pipe bed 中文意思是什麼

pipe bed 解釋
管墊
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • bed : n 1 床,床鋪;床位,鋪;(動物的)窩;〈比喻〉安樂窩,墳墓;床墊;睡眠;就宿。2 婚姻,夫婦關系。3...
  1. This kind of device effect fine, specially offer to heat power plant use for such as fluidized bed furnace, coal powder pipe line, furnace negative pressure and flue negative pressure measuring to blow continually, as to prevent coal powders and bacco ashes stop up the sampler, ensure automation instrument of power plant normally running and production security

    這種裝置效果良好,專供國內外火電廠硫化床爐煤粉管道爐膛負壓和煙道負壓測量中連續吹氣用,以防煤粉和煙灰堵塞取樣頭,確保電廠自動化儀表正常運行和生產的安全性。
  2. The experience in building large - volume coke oven is summed up in terms of quality management of refractory, building of coke oven body, door, gas offtake pipe, fire bed as well as problems relevant to the building of coke oven body

    摘要從耐火材料的質量管理、焦爐本體的砌築、爐門、上升管、火床的砌築及與焦爐本體砌築相關問題等方面總結了焦爐砌築的經驗。
  3. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆機吊車的水上轉移、承臺吊箱的起吊、鋼管樁的拔除等作業。
  4. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  5. Keda - w series luxury bedsare designed according the theory of physical engineering of human body aesthetics and design experience of similar products main frame is made of square pipe with characters of safety and reliability bed cushions are made of poly - amide resin foam with character of high resilience they are eticulous formed and packed to provide elegance, comfort and durability, fitted with shoes case, rack etc. they are the best choices for luxurious coaches

    系列臥鋪按照人體工程學及美學原理吸取同類產品的先進經驗設計,主體骨架採用方管製作,強度安全可靠;床墊採用聚氨脂高回彈泡沫成型,精心包裝,做工精細並考慮其適用性,裝有鞋盒和托架等,使用方便,乘座舒適,豪華典雅,是豪華大巴的最佳選擇。
  6. The jiangsu decoration industry limited company has the abundant technical force and the advanced mechanical device, has each kind of professionals 200, has the large - scale plate cutter, the booklet bender, the completely automatic pipe bending machine, the lathe, the punch press, drills washes the bed, the injection molding machine, rolls models machine as well as encapsulates the assembly line, the static electricity spurts the creep water line, the rubber brick assembly line

    江蘇寶星實業有限公司擁有雄厚的技術力量與先進的機械設備,有各類專業技術人員200餘名,擁有大型剪板機、折彎機、全自動彎管機、車床、沖床、鉆洗床、注塑機、滾塑機以及包膠流水線,靜電噴塑流水線,橡膠地磚流水線。
  7. A solid - liquid fluidized bed has been designed and installed, which will be used in the heat exchanging and descale field. the experimental study for distributor design was carried out and the particles distribution in the tubes of the solid - liquid fluidized bed under different operating conditions was studied by using the ccd measure system. experimental results show that heterogeneous pores distributor which was arranged in the inlet chamber of the solid - liquid fluidized bed can improve the nonuniform distribution of particles in the pipe bundle under high flow rate. the nonuniform decreases by decreasing the mount of pore, but the solid holdup decreases too. the particles distribution is influenced by the position of the heterogeneous pores distributor

    實驗結果表明:在液固循環流化床進口段安裝可調節高度的變孔徑分佈板,能在較高的流速下,較好的改善固體顆粒在管束中的不均勻分佈;開孔率越小固體顆粒在管束中的分佈越均勻,但管束中粒子的平均固含率也越小;分佈板的安裝高度對顆粒的分佈有很大的影響,在實驗范圍內分佈板的安裝距離管束入口處越遠,顆粒在管束中的分佈越均勻。
  8. Step 6 : after complete the grouting and curing work between all the installation work in the liner ( including process piping, pipe support, etc. ) & liner and rock bed, complete the installation work of top elliptic head of liner using 35 / 50 ton hyd - crane and 25 ton truck crane

    第六步:待襯管內所有的安裝工作(包括工藝配管、管道支架等)及襯管與巖床間的灌漿、養護工作完成後,用35 / 50噸液壓起重機和25噸汽車起重機完成襯管頂部封頭的安裝工作。
  9. The over - bed type cart, however, can also be constructed by adding a spray - pipe to handle the daily watering operations effectively

    若將噴水系統附掛于跨植床搬運臺車上,對于輔助每日之噴水作業有良好的效果。
  10. Put the mattresses, bedclothes, bed sheets, pillow fillers etc. to be disinfected into the attached plastic disinfect cover or sealing bag, and then connect to the gas transport pipe

    用配備的塑料消毒罩或密封袋將待消毒的床墊子、被褥、床單、枕芯等包好,連接消毒器輸氣管。
分享友人