pillar industries, such as it industry and new medicine industry, etc. with all strength, promote and optimize the structure of industry of hetz effectively, for realize its fast, health and sustainable development

    根據杭州市「構築大都市,建設新天堂」的宏偉藍圖,杭州經濟技術開發區正搶抓機遇,與時俱進,全力打造it產業等新興支柱產業,努力提升和優化開發區產業結構,向實現快速、健康和可持續發展的方向邁進。
  5. China wants to become the strong economic country through - out the world, to enhance its comprehensive actual strength, and raise its national position, china must depend on the completely development of enterprises which undertake the most advanced productive forces in modern times, because enterprises create both social material culture and spirit culture, china must depend on enterprise ' s culture which is the soul and spirit pillar of the enterprises " existing and even development

    中國要成為一個世界性經濟強國,使國家的綜合實力得到增強,國家地位得到提高,必須依賴于現代最先進生產力的承擔者? ?企業,這個社會物質文化和精神文化的創造者的充分發展,必須依賴于企業生存、發展的靈魂和精神之柱? ?企業文化。
  6. Based on the analysis of the evolution of the structural parameters of non - pillar sublevel caving of mines both in and outside china, it is pointed out that increasing continuously the sublevel height is not suitable for application in china because of the limitation of various factors while increasing the access space is the main way to reduce the amount of developing work, reduce the mining cost and increase the one - time caved ore amount so as to raise the mining strength and the labour production rate

    分析了國內外礦山無底柱分段崩落法結構參數演變過程后指出,繼續增大分段高度由於諸多因素的限制,在我國並不適宜推廣應用,而增大進路間距卻是減少採準工程量、降低采礦成本、增大一次崩礦量、提高采礦強度和勞動生產率的主要途徑。
分享友人