planned adjustment 中文意思是什麼

planned adjustment 解釋
計劃調節
  • planned : 按計劃的
  • adjustment : n. 1. 調整;調節(裝置);校正。2. 調節。3. (賠償損失的)清算。
  1. Japanese modal emphases on the planned economy modal, based on it, macro - control laws are made, guiding the economy ; american modal emphases on the economic plan, rooted from the theory of kerns and anti - dump and the functional adjustment of financial system

    日本模式,主要以經濟計劃模式來調控經濟運行,制定宏觀調控法律;美國模式,重視經濟計劃,把凱恩思的財政赤字政策作為反經濟危機的主要手段,特別注重財政政策的調節作用。
  2. The above service adjustment measures have reduced about 900 bus trips passing through central per day. eight bus - bus interchange schemes are planned

    實施上述的調整服務措施后,令途經中環的巴士每日減少900班。
  3. However, along with the unceasing consummation of our country ’ s market economy system, the adjustment of our equipment management system, and the reform of our equipment acquistion system, military representative system of our country, which takes adapts with traditional planned economy system, has not been able to adapt the new situation. it has revealed more and more questions in the actual work, which urgently needs to reform

    然而,隨著我國社會主義市場經濟體制的不斷完善、我軍裝備領導管理體制的調整和裝備采辦制度改革的不斷推進,作為與傳統計劃經濟體制相適應的我國軍代表制度,已不能適應新形勢和任務的要求,其制度本身以及軍代表在實際的工作當中暴露出越來越多的問題,迫切需要改革。
  4. Firstly, this paper finished the general design of system control, planned the control structure and the method of generating joint track, and implemented a working mode, which included a multi - levels control scheme, off - line planning and real - time zmp errors adjustment. and all these can guarantee the flexibility for adjusting gait while the robot is walking

    本文首先對人形機器人的控制系統進行總體設計,對控制結構和關節軌跡生成方式進行規劃,採用分層遞階的控制結構,離線規劃和zmp誤差實時調整相結合的工作模式,實現機器人穩定行走時步態調整的靈活性。
  5. 464 we have planned to finish the adjustment of the machine before tuesday

    我們應該漸漸地增加壓縮機的壓力,並逐步投入滿負荷運行。
  6. Business valuation based on modern economy is one of the most difficult and comprehensive professional work in asset appraisal, but also stands for the trend of the appraisal. as china implemented planned economy all the long in the past years, the concept of business value was proposed later than other advanced countries. the study on the theory and method of business valuation we made is relatively backward. all these lead to that we merely use cost method in practice. with the improvement of market economy, the validity of cost method is challenged. hunting for appraisal methods suitable for china circumstance has become more and more urgent. this thesis presents its own opinion on the adjustment of the basic frame of theory of business valuation. for the first time, it puts systems theory into the study of the theory base, and believes that the enterprise as a compound entity has higher efficiency than the sum of its constituent, and then proposes new appraisal assumption. aiming at the obscure understan ding, it analyses a group of conception related to business valuation. after giving a whole analysis and study, this thesis indicates the income approach which emphasizes earning - capacity of a enterprise should become the correct choice of china, and makes a further study on the origin - features and feasibility of this method

    植根于現代經濟的企業價值評估是資產評估中綜合性最強,技術難度最高的業務之一,也是評估業未來的發展方向,由於我國過去長期實行計劃經濟體制,企業價值概念的提出和運用時間較晚,缺少現代經營理念的積累,企業價值評估的理論與方法的研究比較滯后。本文試圖以理性分析和案例分析相結合的方法,系統研究和分析企業價值評估的基礎理論及其現實條件下,適應我國經濟發展的評估方法,以期為構建有中國特色的企業價值評估理論和方法體系做一些有益的探索。文章以企業價值評估的基本概念為起點,在對眾多關于企業性質的學說和理論觀點進行概括抽象的基礎上,指出了整體性、持續經營和盈利性是企業的重要特徵,依據企業的整體性運用系統方法闡明了企業的價值大於組成企業的單項資產價值之和,據此提出了反映企業價值評估特點的有機組合增殖假設;依據盈利性的特點,強調了企業價值評估的核心應為企業的獲利能力,而不是組建企業的成本;對企業價值、企業價值評估含義、特點的論述以及對相關概念的辨析表明了作者的個人觀點和文章的基本定位,而從評估目的入手劃分的以產權變動為目的的企業價值評估和以財務決策為目的的企業價值評估與企業價值評估的假設、評估核心共同決定了評估方法的選用。
  7. Economic working - market system and planned adjustment

    市場機制與計劃調節
  8. The railway track adjustment was planned to be carried out from 10 : 00 pm on wednesday to 1 : 30 am on thursday and the trains passing by were asked to slow down their speed to 45 kilometers per hour from 9 : 00 pm

    當時周三22時至次日1時30分要進行鐵路線路的調整,經過的列車從當日21時起施工范圍內列車限速每小時45公里運行。
  9. For construction pace management, the author analyzes the reason of construction postponing and brings forward relevant solutions. for construction quality, the author lists the factors which affect construction quality, and describes the means of quality control, moreover, the accidents during construction are analyzed and correspondent solutions are put forward. for project cost control, the author illustrate how to balance construction cost, quality and term, in addition, the defects of project cost management are analyzed, and correspondi ng solutions are constituted china is in the process of the transition from planned economy to market economics, system reformation and operation adjustment become important jobs for construction enterprises

    在施工項目進度管理方面,分析了施工項目進度拖延的原因及應採取的措施,同時還說明了施工項目進度實施階段的目標管理;在施工項目質量管理方面,分析了影響質量的因素,並結合實際,說明了施工項目在質量管理方面的一些做法,同時對施工項目質量事故進行了分析,並提出了相應的對策;在施工項目成本管理方面,闡述了施工項目成本管理的對象和內容,並說明了成本管理的實施辦法。
分享友人