power resources 中文意思是什麼

power resources 解釋
動力資源
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • resources : 漁業資源
  1. Bing high power resources of millimeter - wave radiation, based on electron cyclotron maser, gyrotron has been pay much respect in the world for vast applications in many areas such as plasama calefaction, linear accelerators, millimeter wave radar, communications, electronic countermeasure and so forth. prof. liu shenggang began the research on electron cyclotron maser, and later, the group leaded by prof. li hongfu has done much research work on gyrotron also, and later, they have began the research on a kind of gyrotron amplifier - - - - - - gyroklystron

    迴旋脈塞器件? ?迴旋管作為大功率毫米波源,在等離子體加熱、線性加速器、雷達、通信及電子對抗等領域有著廣泛的應用前景,因此受到了國際上的廣泛重視,特別是近三十年來,迴旋管得到了快速的發展,並成為了研究的熱門方向。
  2. Following the increasing capability of wind power, the distribution networks will be under disturbances by reason of the randomness and intermittence of the power resources

    由於風能具有隨機性和間歇性的特點,隨著風電規模的不斷擴大,電網將持續受到風電場波動功率源的干擾。
  3. The impulse type turbines are the best election for high head and small discharge hydraulic power resources. they have compact structure, small size, and high efficiency and need fewer investments. they have been divided into turgo and pelton type

    沖擊式水輪機是開發高水頭,小流量水力資源的最佳機構,它具有投資小,效率高,體積小,結構緊湊等特點。該機型又分斜擊式水斗式兩種。
  4. The third part is based on the former two parts, under the context of space power resources technology, designs and improves human resources management system and efficiency assessment system, so as to farther improve the management efficiency and fully explore the potential in the running of the company

    第三部分是在前兩部分基礎上,結合航天電源科技進行人力資源管理系統、績效評價體系的設計提高管理績效、挖掘潛力促進企業的經營。第四部分對系統運行情況進行評估,同時反映人力資源管理在西部落後地區的意義。
  5. The axial flow type turbines are available for hydrauric power resources of medium and low heads. ganfa manufactures both the propeller type fixed blade type and the kaplan type adjustable blade type turbines. the propeller type turbines are suitable for hydropower stations with small or medium capacities and heads, and relatively stable loads. the kaplan turbines are suitable for hydropower stations with medium or large capacities and heads, and relatively unstable loads

    軸流式水輪機適應于開發中低水頭水力資源。我公司生產的軸流式水輪機按轉輪結構分為定槳zd轉槳zz兩種,定槳式一般適用於中小容量及水頭負荷變化較小的的水電站轉槳式多用於大中型電站及水頭負荷變化較大的水電站。
  6. The developments are researched in main introduction dissertation research aim, sense, substance and means and home and abroad to first section introduction ; human resource development administration fundamental theory together with practice foundation were elaborateed to second section. and imports wu gang ' s human resource and administer at some inspirations that obtain ; third section is by means of the greats quantity data examples, and the presentsituation to analyse wu gang ' s human resource development reaches the problem that is through amount up the quality, and demonstrated to create fundamental reason of problem along with settlement problem at some considerations ; the four bibliographic categories branch was depictd wu gang ' s continueing development target program from the end of the tenth - five - year plan to 2010, and utilizes contemporary labour power resources development administrations idea and mathematical model. and is living to adjust wu gang ' s human resource to be underway on the systematic conformity base

    第一部分緒論,主要介紹論文研究的目的、意義、內容和方法及國內外研究動態;第二部分闡述了人力資源開發管理的基本理論與實踐依據,並導入武鋼人力資源管理得出的幾點啟示;第三部分通過大量的數據例證,從數量到質量分析了武鋼人力資源開發的現狀及存在的問題,論證了造成問題的根本原因以及解決問題的幾點思考;第四部分描述了武鋼到「十五」末至2010年的可持續發展目標規劃,並運用現代人力資源開發管理的思想和數學模型,在對武鋼人力資源進行系統整合的基礎上,制定了武鋼人力資源目標規劃;第五部分闡述了武鋼人力資源開發的戰略和對策:改革管理、人本第一,結構調整、開發潛能,目標培養、重點開發,知識更新、整體開發,績效考核、激勵創造,利益捆綁、留住人才。
  7. The governmental function must be readjusted, the system reform must be further deepened, the public service system of urban and rural integration must be established, the rural man - power resources market must be opened and improved to facilitate the ordered migration of the rural man - power, and the rural basic education and vocational education must be promoted

    合理定位政府角色,正確發揮政府職能;深化體制改革,加快城鄉一體化公共服務體系的建立;建立和完善農村人力資源市場配置機制,實現農村勞動力有序流動;加快發展農村基礎教育和辦好農村職業教育。
  8. Abstract : having conducted investigation into problems related to the macro development of exploitation of pearl river valley ' s water power resources , the authors discuss water power resources of the valley and conditions and level of their exploitation and probe into the strategic deployment for their exploitation in the mid 21 century according to the economic development, electric power planning and also possibilities of regional network construction of related provinces

    文摘:對珠江流域水能資源開發利用宏觀發展有關問題進行了研究,著重論述本流域水能資源及其開發利用條件和開發程度,根據各省(區)經濟發展、電力規劃和區域電網結構建設的可能性,探討21世紀前期,重點是21世紀前20年開發的戰略部署。
  9. By incorporating the power sources location and load prediction results in the energy utilizing proposal, a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made, the result of which indicates that, it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together

    並結合區內電源點分佈和負荷預測結果,進行了各縣三個五年計劃期間的電力電量平衡。得到了相應的結論。基於對風能、光能和水能資源開發各自特點的分析,文中進一步對多能互補系統進行了較深入的研究,明確了在阿里地區特定的自然條件下,採用風光互補抽水蓄能開發方式的合理性及可行性。
  10. The region is abundant with light, heat and wind power resources for development, tourist scenic - spots with majestic scenery and colourful human and historical remains

    境內有雪山冰川和永久性積雪164平方公里,待開發的光熱風能資源極為豐富。
  11. Firstly, through analyzing massive materials and data, this paper summarizes the main problems of resources and environment confronted with jiangsu province, which are the decrease of per capita amount of land and water resources, the insufficient amount and low self - support rate of mineral and power resources, the low use efficiency and serious waste phenomena, the great emitting quantity of waste water, waste gas and kinds of pollutants, the worrying water quality of surface water and seawater, the bad air condition and the heavy pollution of acid rain

    本文首先通過對大量的資料和數據分析,歸納了江蘇省資源、環境面臨的主要問題:土地、水資源人均佔有量持續遞減,礦產、能源資源總量少、自給率低,且各種資源存在利用效率不高、浪費嚴重等諸多問題;廢水、廢氣及污染物排放量大,地表水、海水水質堪憂,空氣質量差,酸雨污染較重。
  12. Being high power resources of millimeter - wave radiation, gyrotron has broken through and resolved the difficulties which the traditional microwave devices faced. it brings a lot of hope and promotion to application and deploitation of millimeter and submillimeter - wave

    迴旋管作為大功率毫米波源,在機理上突破和解決了傳統微波器件所遇到的困難,對毫米、亞毫米波波段的開拓和利用帶來了新的希望和巨大的推動作用。
  13. Being high power resources of millimeter - wave radiation, based on electron cyclotron maser, gyrotron has been pay much respect in the world for vast application in many areas such as plasma heating, linear accelerators, radar, communication, electronic countermeasure and so forth

    迴旋脈塞器件-迴旋管作為大功率毫米波源,在等離子加熱、線性加速器、雷達、通信及電子對抗等領域有著廣泛的應用前景,由此受到了國際上的高度重視。
  14. Being high power resources of millimeter - wave radiation, based on electron cyclotron maser, gyrotron has been pay much respect in the world for vast applications in many areas such as plasma heating, linear accelerators, millimeter wave radar, communications, electronic countermeasure and so forth. specifically in twenty years later, there was much developments on gyrotron

    迴旋脈塞器件? ?迴旋管作為大功率毫米波源,在等離子體加熱、線性加速器、雷達、通信及電子對抗等領域有著廣泛的應用前景,由此受到了國際上的高度重視,特別是近二十年來,迴旋管得到了快速的發展,並成為研究的熱門方向。
  15. The current situation of man - power resources and the counter - measures in the course of new rural construction in suzhou

    蘇州新農村建設進程中的人力資源現狀分析和開發對策研究
  16. The direct power - purchase pattern for large user is a new purchase pattern during the reform of electric marketization in china. not only can it mine the potential power market, but it could introduce the competition mechanism on the side of sale, perfect the mechanism of electric pricing and reasonably assemble the power resources on the base of price

    大用戶直購電模式是電力市場改革中引入的一種新型購電模式,它不但能進一步挖掘電力市場潛力,更重要的是在售電側引入競爭機制,完善電價形成機制,以價格信號合理配置電力資源。
  17. High frequency system in high power resources of millimeter - wave radiation, such as resonator system, it ' s capability performs a vital role in whole high power microwave system. computer simulation is necessary in design process. basing on academic analyzing, simulation of resonator system with computer assistant tools will be very useful to optimize the apparatus designing

    高功率微波源中的高頻系統,如諧振腔系統等,其設計性能對整個高功率微波系統起著至關重要的作用,設計過程中的計算機模擬亦是必不可少的。
  18. Application of double power resources automatic transforming switch equipment

    雙電源自動切換裝置的應用
  19. The contribution to the improvement of original system presented in the thesis can be summarized as : a - provision with a framework of the further san - ying erp system, which is formed of 10 sub - systems, namely, production, planning, accounting, human power resources, production equipment, stocks, sales, supply, dss ( decision support system ), and system maintenance and management

    提出了三英紡織廠erp系統的總體框架:整個系統劃分為生產、計劃、財務、人力資源、設備、庫存、銷售、供應、決策支持和系統管理10個子系統。
  20. This text passes to many single items, concrete of, not the engineering item of the congeniality manage a project, taking the electric power resources as group leader to pass by iterative excellent turn, fold to add to draw up a study that combines an item implement project with integration, investigate the combination type item a management theories and it constucts the application in the engineering in the electric power

    本文通過對多個單項、具體的、不同性質的工程項目管理方案,以電力資源為龍頭經過反復的優化、疊加和整合制定出一個組合型項目實施方案的探討,探索組合型項目管理理論及其在電力建設工程中的應用。
分享友人