plant construction contract 中文意思是什麼

plant construction contract 解釋
工廠建造合同
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • contract : n 1 契約,合同。2 婚約。3 承包(合約)。4 【法律】契約法。5 【牌戲】定約,合約橋牌。6 〈主英方〉...
  1. But contract payments on property, plant and equipment purchased or on construction - in - progress for construction to be used in operation should be classified under property, plant and equipment

    但因購置固定資產而依約預付之款項及備供營業使用之未完工程營造款,應列入固定資產項下。
  2. Which is approved in contract and waiting for building. are located in along - the - river industrial park. electricity is plenty : an in - construction heat and power plant being located in high technical zone and central electricity and heat supply being available after the plant completion

    常熟發電廠和已簽約待建的常熟第二發電廠皆座落於沿江工業園區,電源充裕在建的開發熱電廠布局在高新技術區,竣工后可集中供電供熱。
  3. Bhp engineering designed and advised on the construction and commissioning of the shunchang cement plant in fujian province, which opened in 1989. as part of its contract, bhp engineering trained 40 chinese engineers and operating specialists in australia

    Bhp工程公司對1989年成立的福建省順昌水泥廠進行了設計,並對其建造和試運轉提出建議。作為其合約的一部分, bhp工程公司在澳大利亞對40名中國工程師和操作專家進行了培訓。
  4. It analyses institutions consummating, claim management in the stage of project bidding ( such as investigating jobsite, studying bidding documents and contract negotiation ) and construction in ar company. by studying a claim case of h hydropower plant of ar company, it states the features of claim management of hydro electrical project and comments its advantages and disadvantages in claim management, pointing out that claim management is in the starting stage in ar company which details insufficient knowledge on claim, weakness in market risks and claim consciousness, claim analysis and control system is not perfect, lack of professional person in claim and internal information flow is not smooth

    論文分析了ar公司各項制度建設情況、工程投標階段索賠管理情況(如勘察施工現場、研究招標文件及合同談判等)及工程實施階段索賠管理情況,通過ar公司h水電站索賠管理案例分析,闡述了公司水利水電工程索賠管理的特點,其索賠管理現狀具體表現為:對索賠認識不足、市場風險及索賠意識不強,索賠分析與控制體系不完善、缺乏索賠專業人才以及內部管理信息流通不暢。
  5. Plant construction contract

    工廠建造合同
  6. March 10th. new plant construction signature ceremony was hold at xmal. mr. salles, representative of xmal and liu rongpu, representative of yongye group signed the building contract for new plant

    3月10日,新廠房建設簽字儀式在辦公樓會議室進行,總經理薩勒斯先生和劉榮甫先生分別代表徐州美馳和永業集團在新廠房建設合同上簽字。
分享友人