pipe bridge 中文意思是什麼

pipe bridge 解釋
管道吊架
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Design of half - through steel pipe bowstring concrete arch bridge of long - span, and knowledges to it

    大跨度中承式鋼管系桿混凝土拱橋設計和體會
  2. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  3. Sales : imported and domestic natural rubber, butylbenzene rubber, polybutadience rubber, butyronitrile rubber, epdm rubber, butyl rubber, chlorosulfonated polyethylene tyre types superfine, smell - free, butyl, butyronitrile, color and milk natural rubbers, compound rubbers and reclaimed rubbers ; raw and auxiliary materials for rubber chemical such as rubber accelerator, antiager, black, paraffin, octadecoic acid, zinc oxide, magnesium oxide, titanium pigment, coumarone and powder sulfur ; different specifications of epdm color granules, crossover antiskid rubber floor brick, plastic rubber sites, lawn layout, different specifications of antiskid rubber floor brick, rubber blind - people road brick, plant brick, tree guard brick, top adiabatic brick, road rubber reducer brick, special green rubber tyre rubber granule, rubber powder and product, different rubber and plastic pipe, adhesive tape and plate, flexible rubber soft joint, rubber stop tape, bridge extension device, natural rubber plate pedestal, water - expanding rubber, rubber and plastic air duct, pe / pp / pvc water pipe, fulgurite, flame retardant wire gutter, floor wire gutter, mc nylon product, rubber and plastic machinery and fitting relieve, and processing of different ordinary and special rubber and plastic and nylon products

    經營銷售:進口、國產天然膠、丁苯膠、順丁膠、丁腈膠、三元乙丙膠、丁基膠、氯璜化聚乙烯、輪胎類精細、無味、丁基、丁腈、彩色、乳膠類等多種型號天然橡膠、合成橡膠和再生橡膠;硫化促進劑、防老劑、炭黑、石蠟、硬脂酸、氧化鋅、氧化鎂、鈦白粉、古馬龍、工業硫磺粉等各種橡膠化工原輔材料;各種規格epdm彩色顆粒,天橋防滑橡膠地磚、塑膠場地、人造草坪鋪裝、各種規格防滑橡膠安全地磚、橡膠盲道磚、植草磚、樹木圍護磚、屋頂隔熱板、道路橡膠減速塊,專用綠色環保型橡膠輪胎膠粒、膠粉及成品,各類橡膠、塑料膠管、膠帶、膠板,可撓曲橡膠軟接頭,橡膠止水帶,橋梁伸縮裝置,天然膠板式橡膠支座,遇水膨脹橡膠,橡膠、塑料導風筒, pe pp pvc水管、電管、阻燃線槽,地板線槽、 mc尼龍產品、橡塑機械及配件調劑,並承接各種普通、特種橡塑、尼龍產品加工製造。
  4. Construction technique of pressure filling concrete to still pipe inner arch of 75m span tie bar arch bridge

    系桿拱橋鋼管拱內混凝土的壓注施工工藝研究
  5. Aerial pipe line bridge

    架空管橋
  6. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  7. Measurement of the static and dynamic characteristics of the cable stayed pipe bridge over the nanguang river

    南廣河斜拉索跨越管橋動靜特性測試研究
  8. Dynamic characteristics of cable - stayed pipe bridge on fujiang while pigging

    涪江跨越斜拉管橋清管時動態力學特性
  9. This machine is available to driver different kinds of piles, such as prefabricated concrete piles, steel pipe piles, steelplate piles, etc. it is a convenient machine for construction of building, bridge, port

    本樁架適用於打植混凝土預制樁、鋼管樁、鋼板樁,是建築、橋梁、港口施工中機動靈活的樁工施工機械。
  10. The reason of blocking pipe while pouring the pile of bridge foundation is analyzed, and the dealing methods are expounded

    對橋基礎灌樁堵管進行了原因分析,論述了堵管事故的處理方法,闡明了灌樁堵管的具體對策。
  11. Abstract : the reason of blocking pipe while pouring the pile of bridge foundation is analyzed, and the dealing methods are expounded

    文摘:對橋基礎灌樁堵管進行了原因分析,論述了堵管事故的處理方法,闡明了灌樁堵管的具體對策。
  12. Modify above model along with altering structural form or the constitution of the bridge, such as different standard, steel ratio, steel pipe diameter, concrete module, brace allocation, the length of concrete of the main ribs, suspending pole mode and cable local vibrations, calculate the variety of dynamic character, analyze this factors which will affect. 2

    對斜拉拱橋自振特性進行參數分析,分別考慮了不同規范、含鋼率、拱肋鋼管直徑、混凝土彈性模量、橫撐布置、拱肋段混凝土長度、吊桿形式對自振特性的影響,最後考慮了斜拉索局部振動對自振特性的影響。
  13. Yongfu water pipe bridge light sculpture

    永福水管橋光雕:
  14. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  15. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。
  16. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  17. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一節制閘(而岸丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入水源地的截污工程; ( 2 )引水工程:是截污工程的配套工程,利用下游長蕩湖來補充水量,並對3個引水工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略水源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  18. Asymmetric construction of steel pipe concrete arch rib tied arch bridge

    鋼管混凝土拱肋系桿拱橋不對稱施工
  19. Detection of arch rib concrete density of a concrete - filled steel pipe arch bridge

    鋼管混凝土拱橋拱肋混凝土密實性檢測
  20. Abstract : large transmission main pipe line engineering, treated foundation on deep muddy, thick backfilling ground is introduced in this paper, cement mixed combined earth foundation is designed and calculated, pipe bridgepipe pass through dam and etc, technical measures are also introduced

    文摘:本文介紹深淤泥厚填土場地大型輸水干管工程的地基處理,水泥攪拌樁復合地基基礎設計與計算及過橋管、過堤管等的技術處理措施。
分享友人