pilot lower 中文意思是什麼

pilot lower 解釋
領航塔
  • pilot : n 1 領港員,舵手;【航空】駕駛員,飛行員;領航員;【火箭】起動人員;指導員,領導人;〈美國〉向導...
  • lower : adj 〈low 的比較級〉1 較低的。2 下級的,低級的。 lower animals 下等動物。3 南部的。 in lower Manh...
  1. Comparing to gearless traction machines, kaide series enjoy 40 % less starting current, 12 % more efficiency and physical size installation, which offer lower cost of the overall elevator configurations, such as reduced number of pilot wheels and steel ropes, and associated installation cost and trouble

    相較無齒輪曳引機,啟動電流降低40 % ,效率提高12 % ,又可1 : 1安裝,降低了整梯的配置成本(減少導向輪、鋼絲繩的數量) ,節省了安裝費用及相應麻煩。
  2. Lower the pilot ladder on the port starboard side

    把領航員的包從領航艇上弔上來
  3. In recognition of the lower credit risk of fixed rate mortgages and in line with the practice in the us, the existing 6 - month seasoning requirement for floating rate mortgages will not be applied to the fixed rate mortgages originated under the pilot scheme

    鑒于定息按揭信貸風險較低,同時參考美國的做法,按揭證券公司現時對浮息按揭所定必須已供款個月的要求將不適用於試驗計劃下的定息按揭。
  4. The mapping the pilot training from the lower dimension space to high dimension space, and in the high dimension space, the wave - let kernel function is adopted, according to recursion least square criteria, the lower linear inseparable problem is convert to the separable problem

    然後將根據結構風險遞歸二乘最小化準則回歸估計支持向量機原理,把導頻訓練序列映射到高維空間,並在高維空間採用結構小波核函數,達到了將低維空間的非線性估計轉化為高維空間的線性估計的目的。
  5. Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice

    軟弱大跨超淺埋扁平隧道必須按「管超前,嚴注漿,多分部、短開挖、強支護、快封閉,勤量測」的施工原則進行施工,採用「眼鏡超前,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短進尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。
分享友人