port mark 中文意思是什麼

port mark 解釋
到達港標志
  • port : n 1 港;港口;〈比喻〉避難港;避難所,休息處。2 (特指有海關的)港市;輸入港;通商口岸。3 機場,...
  • mark : n 馬克〈男子名,Marcus 的異體〉。n 【宗教】(基督教《聖經》中的篇名)《馬可福音》;《馬可福音》的...
  1. During construction of donghai bridge of yangshan deep - water port, bedrock bench mark, which is an important surveying datum mark, played an important part in control survey and elevation transmission

    摘要基巖標是重要的測量基準設施,在洋山深水港東海大橋的工程建設中發揮了控制測量與高程傳遞的重要作用。
  2. Shipping marks : the seller shall be obliged to have the shipping mark shown as below in addition to the port of destination, package number, gross and net weights, measurements and other marks as the buyer may require stencilled or marked conspicuously with fast and unfading pigments on each package

    裝運嘜頭賣方負責在每件貨物上用牢固的不褪色的顏料明顯地刷印或標明下述嘜頭,以及目的口岸、件號、毛重和凈重、尺碼和其它買方要求的標記。
  3. In the next, the paper focuses on explaining the recognition of waterway fixed assets, and puts forward if the potential service from port facility such as bulwark, navigation mark, beacon and so on, which bear the property of public goods can not be dominated or possessed by the corporation which constructed them, the expenditure of construction and repairs should be treated as the expense of the year ; if the potential service can be dominated by the corporation or other port corporations pay for the use of above - mentioned port facilities, then the expenditure of construction should be regarded as the cost of fixed assets

    由於水運固定資產具有其本身的特性,它的確認一直是水運會計理論界的一個難題。本文提出:如果防波堤、航標、燈塔等具有公共產品性質的港務設施的服務潛能不能為企業所擁有、控制,那麼就應將建造、修理支出作為本期費用;如果它們的服務潛能為企業所擁有或者因其它港口企業使用它們而使本企業受惠,那麼就應將有關上述設施的成本支出計入固定資產進行確認及核算。
  4. This digital pattern generator composes of eight parts : interface circuit unit, dual - port sram unit, dsp unit, dac unit, expose / mark signal detection control unit, mark signal diction unit and final expose shape registers unit

    本論文中的新型圖形發生器由介面電路、雙埠存儲電路、數字信號處理電路、數模轉換電路、曝光標記檢測控制電路、標記檢測電路、最終曝光數據寄存器單元和束閘控制電路構成。
  5. On each package shall be stenciled conspicuously : port of destination, package number, gross and net weights, measurement and the shipping mark

    每件貨物應明顯地標出:到貨口岸、包裝號、毛重、凈重、尺碼及裝運標記。
  6. The project content : the project will mark out 1200 mu for the entertainment place as the combination of the aquatic pleasure, sports leisure, traveling port and base for the movies at the collection of the three rivers

    項目內容:在市中區三江交匯處,規劃佔地1200畝的集水上游樂、體育休閑、旅遊碼頭和影視基地為一體的娛樂場所。
  7. 11 mark shown as below in addition to the port of destination, packagenumber, gross and net weights, measurements and other marks as the buyer may require stencilled or marked conspicuously with fast and unfailing pigments on each package

    裝運嘜頭,賣方負責在每件貨物上用牢固的不褪色的顏料明顯地刷印或標明下述嘜頭,以及目的口岸、件號、毛重和凈重、尺碼和其它買方要求的標記。
  8. Power cable route protection zone : the areas between two parallel lines formed by 0. 75 meters on both sides of the ground mark of underground cable route ; for sea - bottom cables, the zones should be the water surface between the two parallel lines formed by two nautical miles on both sides of the line ( 100 on both sides of the line in port ) and no less than 100 meters on both sides of the line in rivers ( not less than 50 meters for mid - sized and small rivers )

    (二)電力電纜線路保護區:地下電纜為線路兩側各零點七五米所形成的兩平行線內的區域;海底電纜一般為線路兩側各二海里(港內為兩側各一百米) ,江河電纜一般不小干線路兩側各一百米(中、小河流一般不小於各五十米)所形成的兩平行線內的水域。
  9. Mark shown as below in addition to the port of destination, package number, gross and net weights, measurements and other marks as the buyer may require stenciled or marked conspicuously with fast and unfailing pigments on each package

    賣方負責在每件貨物上用牢固的不褪色的顏料明顯地刷印或標明下述嘜頭,以及目的口岸、件號、毛重和凈重、尺碼和其他買方要求的標記。
分享友人