power reservoir 中文意思是什麼

power reservoir 解釋
動力貯存器
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  1. Currently we have 91 men power. equipped with all kinds of foam engines including 6 trucks of 3, 000 gallons, 2 trucks of 1, 500 gallons, 2 ea of providing 5, 000 gallons water s reservoir trucks, 1 ea 45 meters aerial ladder, in addition, we have one set of equipment on aircraft vacuation, a hoist truck and all kinds of rescue equipments

    現有人力九十一員,備有各型化學泡沫消防車3 , 000加侖六輛、 1 , 500加侖二輛、中繼水庫車5 , 000加侖二輛、 45公尺雲梯消防車一輛;另備有航機撤運裝備一組、吊掛車一輛、及各類搶救器材裝備。
  2. We worked hard to prevent and control water pollution in key river valleys and regions, such as the three gorges reservoir area, the songhua river, the sources and routes of the south - to - north water diversion project, and the bohai sea. we carried out key environmental protection projects to desulphurize emissions from coal - fired power plants, treat urban sewage and dispose of waste safely

    積極推進重點行業重點企業和重點工程的節能工作,開展循環經濟試點,加強三峽庫區松花江南水北調水源及沿線渤海等重點流域和區域水污染防治工作,實施燃煤電廠脫硫城市污水處理垃圾無害化處理等環保重點工程。
  3. Power steering reservoir hand brake lever

    手剎控制桿
  4. Nilometer is widely used in the system of automatic detection and automation in many water supply such as oil industry, chemical industry, metallurgy industry, electric power, irrigation works, reservoir, bulk plant, pumping station, towns water and so on. and it is a important tool in these fields

    水位、閘位計廣泛應用於石油、化工、冶金、電力、水利、水庫、油庫、泵站、城市供水等領域的自動檢測和控制系統中,是這些領域不可缺少的一種重要工具。
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  6. At last, considering the running trait of hydraulic turbine in true power stations, combining the complex pipe line system, generating electri city, discharge flood all use of pan shi tou reservoir compute the unsteady transition process

    最後考慮了實際電站水輪機組的運行特性,結合盤石頭水庫引水、發電、泄洪共用的復雜引水系統,進行了電站甩負荷引起的非恆定過渡過程計算。
  7. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  8. Retrofit of nanshan reservoir power station in chen zhou city

    嵊州市南山水庫電站更新改造
  9. Activities such as rowing, scuba diving, fin swimming, etc. cable ski and skiing using new types of power boat which would not cause pollution should be allowed in the reservoir

    劃艇、潛水、潛泳等活動與使用新式動力船的繩索滑水和滑水運動都不會造成污染,應容許在水塘進行。
  10. Construction survey technology for upper reservoir of zhanghewan pumped storage power station

    張河灣抽水蓄能電站上水庫施工測量技術
  11. However, water transfer from dan jiang kou reservoir will bring about the decrease of hydro power output and electricity energy

    天然來水對調水規模和發電的影響; 4漢江集團公司的對策分析。
  12. Pumping water into the reservoir of a hydroelectric power plant may be a good way of storing energy captured by wind farms ( see article ) ? but what if there are no such plants to hand and no high - tension lines to reach them

    將水壓入水利發電站的水庫可能是儲存風電場所獲能量的好方法(見文) ,但是,如果沒有可蓄水的水利發電站或可傳輸電能的高壓電線,那麼情況又將如何呢?
  13. On the basis of anatomizing the condition of hydrogeology with zhongliang water resources and power engineering, combined with the data analysis of flux with surface water, aquatic chemistry, and experiment of tracing, the condition of karst leakage in the region of reservoir is educed. the concept of reservoir leakage with these information is put forward, the leakage quantity of karst water in the region of reservoir with the method of water equilibrium is applied

    在仔細分析中梁水利水電工程庫區水文地質條件的基礎上,結合地表水測流資料、水化學分析資料及示蹤連通試驗資料,得出水庫區巖溶滲漏條件,並在此基礎上提出水庫滲漏概念模型,採用水均衡法計算出庫區的巖溶水滲漏量。
  14. By analyzing interval flood and cascade operation characteristics of the upstream yellow river basin, the influence of longyangxia reservoir operation mode in different states on gongboxia power station construction during flood period is studied

    分析區間洪水特性和黃河上游梯級運行特點,針對龍羊峽水庫實際運行狀況,分析不同狀態下的龍庫運行方式對公伯峽水電站的施工渡汛影響。
  15. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  16. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  17. Because the cascaded flow - thought delay time. daily power benefit has affected not only by previous day but by next day, daily power benefit is composed of " plant day " part and " effect day " part. based on the theory analysis, author developed a program what can well describes the cascaded reservoir short - term optimistic dispatch system model

    由於梯級水流滯時的存在,日發電效益既受前日影響,也影響次日,為考慮水流滯后帶來的影響,將日發電效益視為兩部分組成: 「計劃日」部分和「影響日」部分。
  18. As the reservoir of man-power fell, all demands had to be cut.

    當人力儲備低落時,一切對人力的要求就不得不削減。
  19. Embankment technology for concrete faced rockfill dam of upper reservoir of bailianhe pumped - storage power station

    白蓮河抽水蓄能電站上庫面板堆石壩填築技術
  20. Tiger leaping gorge hydroelectric power station, located at the boundary between lijiang autonomous prefecture and diqing autonomous prefecture of the northwestard of yunnan province, is the regulating reservoir on jinshajiang river

    金沙江虎跳峽水電樞紐位於雲南省西北部迪慶藏族自治州和麗江納西族自治州交界處,是金沙江的龍頭水庫。
分享友人