post project 中文意思是什麼

post project 解釋
工程建成以後的
  • post : n 1 (被指定的)地位,崗位;職位,職守。2 【軍事】哨所,站;哨兵警戒區;〈轉義〉哨兵,衛兵。3 基...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. The times, standard, morning post, and daily new, and twenty other highly respectable newspapers scouted mr fogg s project as madness ; the daily telegraph alone hesitatingly supported him

    泰晤士報標準報晚星報每日晨報和其他二十種有聲望的報紙全都反對斐利亞福克。
  2. Lopez was named one of people magazine ' s fifty most beautiful people for 1997, and her first post selena project, anaconda, was the film that finally knocked jim carrey ' s liar liar out of its holding pattern at the top spot in the spring box office rankings

    洛佩茲被《人物》雜志命名為1997年最有魅力的50人之一;她繼《塞萊娜》后的新作《阿納康達》 ,最終將吉姆?凱瑞的《說謊者》擠出其霸佔已久的春季票房排行榜首位。
  3. If we intend to project combat power into the complex battlespace of the future, we must shift our focus from the relative simplicity of mass, armored warfare into the challenge of post - jominian, formationless, distributed operations

    如果我們想要在未來的復雜作戰空間投放我們的作戰力量,我們必須把我們相對簡單的集群、裝甲作戰轉變到應對后約米尼時代不講陣形、分散式作戰的挑戰上來。
  4. Being a widely utilized public ip platform, it is susceptible to security attacks of all nature, as outlined in the following areas : the open nature of the ip internet systems - increase of foreign attacks, for example dos / ddos attacks ; the current weakness of the existing operating system ' s internet protocol ; mainframe, and lack of an evaluation standard for back office systems, the inevitable problem of illegal internal access, the lack of guidelines for record keeping and post attack documentation processes, hi addition, still in existence, are managerial problems including the lack of securit y knowledge amongst the workforce and the inexistence of a complete set of security guidelines. to guarantee china telecom ' s 163 / 169 system ' s reliable functions, to protect the user ' s interests, at the same time, insuring quality service, it is necessary to adapt p2dr model as a solution to the current security issues. supported by the modern secure theory and made the secure implementation abundant project practices, this paper gives the general secure design for the chongqing public ip network using p2dr secure model

    中國電信建設的公眾ip網對我國internet的發展起著決定性作用,重慶電信163 / 169網際網路是國家骨幹網在本地的延伸,擁有7個核心節點(採用cisco12012 、 2 * 2 . 5gdpt環) ,三十八個匯接節點,能提供寬帶,窄帶多種接入方式的公眾ip網,現擁有近20萬用戶,佔全市網際網路用戶四分之三以上,作為這樣一個擁有眾多用戶,開放的ip平臺,會受到各種各樣的安全威脅,主要表現在ip網路的開放性,來自外部的攻擊增多,如dos / ddos攻擊;所使用的操作系統運行的網路協議自身的脆弱性;主機、網路設備的配置是否缺乏評估手段;不可避免的內部非法訪問;缺乏必要的攻擊審計作為犯罪取證,出此之外,還有管理上的一些問題,如人員安全意識不強,安全制度不夠健全等多方面原因。
  5. Inorganically post - installed bars although have the ideal durability and heat - resistance, its bonding strength is low. it is unable effectively to transmit the load, the anchor depth is too big. these restricted application of the inorganic anchoring material in the post - installed fastening project

    無機植筋雖有較理想的耐久性能和耐高溫性,但其粘結強度較低,無法有效傳遞荷載應力,錨固深度太大,這制約了無機粘結材料在植筋工程中的應用。
  6. This is my chief task. it is effective approach for these problems to quicken the step of reforming investment system and bring post evaluation into project procedure so as to establish its legitimacy status

    解決這些問題的有效措施是加快我國投資體制改革的步伐,認真總結我國經濟建設中的經驗教訓,逐步將項目后評價納入建設項目管理的程序,從法律上確立項目后評價在項目管理中的合法地位。
  7. These documents include : ( i ) chinese - english translation : project proposals, project feasibility study reports, environment assessment reports, resettlement action plans, bidding / bid documents, bid evaluation reports, etc. ( i ) english - chinese translation : project appraisal document, project post - evaluation report, loan agreement, project agreement, aide - memoirs of project supervision missions, consultation proposal for technical assistance, consultation reports, etc

    這些項目文件包括:漢譯英:項目建議書、工程可行性研究報告、環境影響評價報告、移民行動計劃、招標投標文件、評標報告等;英譯漢:項目評估文件、項目后評估文件、貸款協定、項目協定、項目檢查團備忘錄、技援咨詢建議書、咨詢報告等。
  8. Abstract : this paper suggests a general model for hazard analysis of urban post - earthquake fire. based on the statistic study of urban fire, a modified calculating formula for occurrence of urban post - earthquake fire is established. according to poisson process model, a general analysis method is suggested. the analysis result is depicted by exceedance probability curves. the example analysis for a practical project is given in the paper

    文摘:建議了一個城市地震次生火災危險性分析的一般模型.利用民事火災的統計分析結果,給出了城市地震次生火災發生率的修正公式.在此基礎上建議了地震次生火災危險性分析方法,並以超越概率曲線的方法表達次生火災危險性分析的結果.結合實際工程,給出了分析實例
  9. Hydrology regime and river channel evolution become complex because of double influences of river flow and tide. there is little appropriate method so far. therefore, when the impact us assessed of water project on flood control, the following aspects should be focused on, river evolution and stability of project - sections, design tidal level, flood - tide combination scheme, pre - project and post - project impacts on river channel, water level and flow condition

    長江河口段為潮流河段,徑流潮流的雙重作用使得區域水文情勢、河道演變規律錯綜復雜,開展防洪影響評價研究時,河道演變及工程段穩定性分析,設計潮位的分析計算,洪潮組合方案擬定,工程前後對河道及水位流態影響的模擬等均是目前尚無十分成熟的方法,需要進一步研究的課題。
  10. Post project handover to work within the secco management of change process and continue to develop the advanced control and optimization schemes

    在賽科變化管理流程范疇內實施項目移交,繼續開發高級控制和優化方案。
  11. Evaluating post - project of ship engineering by ahp

    基於層次分析法的船舶工程項目事後評價研究
  12. Post project evaluation and followup

    項目后評價和后繼行動
  13. Post project evaluation is one of the most import aspects of project management

    項目后評價是投資項目管理的重要內容之一。
  14. Post project evaluation

    項目后評價
  15. Ensure that secco post project have the relevant documentation available, and the necessary maintenance contracts are in place

    確保賽科項目具備相關文檔和必需的維護合同。
  16. Ensure post project handover that all documentation such as control schematics and system, databases are maintained

    確保項目移交,維護所有文檔,如控制方案、控制系統和數據庫。
  17. Finally, to make sure post project evaluation could be operated in real situation of sichuan telecom, several analysis methods are applied and improving measures are proposed

    同時,為確保項目后評價實施運作,結合四川電信的實際情況,運用幾種分析方法進行了實證分析,並且提出改進后評價的對策措施。
  18. Post project evaluation has been non - standard without systematic evaluation programme in sichuan telecom corp for a long term. project audit taking over all evaluation is overwhelming which leads to difficult lessons learning, analyzing and costs reduction

    長期以來,四川電信公司項目后評價管理工作很不規范,缺乏系統性的后評價程序, 「以審計代替后評價」問題十分突出,不利於總結經驗,分析原因,提高投資效益。
  19. Through post project evaluation, lessons could be learned as well as problems and reasons could be found. moreover, immediate and effective feedback could lead to adjust measures that help to achieve project goal. therefore, post project evaluation is very important especially for improving decision - making

    通過后評價,全面總結項目實施后的經驗教訓,找出存在的問題和原因,並通過及時有效的信息反饋,採取糾偏矯正措施,對于實現項目目標,提高項目決策水平,具有十分重要的現實意義。
  20. Consulting on investment and financing : we assist our customers to get access to china and foreign finance market, including pre - project negotiation, project execution and post - project review

    利用國內外的投融資渠道為客戶對接國際金融市場提供全方位服務。包括前期的項目談判、計劃的中期執行和事後的監控。
分享友人