pipe jacking method 中文意思是什麼

pipe jacking method 解釋
頂管法
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • jacking : n. 1. 【紡織;印染】(走錠紡紗機的)走車牽伸;疊層軋光揉布工藝。2. 用篝燈打獵[捕魚]。
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. The penetration test study the disturbance of soil in difference location. by using finite element method, the paper study the stratum movement and the earth surface deformation caused by pipe jacking, analysis the construction parameter such as head pressure, deflexion, friction force impact on earth surface deformation, give the distributing rule and range of additional soil pressure in soil

    採用有限元計算分析的方法,對頂管施工引起的地層運動及地表位移進行研究,分析了機頭土壓力、機頭偏斜、摩阻力等不同施工參數對地表變形的影響以及附加應力在土中的分佈規律和影響范圍。
  2. By making use of the semi - analytical element method, the three - dimensional soil movements problem of pipe jacking is transfered to a one - dimensional numerical calculation

    利用半解析單元法將頂管施工中三維土運動問題轉化成一維數值計算。
  3. Laying of watermain by pipe jacking method in urban area

    在市區採用頂管法鋪設水管
  4. Study on calculational method of ground settlement induced by level parallel pipe jacking

    水平平行頂管引起的地面沉降計算方法研究
  5. The two different method have to be devised about the air - power pipe - jacking and the bigger caliber steel pipe

    氣動小口徑頂管和大口徑鋼管頂管是兩種完全不同的頂管方法。
  6. Finally, an example of circular jacking pipe constructed by smw method was analyzed, cws ' s specificity of material zoning in circular direction was clarified. the paper ' s main research findings are to propose ring - beam load - distribution theory provide cws ' s calculation method and program software

    最後,對一個用smw工法建造的圓形頂管工作井工程實例進行了分析,闡明了沿環向材料分區時的工作井的一些特殊特徵。
  7. The disturbance of soil induced by pipe jacking is studied with theoretical method. based on the former research, the disturbed soil is divided into different zones according to their degrees of disturbance, which is more accorded with fact

    對頂管施工產生的土體擾動進行了理論分析,在前人的基礎上提出了更加符合實際情況的受擾動土體分區圖。