point diagram 中文意思是什麼

point diagram 解釋
點圖表
  • point : n 1 尖頭,尖端;尖頭器具;〈美國〉筆尖;接種針,雕刻針,編織針;小岬,小地角;【拳擊】下巴。2 【...
  • diagram : n. 圖,圖形,圖解;【數學】作圖。 a diagram of an engine 發動機設計圖。vt. (-gram(m)ed; -gram(m)ing) 用圖表示,圖解。
  1. At 98 years of school life empress, started my design the human life into the brilliant design company of a by name sunlight, this this profession of special features, be engaged in the work in, and think under the aureate ray of light company, can have a good human life point of departure, at some foundations that own the design and furniture etc. the aspect to have got point of departure of the company have to my human life very big, fine human life, but however and did not expect clip to take dirty with the bogus circumstances that not norm, the company is an achievement person of, but why is a mistake person of human life, therefore is how, again how to take the letter and customer, street emotion, threaten, violence means of etc., can do out what matter, not think with the this kind of company no chance, but encounter to the right and wrong that falsely be, i occupy the regrets, and do so the person, like this company that work, ( three diagram papers want to cheat the customer ), this is the what kind of company

    學校生活后,進入一家名為陽光燦爛的設計公司開始了我的設計人生,本著本專業的特長,從事著份內的工作,以為在金色的光芒下公司,能有一個好的人生起點,在擁有設計及傢具等方面有著一些基礎的公司對我的人生的起點有很大的、美好的人生,但卻不料夾帶著骯臟和不規范的騙人的事態,公司是成就人的,而為何是誤人的人生,可見是如何,又如何取信與客戶,街著情感、威脅、等暴力手段,可以做出什麼事,不想與此類公司無緣,但遭到不正當的是非,我有事感慨,如此做人、如此做事的公司, (三張圖紙想騙客戶) ,這是什麼樣的公司呢?
  2. A boiling point diagram is a most convenient aid.

    沸點圖是一種最方便的手段。
  3. The infinite solid insoluble phase diagram, i. e., the phase diagram with a eutectic point. the infinite liquid insoluble phase diagram, i. e., the phase diagram with a shared boiling point. all the phase diagrams we obtained are quite analogous to the behavior of the three - dimensional substances

    這些典型的相圖主要包括:無限相互溶解的「雪茄型」相圖和具有一個極值等濃度點相圖;完全不相互溶解的固液低共晶點的相圖和完全不相互溶解的低共沸點相圖等等。
  4. Using the thermodynamic conditions describing the coexistence of two phases and the stability conditions of equilibrium state, we have calculated the normalized temperature and the normalized pressure of the triple point ( t1, p1 ), the melting curve, vapouring curve and the sublimation curve. the whole phase diagram of the 2d monatomic l - j system is obtained

    和杜宜瑾等人的方法類似,我們先給出了系統在相變點時的一些參數的數值,在此基礎上,考慮占據率q的因素,利用相平衡的熱力學條件及平衡態的穩定性條件,得到了二維單元l - j系統的熔化曲線、汽化曲線、升華曲線以及三相點的位置,從而給出了該系統的完整的三相圖。
  5. Optical power meter real - time monitor optical power of each optical cable, and control computer gather the value of optical power attenuation circularly, if some values excess the limit, the computer control optical switch to connect another spare optical fiber with otdr card, control the otdr card to test the optical fiber, and then find the malfunction point accurately. the system require software system to run with hardware devices tother. this paper analyze requirement and technical feasibility in software system, ooa and uml are used to analyze software and abstract the class diagram

    通過光功率計對每條光纜中的備用光纖進行實時的監控,測試光功率的衰減值,主控計算機不斷循環的對每個光功率模塊進行數據採集,並記錄每路光信號的光功率衰減值,然後進行分析處理,如發現達到設定的光功率衰減門限值就報警,並控制光開關的切換,將故障光纜中的另一備用光纖與otdr卡連接,通過otdr卡對該光纖進行測試,從而確定故障點。
  6. This thesis primarily makes below the work of a few aspects : ( 1 ) the method that measuring and solution of the control point ' s coordinate, calculation of the point, solution of intersection with polygons, and calculation the quantity of ore reserves in a drawing file by computer technology ; ( 2 ) the theory and the method to draw the diagram of the equivalent line by establishing the abnormal triangle net, and ore blending with the diagram of the equivalent degree ' s line ; ( 3 ) the principle and method to automatically divide the ore, and the method to adjust to the quantity of ore and search the ore ' s information ; ( 4 ) adoption the line program to beg to solve the problem to ore blending, and establish the linear programming model and the simplification model with ore blending. ( 5 ) establish the control model with ore degree based on modem control theories

    本論文主要完成了以下幾方面的工作: ( 1 )利用計算機技術直接在一張現狀圖中,實現了控制點的測量與求解、坐標展點計算、多邊形求交以及爆堆礦巖量的計算; ( 2 )提出了通過建立非規則三角網的方法來繪制等值線圖的理論和實現方法,通過等品位線圖指導配礦工作; ( 3 )提出了配礦塊段自動劃分的原理和方法,並在此基礎上實現礦塊礦量調整和礦塊信息查詢; ( 4 )採用線性規劃的方法求解配礦問題,建立了配礦問題的線性規劃模型和簡化模型; ( 5 )建立了基於現代控制理論的品位控制模型。
  7. Before the interstellar cloud contracts, it was very cold and dim. thus, the cloud is represented by a point at the right in the h - r diagram

    在星際雲收縮之前,它非常冰冷,所以在這個階段,星際雲會位於赫羅圖上一個極右的位置。
  8. The research uses phase diagram to disclose the whole picture of transitional behavior and saddle point path

    相位圖技術揭示了轉移行為和鞍點路徑的完整形態。
  9. This paper studied a forecasting method of geological disaster in coal mine starting from the applied point of view, presented the principle diagram and relative software flowchart of data collection equipment

    摘要從實用角度出發,研究了煤礦地質災害的預測方法,給出了數據採集裝置的原理框圖和相應的軟體流程圖。
  10. Schematic diagram showing the relationship between the zero - point energy and molecular mass for hydrogen, deuterium and hd. ( image courtesy of mit ocw

    示意圖說明氫分子、氘分子、氫氘分子的零點能與分子量之關系(本圖由麻省理工學院開放式課程網頁提供) 。
  11. Melting point diagram

    熔點線圖
  12. Colorful maze diagram result : magician s pawn in will aly white hands over to audience, and tell there are two point of departures on the audience maze diagram, inviting audience to allow to select by examinations a point of departure to place. the game starts inviting audience to turns over to open a small card to use the ambulation direction that the numeral and the color of the card decides pawn and treads a number at will again now. if is red 2 is general such as the mark of the maze diagram diagram, the arrowhead of the red is upward, so the pawn headings up to move two step, with this kind until all of seven small cards use up. the position that the result pawn stops over finally, choose with audience in advance of the small card color, numeral is completely same

    :魔術師在將一個白色的棋子交給觀眾,並告訴觀眾迷宮圖上有兩個起點,請觀眾任選取一個起點來放置。現在游戲開始了請觀眾再隨意翻開一張小卡片用卡片上的數字和顏色來決定棋子的移動方向和步數。如果是紅色的2就如迷宮圖上的標示圖一般,紅色的箭頭是向上的,所以棋子就向上移動兩步,以此類直到七張小卡片全部用完為止。
  13. As to the polyreference implemention of the least - squares complex frequency - domain estimator in mathematical separation technique of modes, this thesis builds a right matrix - fraction description model to estimate the system poles. then frequency point stabilization diagram is set up and analyzed to automatically determine natural frequencies, modal damping ratios and modal participation factors. finally mode shapes are identified based on the least squares theory

    對于模態數學分離技術的多參考點最小二乘復頻域識別技術,先建立右矩陣分式頻響模型,識別出系統極點,再通過建立和分析頻率點穩態圖,能自動的確定出結構的固有頻率、模態阻尼比和模態參與因子,最後根據最小二乘原理識別出模態振型向量。
  14. And in the ( t, h ) phase diagram there is a tricritical point, at which the two boundary lines of the paramagnetic and ferromagnetic regions merge

    )不為零。 ( t , h )相圖存在一個動力學三相點,順磁區和鐵磁區的邊界線在這點開始匯合。
  15. Having considered the initial checklist questions, and asking how, what and why at each point of the flow diagram, an intermediate flow diagram can be developed

    類別問題清單?案且考量后,在流程圖flow diagram的每個點都自問如何什麼為何,繪制進一步詳細的流程圖intermediate flow diagram 。
  16. The author put forward that the method that simplifies the voronoi diagram dynamically could be used to the point and area elements multi - scale representation. take habitation and relief as instances, this paper presents the general model and basic algorithm of elements with different dimensions

    在點狀要素和面狀要素多尺度表達方面提出用動態化簡voronoi圖的方法實現點狀和面狀要素的多尺度設置;在線狀要素的多尺度表達方面提出實現模型並給出實踐經驗值。
  17. With the current condition, the paper raises the point of synchronization in the qe1 ' s development, including the synchronization of bit, frame, multiframe and network and analyses the performance frame synchronization system based on the theory of probability and finally explains the realization of the technology of synchronization. the hardware circuit diagram of qe1 and some software flow chart have been offered in the paper

    在針對qe1中繼板卡系統實際的開發情況后,本文分析了該系統所涉及的同步問題(包括位同步、幀同步、復幀同步和網同步) ,在概率論的基礎上分析了qe1系統的幀同步系統的性能,並研究了各種同步技術在qe1中的實現。
  18. With the pressure measurement system for the swirl chamber diesel engine, by using the methods of equivalent power and the seven point three degree average for the indicator diagram, we can correct the tdc, smooth the pressure curve and make more accurate pressure data that is a well basis for the calculation of combustion heat release rate

    摘要本文在自行開發的渦流室柴油機壓力數據測錄系統的基礎上,利用等效功法和七點三次加權移動平均法,分別對示功圖進行了上止點校正和壓力曲線光順,使壓力數據更精確,為燃燒放熱率的計算打下了良好的基礎。
  19. This article takes the chemical physics experiments " binary liquid - vapor equilibrium phase diagram " for the study, using the computer program to draw the liquid - vapor equilibrium phase diagram conveniently, and can extract composes is 0. 75 time gas phase composition and the boiling point respectively is 0. 5772, 64. 9737

    文章採用計算機程序方便地繪出氣液平衡相圖,並求出了溶液組成為任意值時(以摩爾分數為0 . 75為例)的氣相組成和沸點分別為0 . 5772 , 64 . 9737 。
  20. For example, if one - half of the order items that are specified in a case diagram have a cost value of zero, one - half the data will occur under a single point in the curve

    例如,如果事例關系圖中指定的定單項有一半的cost值為零,那麼這一半數據將位於曲線上某點以下。
分享友人