post dam 中文意思是什麼

post dam 解釋
后堤
  • post : n 1 (被指定的)地位,崗位;職位,職守。2 【軍事】哨所,站;哨兵警戒區;〈轉義〉哨兵,衛兵。3 基...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為施工決策提供理論依據。
  2. The parameters of the creep constitutive model can be obtained from the back analysis according to the observed deformations of concrete face rockfill dam ( cfrd ) in prototype and then applied to predict the post deformation of the dam with the effect of creep taken into account

    採用該方法對某堆石壩9參數流變模型參數進行反演分析,計算結果表明,利用反演的模型流變參數所計算的壩體流變變形與實測資料在發展規律及數值上均比較吻合。
  3. Research on new - old concrete combination for danjiangkou gravity dam heightened during post - period

    對丹江口大壩加高工程施工與樞紐運行管理關系的探討
  4. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、混凝土出機口溫度控制、運輸過程溫度控制、澆築過程的溫度控制以及混凝土澆筑後的養護和冷卻通水等一系列研究,提出景洪電站高氣溫條件下大壩碾壓混凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方法。
  5. Recurring to pre - process program of ansys and drawing functions of winsurf, pre - process program serving to finite elements auto - division of dam bodies and basements models and post - process program capable of plotting various isolines of stress and dams " distortion are worked out. collecting program of data files necessary for dams " dynamic stability analysis is also finished

    藉助于ansys前處理程序和winsurf繪圖功能,用vb6 . 0語言編制了用於進行壩體?壩基模型有限元網格自動劃分的前處理程序和能夠繪制各種應力等值線或壩體變形圖的后處理程序;編制了進行土石壩地震穩定性分析所需要的數據文件集成程序。
分享友人