power engineering 中文意思是什麼

power engineering 解釋
電力工程
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. The graduates may find employment of technology and management in the fields of the thermal energy & power engineering ( tepe ) and its relevance, such as modern power plant or the refrigeration and cryogenics engineering ( rce ), the graduates may also engaged in the special technique in the fields related to tepe

    學生畢業后能勝任現代火力發電廠,製冷與低溫工程及相關的熱能與動力工程專業的技術與管理工作,並能從事其它能源動力領域的專門技術工作
  2. Code of safety operation in power engineering construction part 1 : steam power plants

    電力建設安全工作規程第1部分:火力發電廠
  3. As a result, it is widely used in many fields such as mining industry, forest industry, dock, ferry, bridgework, water and power engineering

    因而,它被廣泛應用於采礦工業、森林工業、碼頭、渡口以及橋梁、水電建築工程的起重和施工作業中。
  4. Recent years, with the full - blown development of the prestressed concrete technique, the prestressed technique with ring - like strands as the professional technique adapted to the penstock, has been applied to many civil engineering fields such as tunnels and surge shafts in civil engineering hydraulics and power engineering, containment shells of nuclear power station, industrial storage bunkers, digesters and conservation pools in municipal engineering

    近年來,隨著預應力混凝土技術的成熟化發展,環形預應力作為適應壓力管道結構形式的專業技術,廣泛應用於水利水電工程隧洞和調壓井、核電站安全殼、工業儲料倉、市政工程消化池和蓄水池等諸多領域。目前,預應力混凝土壓力管道已得到了越來越多的重視和研究。
  5. Standard for basic terms of electric power engineering

    電力工程基本術語標準
  6. Technical code for geophysical exploration electric power engineering

    電力工程物探技術規程
  7. Standard for electric power engineering drawings

    電力工程制圖標準
  8. Electric power engineering surveying drawings part 1 : surveying

    電力工程勘測制圖第1部分:測量
  9. Electric power engineering surveying drawings part 4 : hydrogeology

    電力工程勘測制圖第4部分:水文地質
  10. Electric power engineering surveying drawings part 3 : hydrometeorology

    電力工程勘測制圖第3部分:水文氣象
  11. Electric power engineering surveying drawings part 5 : geophysical prospecting

    電力工程勘測制圖第5部分:物探
  12. Chaos and its application research progress in electric power engineering

    混沌及其在電力工程中的應用研究進展
  13. Electric power engineering surveying drawings part 2 : geotechnical engineering

    電力工程勘測制圖第2部分:巖土工程
  14. Standard for constructional quality acceptance of railway electric power engineering

    鐵路電力工程施工質量驗收標準
  15. Application of heat pipe technique in power engineering

    熱管技術在動力工程中的應用
  16. The reform scheme of no. 1 boiler in fengtai company is confirmed on the basis of cold / hot tests, theoretical discussions and calculations. in the process of field retrofit, it is indicated in the operation of the improved furnace that without the change of furnace structure, the transform of the burner angle has shrunk the tangential diameter and prevented flames burning on furnace walls, and the burning state of furnace has been bettered, simultaneously, lowering the slagging wi in furnace, thus laying sol id foundation for the safe and economic operation of generating units. wuyanrong ( power plant thermal power engineering ) directed by prof

    本論文通過冷、熱態試驗,經過論證和計算,確定了豐泰公司~ # 1爐燃燒器的改造方案,並進行了現場改造,改造后實際運行狀況表明:在無法改變爐膛結構的情況下,改變燃燒器角度,縮小切圓直徑,使火焰不貼壁,改善了爐內燃燒工況,同時降低了鍋爐結渣的程度,為機組的安全經濟運行奠定了必要的技術基礎。
  17. In domestic project management, the progress management is ineffectively for a long time, especially the information - based system construction aspect in progress management. the ning dian power engineering was put into production on 27th, dec. it was advanced twelve month. the key was using the p3 software to control the engineering ’ process during the construct period

    標志著我國電力裝機容量突破5億千瓦的寧電工程,於2005年12月27日正式投產發電,工期提前了12 . 5個月正式移交試生產,而應用p3有效控制工程進度是該重點工程提前並網投產的關鍵。
  18. Shiuh - huei suen, bin - kwie chen, chih - chien liang, ” derivation of the three phase unbalanced generator model and its verification ”, 1989 proceedings of the 10th symposium on electrical power engineering, dec. 1989, pp. 419 - 434

    陳斌魁,朱文成, 」汽電共生廠電力系統分析」 ,汽電共生研討會,益鼎工程股份有限公司, 1990年5月
  19. Ntu " khpi " is the only higher education institution that trains specialists for such important branches of machine - building as turbine construction for atomic, thermoelectric, hydraulic power engineering, heavy electric machine - building, tractor - building, computer control systems for internal combustion engines, boiler - and reactor manufacturing, fat technologies and fat substitutes technologies, tank - building, electrical insulation, cable and condenser engineering

    哈爾科夫工業大學是唯一一所培養下列重要部門的機器製造業專業人材:原子能、火電和水電渦輪機製造,重型電機製造,拖拉機製造,內燃機、鍋爐和反應堆的計算機控制系統,油技術和油替代技術,坦克製造,電氣絕緣,電纜和電容器製造。
  20. Ground compaction job is a important foundational project of earthwork construction water power engineering civil engineering and city planning engineering etc. good compaction can evidently improve ground ' s carrying capacity and stability and can reduce or remove the subside of the base, so that every project in using have a very steady base

    基礎壓實作業是土工建築、水工建築、道路工程、市政工程等建設中一項非常重要的基礎性工程。基礎經過良好的壓實,能夠顯著改善其承載能力和穩定性,降低甚至消除地基的沉降,從而使各項工程在其使用期間有非常穩固的基礎。
分享友人