precast concrete beam 中文意思是什麼

precast concrete beam 解釋
預制混凝土梁
  • precast : vt. ,adj. 【建築】預制(的);預澆鑄(的)。 precast reinforced concrete beams 預制鋼筋混凝土梁。
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  1. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型梁具有結構新、工藝復雜、體積大、運輸困難,將常規鐵路的橋梁廠製造橋梁、經過鐵路運梁到工地、邊鋪邊架進行橋梁製造與架設的傳統施工模式應用到該線是行不通的,必須在現場預制橋梁、並採用專門的運架梁設備進行橋梁架設,因此箱梁的製造、架設施工成為該線施工技術攻關的重點和難點。
  2. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗橋設計使用壽命100年的要求,確定出高耐久性混凝土的設計控制指標,基於最緊密堆積原理和最佳漿骨比原理對橋梁的墩柱、蓋梁、預制箱梁和橋面板用高耐久性混凝土的配合比進行設計,並對其施工應用技術進行了研究。
  3. Precast pretensioned concrete beam

    預制先張混凝土梁
  4. The results show that the performances of precast prestressed beam - to - column concrete connections with unbonded tendons are equal or superior to that of a monolithic connection in terms of ductility and displacement - restoring capacity

    結果表明,無粘結預應力裝配式混凝土框架連接具有良好的耗能能力,在延性和變形恢復能力上比現澆連接更優。
  5. Precast concrete beam

    預制混凝土梁
  6. Precast prestressed concrete beam

    預制預應力混凝土梁
  7. Based on tests of three moment - resisting beam - column connections under low reversed cyclic loading, this paper inquires into the failure pattern, hysteresis loop curves, displacement - restoring capacity, displacement ductility and energy dissipation of the precast prestressed beam - to - column concrete connections with unbonded tendons

    摘要通過三個框架節點在低周反復荷載下的試驗,對無粘結預應力裝配式混凝土框架連接的破壞形態、滯回曲線、變形恢復能力、位移延性、能量耗散等性能進行了研究。
分享友人