pipe culvert 中文意思是什麼

pipe culvert 解釋
管道涵洞
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • culvert : n. 暗渠,陰溝;【電學】電纜管道;涵洞。
  1. Frost heaving analysis of corrugated pipe culvert without foundation in permafrost region

    多年凍土地區無基波紋管涵洞凍脹分析
  2. Standard specification for steel sheet, zinc and aramid fiber composite coated for corrugated steel sewer, culvert, and underdrain pipe

    波紋鋼制下水溝暗渠和雨水管用鋅和芳族聚酰胺纖維復合塗覆鋼板的標準規范
  3. Standard specification for nonreinforced concrete sewer, storm drain, and culvert pipe

    無鋼筋混凝土下水道暴雨下水道和涵管的標準規范
  4. Standard specification for reinforced concrete d - load culvert, storm drain, and sewer pipe

    鋼筋混凝土d型承重涵管雨水管和污水管的標準規范
  5. Standard specification for reinforced concrete culvert, storm drain, and sewer pipe metric

    鋼筋混凝土製涵管雨水管和污水管的標準規范米制
  6. Standard specification for nonreinforced concrete sewer, storm drain, and culvert pipe metric

    無鋼筋的混凝土下水道暴雨下水道和涵管標準規范
  7. Standard specification for reinforced concrete d - load culvert, storm drain, and sewer pipe metric

    鋼筋混凝土d型承重涵管雨水管和污水管的標準規范
  8. Standard specification for nonreinforced concrete specified strength culvert, storm drain, and sewer pipe metric

    規定強度的無鋼筋混凝土涵管雨水管和污水管
  9. Standard specification for nonreinforced concrete specified strength culvert, storm drain, and sewer pipe

    規定強度的無鋼筋混凝土涵管雨水管和污水管的標準規范
  10. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一節制閘(而岸丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入水源地的截污工程; ( 2 )引水工程:是截污工程的配套工程,利用下游長蕩湖來補充水量,並對3個引水工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略水源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  11. Standard practice for installation of precast concrete sewer, storm drain, and culvert pipe using standard installations

    使用標準設備安裝預制混凝土下水道暴雨下水道和涵管的標準實施規程
  12. Contrast to other bridge and culvert, the advantages and disadvantages of csbcs are systematically analyzed, what more, the further research on the application of cspi ( corrugated steel pipe ) to both at home and abroad, construction technique thereof are made time

    本文首先系統地分析了波紋鋼板橋涵和其他橋涵相比所具有的優缺點,深入研究了波紋鋼管的國內外的應用現狀,以及其施工工藝。
  13. Standard specification for reinforced concrete culvert, storm drain, and sewer pipe

    鋼筋混凝土製下水道雨水管和物水管的標準規范
  14. Standard specification for reinforced concrete arch culvert, storm drain, and sewer pipe

    鋼筋混凝土製拱形排水管雨水管和污水管的標準規范
  15. The provision of a new pipe suction culvert under the cwb tunnel would impose construction difficulties and maintenance problems

    -在中環灣仔繞道隧道之下敷設新的吸水暗渠,在施工方面會出現困難,而維修方面亦會有問題。
  16. Based on the characters of rccp ( reinforced concrete culvert pipe ) optimal design, it imports the design theory of discrete optimum design of structures, and more analysis has been taken on samples on this design theory

    並根據鋼筋混凝土管道優化設計的特點,引入了離散變量結構優化設計的設計理念,然後通過算例對此種設計思想進行了進一步的分析。
  17. For the needs of second - term project for pudong airport there is possibility to construct a tunnel of serving driveway under the operating runway, but it s obviously of great difficulty, and nowdays there are few such projects for reference, so it is urgent to carry out the research to make sure of the feasibility for the construction based on the analysis of geologic information, cross section of the line and restriction of construction, in this paper three construction schemes and the effects of each scheme were analysed : cut and cover method, pipe roof culvert box advancing method. shield driving method

    摘要浦東國際機場二期工程建設存在著在運營跑道下實施地下穿越的可能性,在運營跑道下實施地下穿越難度很大,而目前國內外軟土地區在跑道下實施地下穿越工程很少,因此論文通過研究分析了服務車道地下穿越跑道區域的可行性及方案。
  18. Standard specification for manufacture of reinforced concrete sewer, storm drain, and culvert pipe for direct design

    直接設計的鋼筋混凝土污水管雨水管和涵管的生產標準規范
  19. Standard specification for manufacture of reinforced concrete sewer, storm drain, and culvert pipe for direct design metric

    直接設計的鋼筋混凝土污水管雨水管和涵管的生產標準規范
  20. Standard specification for reinforced concrete arch culvert, storm drain, and sewer pipe metric

    鋼筋混凝土製拱形排水管雨水管和污水管的標準規范
分享友人