pipe outlet 中文意思是什麼

pipe outlet 解釋
管式出水口
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • outlet : n. 1. 出口,出路;排水口;通風口。2. 【商業】銷路。3. 批發商店。4. 發泄(情感)的方法;排遣。5. 地方廣播電臺[電視臺]。
  1. An outlet pipe leads from the bottom of each lysimeter to overflow tanks

    一條引出管由裝置底部伸到承接漏水的容器內。
  2. An outlet pipe leads from the bottom of each lysimeter to overflow tanks. sufficient water is sprinkled on the grass every evening to ensure that a small overflow occurs in the outlet pipes before observation is taken the next morning

    上面種滿短草。一條引出管由裝置底部伸到承接漏水的容器內。每日黃昏時草面都灑上足夠水分以使翌日早晨引出管有小量水分流出。
  3. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定負荷下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上額定負荷;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  4. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導配筋。
  5. The outlet pipe of the vod can reach temperatures up to 120

    Vod的出口溫度能達到120高溫,所以必須預防接觸。
  6. Rhl - 2000b is a circulatory exosomatic heating system used for intra - peritoneal hyperthermic perfusion iphp of chemotherapy. the system has a peristaltic pump and a microwave heater, which could provid continual circulatory heating for chemotherapeutic drug and saline water. several pipe with electronic thermometry at entrance or outlet convey the heated

    運用熱化療灌注機的體外加熱裝置,將熱效應好的化療藥物和鹽水加熱到45 ,運用體外循環泵將其導入體腔內,並且持續循環通過測溫系統監測出水口,入水口和體腔內的溫度,確保體腔內的溫度維持在42 - 43的治療溫度,並且維持一定的時間,以達到使腫瘤細胞凋亡並沖出體外的方法。
  7. Oil pump outlet pipe

    機油泵出油管
  8. The method of hydraulic calculation with non - pressure flow from the outlet pipe of the warping dam

    淤地壩涵管無壓流水力計算方法
  9. ( 3 ) the transformation for turbo cycling compressor is designed in both differential pressure seal parts at the inlet and outlet and the connecting construction of the positioning key and turbo cycling compressor casing : replace wave pipe of differential pressure seal parts with asbestos jointing and improve its reliability ; jointing connection of the positioning key and turbo cycling compressor casing has been converted into screw thread connection and avoid the dangers from jointing crack

    ( 3 )從進出口壓差密封部件和定位鍵與外殼間聯接結構兩方面入手,提出了相應的改造方案:將機組進出口壓差的密封部件由波紋管改為石棉填料函,提高了其運行可靠性;將內件周向定位鍵與外殼間的聯接結構由焊接改為螺紋聯接,避免了焊接裂紋引起的安全事故。
  10. The process of effluent flow during loading in self - propelled trailing suction hopper dredgers was simulated by way of physical modeling and was measured and analyzed by using the flow rate and concentration of spoil in the hoppers, particle sizes of sediments at the inlet and outlet of the effluent flow pipe and hopper volume as the major control parameters

    摘要通過物理模型試驗模擬自航耙吸挖泥船裝艙溢流施工過程,以艙內流速、艙內濃度、溢流進出口泥沙粒徑、裝艙量幾方面為主要控制因素,進行實測、分析,並比較自航耙4種常用裝艙裝置的消能效果。
  11. 4dm outer - thread copper pipe union of the inlet and the outlet

    進水口出水口為4分15外螺銅管接頭
  12. 4dm inner - thread flexible joint copper pipe union of the inlet and the outlet

    進水口出水口為4分15內螺紋活接銅管接頭
  13. In this event, we also launch some new products : new unifill which can meet the new national standards, flushing valve i mpulsbasic 230 duo asia, washbasin faucet hybasic41, geberit uniflex floor drain box, geberit pe - silent pipe and geberit monsoon pluvia outlet

    新品發布在此次活動中,吉博力在亞太區投放新型unifill進水閥, duo ii出水閥, hybasic41頭, uniflex地漏, hdpe靜音管和pluvia大流量虹吸雨水斗六種產品
  14. Through developing a 2 - dimensions heat transfer model of buried pipe - in - pipe heat exchanger and simulating the process by computer, the author figures out inter - relations of factors which influence characteristics of buried pipe - in - pipe heat exchanger, such as pipe diameter, pipe length, ratio of pipe diameters, flow rate, inlet water temperature, patterns of water inlet and outlet, and material features made of pipe, and proposes some optimizing indexes of buried pipe - in - pipe heat exchanger. the author studies the " heat - - short circuit " phenomenon as well and gives < wp = 5 > some important results

    本文通過建立地下套管式埋管換熱器傳熱過程的二維傳熱模型,並藉助計算機對分析結果進行解析,弄清了影響埋管換熱器性能的管徑、管長、管徑比、通過流量、進水溫度、進出水方式以及管材等參數的作用,並提出了相應的優化指標,對研究界懸而未決的「熱短路」問題也進行了細致分析,得出了有關結論。
  15. Macromolecule oilproof liquild sealant is used for adhensive and seal of motor engines, cylinder botton, oil undeypan, steam inlet and outlet pipe, gear shifting box, and gas thread

    高分子耐油液體密封膠,用於粘接和密封各種機動車輛發動機缸墊、油底盤墊、進排氣管墊和變速箱底盤墊等及各種管道螺絲的密封。
  16. When the system finishes water supply, this valve can automatically supplement air into the sealed water pipe, which can be evacuated just to open the valve at the outlet, suitable for the evacuation and freeze - proof system of water supply etc. facilities

    自動充氣排空管系統供水完成後,該閥可自動補充空氣進入密封水管,將下水端閥門打開即可實現水管的排空,適用於供水等設備的排防凍系統
  17. Pig inlet & outlet and oil ( air or water ) inlet shall be connected respectively to the main pipe by valves

    收發球口和進油(氣、水)口分別通過閥門與主管線連接。
  18. Fcd. 3 138b : 4ds outer - thread copper pipe union at both ends of the inlet and the outlet

    Fcd . 3 138b :進水口出水口兩端為4分15外螺紡銅管接頭
  19. Fcd. 3 138c : 4ds outer - thread copper pipe union at both ends of the inlet and the outlet

    Fcd . 3 138b :進水口出水口兩端為4分15外螺紡銅管接頭
  20. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱泵系統停機一周內地溫恢復特別快。
分享友人