post tensioned concrete 中文意思是什麼

post tensioned concrete 解釋
后張法混凝土
  • post : n 1 (被指定的)地位,崗位;職位,職守。2 【軍事】哨所,站;哨兵警戒區;〈轉義〉哨兵,衛兵。3 基...
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  1. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型梁具有結構新、工藝復雜、體積大、運輸困難,將常規鐵路的橋梁廠製造橋梁、經過鐵路運梁到工地、邊鋪邊架進行橋梁製造與架設的傳統施工模式應用到該線是行不通的,必須在現場預制橋梁、並採用專門的運架梁設備進行橋梁架設,因此箱梁的製造、架設施工成為該線施工技術攻關的重點和難點。
  2. Based on the experimental results, in concrete limitation stress sandwich first stage ' s ability and one - way and two - way precast slabs sandwich, results content code require - second class crack control. resistant crack calculation is appropriate. because post - tensioned prestressed advances plane ' s resistant crack. deformation and section strain measure accord with calculation results, this indicates 3d - gridding beams modulus is reasonable to precast slabs sandwich

    本文通過對試驗數據的分析總結,認為:單塊夾層板第一受力階段的性能試驗及單向和雙向裝配整體式夾層板的性能試驗,滿足《混凝土結構規范》 ( gb50010 - 2002 )中關于預應力樓板的二級裂縫控制等級的要求,抗裂設計得當;由於板縫無粘結預應力筋的存在提高了板的抗裂性。
  3. Based on rizhao port bulk grain wharf construction, this paper presents a simple, practical and efficient construction technique of post - tensioned pre - stressing concrete beam and beam - slab

    摘要以日照港散糧碼頭施工為例,介紹一項簡單、實用、高效的后張預應力梁及梁板的施工工藝。
  4. Prestressing of post - tensioned prestressed concrete box girder

    后張法預應力砼箱梁的預制施工
  5. Engineering of prestressed concrete water tanks, and post - tensioned concrete water tanks. includes a virtual tank tour

    -生產水處理反滲透海水淡化脫鹽除菌超濾等設備。
  6. Post - tensioned pre - cast concrete simple - supported girder for railway bridge pro - stress

    預應力混凝土鐵路橋簡支梁靜載彎曲試驗方法及評定標準
  7. Post - tensioned prestressing concrete beam

    后張法預應力混凝土梁
  8. Especially the bridge engineering has to be concerned with high, new and difficult technologies. new technologies firstly adopted are post - tensioned prestressed concrete simply - supported box girder, assembly two - way prestressed concrete simply - supported t - girder, reinforced concrete continuous rigid frame, and steel - concrete composite continuous girder. all these have formed a series of new bridge structures taking prestressed concrete simply - supported box girder as main feature

    由於秦沈客運專線的特殊技術要求,在鐵路建設史上首次採用了后張法預應力混凝土箱形簡支梁、裝配式雙向預應力混凝土t形簡支梁、鋼筋混凝土剛構連續梁、鋼與混凝土結合連續梁等橋跨結構,形成了以預應力簡支箱梁橋跨結構為主要特徵的一系列橋梁新結構。
  9. In the last part, we researched the bending strength of post - tensioned and cohesionless cfrp tendon concrete beams. in this part we summarized the performance of bearing, deflection and crack of the beams. at the same time, we introduced the research about the anchorage device and the prestressing loss

    另外,在試驗分析的基礎上,我們運用有限元分析軟體ansys對碳纖維塑料筋普通混凝土梁在三分點豎向荷載作用下的受力狀況進行了模擬,得出了詳細的計算結果。
  10. A historical analysis in theory is carried on studying redistribution of internal force in the bonded post - tensioned partially prestressed concrete framesin this paper

    本文編制了變剛度分析程序,重點研究了后張有粘結部分預應力混凝土框架的塑性內力重分佈的規律。
  11. At first, this thesis analyzes the main causes in theory, which have effects on the redistribution of internal force and modulation of moment for the bonded post - tensioned partially prestressed concrete frame ( for short prestressed frame ), including the relative height of compressive zone of section ( ), secondary moment and types of load applying. then, this thesis analyzes the test of prestressed frame. then, a method, called curvature - force method, for nonlinear analysis of prestressed frame is put forward

    本文首先從理論上分析了影響后張有粘結部分預應力混凝土框架(簡稱為預應力框架)內力重分佈和彎矩調幅的主要因素,即相對受壓區高度、次彎矩和加載方式等,並初步分析了兩榀只加豎向荷載和兩榀既加豎向荷載又加水平荷載的單層單跨預應力框架靜力加載的試驗。
  12. The current approaches including code methods to calculate stress losses due to anchorage set exist several shortcoming, such as unsuitable to different profiles of tendons or very complicated to compute due to sectional analysis. based on classical theory of friction when tendons are stretched in post - tensioned concrete members, the unified method to calculate the stress losses in tendons due to anchorage set while considering the affection of reverse friction has been established, these formulae are suitable to be used in computer ; also approximate formulae are produced which are suitable to manual computation, they are easy to be applied in research or design

    針對目前預應力鋼筋錨固時鋼筋回縮引起的預應力損失計算方法中存在的問題,建立了考慮反摩阻影響的后張法預應力混凝土橋梁錨固損失的統一計算式,適用於任意形狀的預應力鋼筋和單、雙端張拉的情形;給出了適于機算的理論公式和適于手算的近似計算式,可方便地應用於研究和工程實踐。
  13. The prestressed concrete with unbonded tendons has developed in china for recent ten years. this improves normal post - tensioned prestressed concrete construction method and simplifies construction technique

    無粘結預應力混凝土技術在我國是近十年來發展起來的,它改進了通常的后張預應力施工方法,簡化了后張預應力施工工藝。
  14. Port engineening technical code of design and constraction for large diameter post tensioned prestress concrete cylinder pile

    港口工程預應力混凝土大直徑管樁設計與施工規程
  15. According to the loading characteristics of bonded post - tensioned prestressed concrete frames, a program is worked out to perform a nonlinear finite element analysis for the static staff in both the stretching wire stage and the loading stage

    摘要根據后張有粘結預應力混凝土框架結構的受力特點,編制了適用於預應力建立和施加外荷載兩個階段的靜力桿件非線性有限元分析程序。
  16. Post tensioned prestressed concrete structure

    后張法預應力混凝土結構24
  17. Theory of post - tensioned prestressed concrete beams with bond

    后張有粘結預應力連續梁的分析原理
  18. Post - tensioned concrete beam

    后張混凝土梁
  19. Post - tensioned concrete

    后張混凝土
  20. Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load, temperature changes, shrinkage and creep of concrete and live loads, and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and live loads

    其次重點對跨徑為40m標準設計的裝配式后張預應力混凝土斜梁橋在恆載、溫度變化、混凝土收縮和徐變、活載作用下主梁的正應力、豎向變形和恆載、活載作用下主梁的剪應力進行計算分析。計算分析橫隔板在二期恆載、溫度變化、混凝土收縮、活載作用下的正應力、剪應力。
分享友人