  1. Along with the a enhancing proportion of hydroelectricity in the whole electricity system in our country, the increase of the single unit capacity, the faults ratio of the large - scale hydropower units is more and more important to the whole system safe operation, if we do n ' t manage it well, it will cause the collapse of the whole system and bring a great loss of country ' s economy, hi addition, accompany with " to dispart plant and grid, connect to the grid according to the price " put into practice, how to control the production cost of the power plant has to be put into consideration

    隨著我國水電在系統中所佔比重的增加及單機容量的增大,大型水電站和機組的故障率對系統的安全運行也越來越重要,如果處理不好,甚至會引起整個系統的崩潰,給國家帶來巨大的損失。另外,隨著我國「廠網分開,競價上網」的逐步實施,如何控制發電廠的生產成本,也將提上各個電廠的議事日程。
  2. In general speaking, this paper has deeply researched the unit increasing capacity for improving hydraulic power utilization of our country, and this paper is a guide for unit increasing capacity working of gezhouba hydroelectric power plant and other hydroelecrtic plants

    總之,本文立足水電事業的發展,為提高我國水力發電機組水能利用率,對機組增容改造進行了深入的研究,對葛洲壩電站機組增容改造和其它水電站的機組改造工作具有指導作用。
  3. Based on the actual condition of gezhouba hydroeletric power plant, this paper points out the basic way for unit increasing capacity rebuilding of this plant after serious analysis and site review of lots of information of unit increasing capacity of hydroelectric unit at home and abroad. for this rerebuilding plan, we have made a lot of experiment and analyzed the data, the result show that the unit increasing capacity is necessary and feasible in this plant, additional, this paper describes project management, organization struture, management method, and evaluates this project value

    本文對國內外眾多水電機組增容改造資料進行了認真研究和實地考察;通過對水力發電機組增容改造技術的研究,結合葛洲壩電站實際情況提出了葛洲壩電站機組增容改造的基本途徑;針對葛洲壩電站機組改造方案,進行了大量的試驗,認真分析了試驗數據,用試驗結果充分證明了葛洲壩電站機組增容改造的必要性和可行性;本文還就該工程項目管理的必要性、組織結構、管理方法進行了闡述,並對該項目進行了項目評估。
  4. In light of the increment of capacity of hydrogenerating units in shitang hydropower plant, the vibration influence of the power house induced by increment of unit capacity and improvement has been studied, after checking and analying the vibration displacement and frequency of the power house structure

    摘要結合石塘水電站增容改造工程實例,對廠房結構的振動位移和頻率進行了測試與分析,研究了水輪發電機增容改造對電站主廠房的振動影響。
  5. Along with the raising of parameter and the increase of unit capacity, it is more and more complex to start and run, the safety of unit also becomes more and more important the mechanical regulating system of fluid pressure type that adopts always can not be already complete to satisfy the requirement of production, especially the generation set of large scale power plant

    隨著機組容量的增加和參數的提高,啟動和運行變得越來越復雜,機組的安全性也變得越來越重要,一直採用的機械液壓式調節系統已不能完全滿足生產的要求,特別是大型火電發電機組的要求。
  6. At present the company is devoting to the large capacity thermal power unit " the new bunker oil " the development and the development, hopefully substitutes the boiler tradition the burning light diesel oil aspect, at present had the power plant to use the new bunker oil which the our company researches and develops, simultaneously the domestic many power plants are making the experiment site

    目前公司正致力於大容量火電機組的「新型燃料油」的研製和開發,有望替代鍋爐傳統的燃燒輕柴油的局面,目前已有電廠在使用我公司研發的新型燃料油,同時正在國內多家電廠做試點。