pit work 中文意思是什麼

pit work 解釋
鑄錠工作
  • pit : n 〈美國〉(桃、杏等的)核。vt ( tt ) 除去…的核。n 1 坑,凹地,凹處;【礦物】礦井;煤坑;【植物...
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. He has to work in coal pit

    他必須到小煤窯背煤。
  2. Undermentioned work has been done in this paper for the pit deformation

    對于基坑變形本文做了以下幾方面的工作。
  3. During bank slope excavation in cofferdam in a harbor construction, the work had to be suspended due to water leakage ( river water and ground water ) into the foundation pit

    摘要某碼頭工程在採用圍堰進行岸坡開挖過程中,受江水和地下水位的影響,基坑內有水滲入導致工程無法進行。
  4. The calculation result effectively indicate the change rule with the time and space of water table of the aquifer, soft dank aquifer, parameter in process of wells work in the pit

    計算成果較好地刻畫了基坑井群的實施過程中含水層、弱透水層水頭、參數的時空變化規律。
  5. The formula of the maximum lateral deformation has been proposed for tie - back wall when the anchors are embedded in unmoving soils or in rocks. this work has enlarged the application field of the previous deformation formula. examples from engineering practice prove that the values calculated with above formulas can meet the need of the pit engineering

    將上面的變形計算公式做了推廣,提出了錨撐擋墻最大側向位移的預測公式(錨桿錨固不可移動的土層或巖石中) ,工程實例表明,利用該式預測的變形值可以滿足工程的需要。
  6. In this work, un - doped and nano sic doped mgb2 / fe tapes and wires were fabricated by the powder in tube ( pit ) technique, and the short samples were synthesized through two different routes of the traditional vacuum sintering and the sparking plasma sintering ( sps ). the sintering parameters were optimized in both sintering methods

    本文採用粉末套管法( powderintube )原位( in - situ )制備了非摻雜和納米sic摻雜的mgb2 / fe超導線帶材,分別採用常規真空燒結和放電等離子燒結( sps )兩種方式合成mgb2超導相,優化了燒結工藝參數。
  7. This thesis makes the systemic research work that aims at the management system of ore blending in sandaozhuang open - pit, and realizes automation for management system of ore blending

    本論文針對三道莊露天礦配礦管理系統進行了論述和探討,實現了配礦管理系統的計算機自動化。
  8. Effect of steel pit on the mechanical property was discussed in succession. numerical results show that exponential relation exists between the yield strength and depth of corrosion pit. the work in this part is the theoretical foundation on the study in modeling of constitutive behavior of the corroded concrete and rusty rebar

    基於微觀腐蝕機理分析了硫酸鹽介質對混凝土的膨脹性腐蝕作用,從理論上研究了由於膨脹作用引起混凝土內部產生的膨脹應力;討論了鋼筋表面銹蝕坑對鋼筋力學性能的影響,建立了鋼筋屈服強度與蝕坑深度之間的關系;為受腐蝕混凝土和銹蝕鋼筋本構關系的建立提供了一定的理論基礎。
  9. Making pit geology work well basic security of realizing coal mine safyfy

    加強礦井地質工作實現煤礦安全生產
  10. Through reforming in steady flow unit of sludge pit feeding, the work efficiency was lifted, the slime amount fed in floatation system was reduced. the consumption was dropped and the enterprise economic benefit increased under the premise of finishing all technology target

    對撈坑入料裝置的改進,提高了撈坑的工作效率,減少了進入浮選系統的煤泥數量,在完成各項技術指標的前提下,降低了各種材料的消耗,增加了企業的經濟效益。
  11. Only there was something in their deep - mouthed slurring of the dialect, and the thresh - thresh of their hob - nailed pit - boots as they trailed home in gangs on the asphalt from work, that was terrible and a bit mysterious

    不過在他們的含糊不清的土話里和他們在瀝青路上曳著釘底鞍。一群一群的散工回家時候的嘈雜聲里,卻有些什麼可怕而有點神秘的東西。
  12. Thankfully, the actuator does all the hard work, so the driver and pit crew don ' t have to

    謝天謝地,驅動器完成所有艱難的工作,因此不需要車手和維修站人員動手。
  13. Application of composite soil nailing technology to shoring work of foundation pit taking guangzhou area as an example

    復合土釘墻技術在深基坑支護中的應用
  14. As a new retaining structure, composite soil nailed wall has been widely applied in the foundation pit now, research on the work performance of the soil nailed wall during the construction can not reveal on - site work, this occurs especially in xi ' an area with rich groundwater where groundwater is forbidden to be lowered

    復合土釘墻作為一種新型的擋土結構,目前在基坑工程中得到了較為廣泛的應用,然而對復合土釘墻在施工過程中的工作性能的理論研究卻遠遠落後于工程實踐。尤其在西安地區地下水位較高且不能降水的前提下,當採用復合土釘墻進行基坑支護時,對其工作性能的研究幾乎為零。
  15. Construction quality control, progress control, investment control, contract management, bidding for construction project, deep foundation pit support work, mass concrete construction technology, project management

    建設工程質量控制、進度控制、投資控制、合同管理;建設工程招投標,深基坑支護、大體積砼施工技術、工程項目管理。
  16. Ensure that the side of the excavation pit is properly shored before you go down to do work

    進入坑洞里工作前,先確定坑洞的墻壁是否有支柱牢固地支撐著。
  17. In order to decrease the size of fragmentation and reduce blasting vibration effects on the stability of eastern open pit slope of tongshankou copper mine < this work involved two steps. first of all, based on the experiment in laboratory, this paper presented the optimum blasting parameters and applied it in practice

    為降低銅山口礦露天采場生產爆破的大塊率和地震波振動強度,保證采場東幫陡邊坡的穩定,本文在對國內外大量文獻綜合調研的基礎上,首先採用正交設計對現場爆破參數進行了室內模型實驗,得出優化的模型爆破參數后又應用於生產。
  18. The work principle of inclined pipe and setting device is analyzed, the feasibility in reforming sludge pit by shallow layer settling technology is approached

    分析了斜管沉澱裝置的工作原理,探討了應用淺層沉澱技術改造撈坑的可行性。
  19. Abstract : the work principle of inclined pipe and setting device is analyzed, the feasibility in reforming sludge pit by shallow layer settling technology is approached

    文摘:分析了斜管沉澱裝置的工作原理,探討了應用淺層沉澱技術改造撈坑的可行性。
  20. 7. according to the factual character, creating the tridimensional fmit element model under the factual work condition and the space effect, analysis the deforming phenomenon of pit. and analysis the factors " sensibility that influence pit ' s stability

    7 、根據工程的實際特點,建立基於實際工況的考慮空間效應三維有限元模型,對基坑的變形現象進行了分析,並對影響基坑安全穩定的各因素進行了敏感性分析。
分享友人