port project 中文意思是什麼

port project 解釋
港灣工程海港工程
  • port : n 1 港;港口;〈比喻〉避難港;避難所,休息處。2 (特指有海關的)港市;輸入港;通商口岸。3 機場,...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Settlement observation and back analysis for the second stage polder dike project of zhapu port

    乍浦港二期圍堤工程沉降觀測與反分析
  2. Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients

    本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護坡、橋梁、防浪堤、水庫堤壩、隧道、機場跑道、市政工程井蓋(防盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。
  3. The program is applied to 1st phase project of dayao bay bulk terminals, dalian port and the result is satis factory. finally, the article discusses the problem in research and brings some advices in further research. based on systems analysis, modem computer simulation technology and technological analysis of large. sized bulk terminals, the article proposes the appliance of ooa to the research of bulk handling system and raises a concept of simulation system

    本論文針對散糧碼頭系統設計與運營中出現的問題,根據系統分析的方法,結合現代計算機模擬技術,在對大型散糧裝卸碼頭工藝系統分析的基礎上,提出了應用面向對象的系統分析方法開展對散糧碼頭裝卸工藝系統進行分析研究,並建立模擬系統的概念。
  4. Application of aluminithermic welding technology for steel rail in yantian port area phase project

    鋼軌鋁熱焊接技術在鹽田三期工程中的應用
  5. This paper explores the internal laws between such port production elements as the harbor tugs " disposition, the port " s production throughput and the number and time of the arrived ships ; under the framework of " the development project of qingdao harbor in five years " by qingdao government ; through collecting large amounts of statistic data ; under the premise of scientific induction, arrangement and calculation to all of the port " s production elements which affect the regular harbor tugs " disposition, especially under the premise of much statistic analysis to the arrived ships ; on the basis of the overall analysis to the qingdao harbor " s production from 1999 to 2000 ; through the analysis to the present disposition scale of the harbor tugs and the port " s production and management. additionally it predicts the change of the port " s production elements according to the total object of the port " s development in order to work out a relatively scientific calculation method for disposing the harbor tugs scientifically as well as decreasing blindness in disposing the harbor tugs, and also make the disposition scale of the harbor tugs scientific and reasonable with each passing day so as to answer the demands of the port " s production and management along with it " s development

    本文是在青島市政府關于《青島港未來五年發展規劃》的框架下,通過搜集大量的統計資料,在對青島港1999年至2000年生產全面分析的基礎上,對影響港作拖輪規模配置的港口生產各要素進行科學的歸納、整理、計算,特別是在對到港船舶的大量統計分析的前提下,通過對目前港作拖輪的配置規模與港口生產經營情況的分析,探索港作拖輪的配置與港口生產的吞吐量、到港船舶艘次數等港口生產要素間內在的規律,並根據港口發展規劃的總體目標預測未來港口生產各要素的變化情況,以期能為各港口科學合理地配置港作拖輪、減少配置港作拖輪中的盲目性提出較為科學的計算方法,使港作拖輪的配置規模日趨科學、合理,滿足港口生產經營及未來發展的需要。
  6. The government has begun a project at the port to increase the size of the harbour

    政府已開始在該港口進行擴大港灣的工程。
  7. The city government has begun a project at the port to increase the size of the harbour

    市政府已經開始在港口實施一項工程計劃,以便擴大該港的規模。
  8. Taken together, by the end of 2005, with the completion of the first phase of the shanghai deepwater port, the donghai cross sea bridge and the luchao new harbor city projects, as well as the opening of the first phase of the nanhui equipment manufacture development zone and the huinan new city development project, it is expected that nanhui s official population will increase by more than 300, 000 people and will easily surpass one million

    金山奉賢原供銷社開辦的百貨大樓,這幾年的營業額都穩定在3 4億元。 「精品商廈」是南匯的商業中心,如果正常經營,其年營業額也應該在3 - 4億元之間,加上洋山深水港和海港新城的建設,將來更有超過金山奉賢的可能。
  9. Abstract : according to the safety evaluation of qiongzhou strait rail - ferry engineering , the construction protocol feasible to the rail - ferry engineering in straits and rivers in china is demonstrated. the relevant safety issues in the design and operation of the rail - ferry port are discussed. the priority issues need to considered and their safety countermeasures should be taken in the design of the project are proposed

    文摘:通過對粵海鐵路通道瓊州海峽鐵路輪渡工程的安全評價,闡述了適合於我國海峽及內河鐵路輪渡碼頭工程的建設方案,對鐵路輪渡碼頭工程設計中及運營中可能出現的危險進行了探討和分析,提出了鐵路輪渡工程安全設計中應重點加以考慮的問題和相應的安全措施。
  10. On the basis of familiar with can bus and gsm communication, considering hev ( hybrid electric vehicle ) battery administrative system ' s demand for the host pc monitoring system, i have designed can - rs232 converter gateway to realize transmission the real - time data from can node to rs232 serial port, which is carried out by the project of at89c52 mcu + sja1000 can controller + 82c250 can controller interface. host monitoring software has accomplished real - time datas display, storage, historical datas graph analysis and storage fashion change from access to excel, at the same time, realized important datas transmission remotely with tc35 short message module. system software programs in assembly and vb

    Can - rs232轉換網關採用at89c52微處理器+ sja1000can控制器+ pca82c250can控制器介面實現對can總線節點通訊的監聽,並將其轉換成rs232串口電平發送到pc機串口,同時用siemens公司的tc35模塊和at指令實現現場採集系統重要數據和錯誤信息的短消息通訊。在上位pc機監控系統中,主要完成的是對串口設置的選擇控制、現場採集數據的實時刷新顯示、歷史數據的圖表分析及數據的access數據庫存儲和excel電子表格的轉換。系統軟體採用匯編語言和vb實現。
  11. Xianing port water conservancy project structure first expansion method pretressing force board construction technology

    霞凝港水工結構先張法預應力空心板施工技術
  12. On the base of the ever - existed wharfs of the lanshan port, this project aims to build a large - scale oil wharf, and also large - scale crude oil and product oil storage depot

    本項目利用現有的嵐山港碼頭改擴建建設大型油碼頭,同時建設大型原油或成品油庫。
  13. The first part. task analyse of handling technology design. is explain the place, basic establishments entironment of yangshan port and the conditions basic tenet and technical parameter of design. the second part, project study out. is discuss the design contents the choice of the leading and the assistant engine, the form of the handling mechanisation system, project study out. the third part, size design, is count the berth pass capacity, the amount of handling engine, the area and capacity of yard, road and gate, the worker amount. the fourth part. technology and economy argumentation, commendable project confirm, is confirm the commendable project by technology and economy argumentation. in the end, considering the technology, economy and use. discourse commend the project of rubber - tyred gantry crane. at present. centre government is studying yangshan project, but in handling technology part of container terminal, the design is simply. so this discourse has important consult value. and has important value of economy and community too

    第一部分的裝卸工藝設計任務分析主要就洋山港區的地理位置、基礎設施、自然環境,設計前提條件,設計原則以及設計主要技術參數進行說明;第二部分的裝卸工藝方案擬定主要就工藝設計的主要內容,主要機械及輔助機械選擇,裝卸機械化系統組成以及工藝設計方案擬定進行論述;第三部分的裝卸工藝方案規模設計主要就泊位通過能力,裝卸機械臺數,堆場面積及堆存能力,道路及大門,司機及工人人數,工藝流程進行計算分析;第四部分的技術經濟論證及推薦方案確定主要就技術、經濟指標進行對比論證,並在此基礎上確定推薦方案。
  14. With the introduction of the liquid chemical loading and discharging system and how operating in zhenhai district, combining the recent statistics date of the port, the chapter analyzes the berth throughout, use - rate of berth, need of the storage area and point out the main problem now existing. chapter three combining the new project of the district analyzes the handling system layout entirely, meanwhile it builds four series of liquid chemical transfer - lines projects which fit the need of the future

    第二章主要對化工區的發展現狀進行了分析,在簡單的介紹了散裝液體化工品的裝卸工藝和化工區液化裝卸工藝的布局形式和運作方式的基礎上,結合港區現有的各類統計資料,通過對泊位通過能力,泊位利用率和區域貨運量等資料的分析研究,指出了目前化工區液化工藝布局中存在的主要問題,並提出了解決目前存在問題的基本思路。
  15. Project of shanghai international shipping center ' s yangshan deep - water port and its significance of construction

    上海國際航運中心洋山深水港區工程及其建設意義
  16. Qaulity control for phase project of yantian port area

    鹽田港區三期工程的質量控制
  17. The environmental impact assessment specifications for port construction project

    港口建設項目環境影響評價規范
  18. For avoiding harmful cracks in concrete structures during construction, this paper analyzes the possible causes of concrete cracks in yangshan port project, proposes control measures for concrete cracks, and describes the inspection and repairing of concrete cracks, so as to ensure the concrete construction quality of yangshan deepwater port engineering, serving as a reference for field concrete construction

    摘要為盡可能避免混凝土構造物在施工階段發生有害裂縫,對洋山港區工程混凝土裂縫的可能成因進行分析,提出控制混凝土裂縫的措施,並介紹混凝土裂縫的檢測和修補工作,以確保洋山港區建設工程的混凝土質量,可供現場施工參考。
  19. The two companies, which will each take a 32 per cent stake in the project, are also the first overseas groups to invest directly in shanghai ' s yangshan port project, the city government announced yesterday

    上海市政府昨日宣布,這兩家公司也是直接投資于上海洋山港項目的首批海外集團,將各自持有該項目32 %的股權。
  20. This paper describes the research results of the durability of the high performance concrete and the application of the hpc in lianyun sea port project

    本文介紹高性能混凝土的耐久性研究結果及其在連雲港碼頭工程中的應用情況。
分享友人