predecessor task 中文意思是什麼

predecessor task 解釋
先行任務
  • predecessor : n. 1. 前任;前輩;〈古語〉祖先。2. 【農業】前作;【數學】前趨。3. (被取代的)原先的東西。
  • task : n. 1. (派定的)工作,任務,功課。2. 艱苦的工作,苦差使。3. 〈廢語〉租稅,稅款。vt. 1. 派給工作。2. 虐待,使作苦工。3. 〈廢語〉課稅。
  1. Painting the walls is the predecessor task for hanging the clocks

    「粉刷墻壁」就是「懸掛鐘表」的前置任務。
  2. Or, if the electrician can begin wiring display cases after half the cases are installed, the " install and position case lights " task can start when the " install wood and glass cases " task is 50 percent complete, regardless of the duration of the predecessor task.

    或者,如果電器工程師可以在燈具裝好一半的時候開始鋪設線路,則任務「燈具通電」在任務「安裝燈具」完成了50 %的時候開始,而不必考慮前置任務工期的長短。
  3. Based on summarized and analyzed the existing problems of the solution for scheduling rtrpmt and tft, the author constructs a new heuristic function which adequately takes predecessor and successor relation among tasks into account, targeting that the direct successor of current running task is to be given the earliest time to be run

    針對實時分佈系統中大量的相關周期性多任務,在分析、總結了前人對此類任務的調度演算法解決方案所存在的問題基礎上,構造了一種新的啟發函數,該啟發函數充分考慮了任務之間的前驅、后繼關系,以當前任務的直接后繼具有最早開始執行時間為目標。
  4. Standard : microsoft project checks tasks in the order of their predecessor dependencies, slack, dates, priority, and then task constraints

    標準: microsoftproject以此順序來檢查任務:任務與其前置任務的相關性、時差、日期、優先級,任務的限制。
  5. Priority, standard : microsoft project checks the priorities of tasks to be leveled before considering predecessor dependencies, slack, dates, and then task constraints

    優先權,標準: microsoftproject在考慮任務與前置任務的相關性、時差、日期、優先級、任務的限制之前,首先檢查任務的優先級。
  6. * * * * for example, if it ' s a finish - to - start ( fs ) link, the task begins as soon as its predecessor finishes

    譬如,如果是完成-開始( fs )鏈接,則任務的開始日期為其前置任務的完成日期;如果是開始-開始( ss )鏈接,則任務的開始日期為其前置任務的開始日期。
  7. Most likely, you ' ve linked many of your tasks with a finish - to - start ( fs ) link, so that the successor task does n ' t start until its predecessor task finishes

    很可能您已使用完成-開始( fs )關系鏈接了很多任務,因此後續任務要等其前置任務結束后才能開始。
  8. For example, if a task can start when its predecessor is half finished, you can specify a finish - to - start dependency with a lead time of 50 % for the successor task

    譬如,如果一個任務在其前置任務完成一半時可開始,則可以為其指定完成-開始相關性,且后續任務的前置重疊時間為50 % 。
  9. You can express lead or lag time as units of time or as a percentage of the predecessor task ' s duration

    可以使用時間單位或前置任務工期的百分比來表示前置重疊時間或延隔時間。
  10. Predecessor tasks might not finish before a constrained task starts

    譬如,受限制的任務如期開始時,其前置任務因故無法按時完成。
  11. Starting a task as soon as its links with predecessor tasks, if any, allow

    如果鏈接有前置任務,使本任務在它之後盡可能早地開始。
  12. A task with an inflexible constraint does n ' t move, even if predecessor tasks finish later than planned

    即使其前置任務晚于規劃完成,有非彈性限制的任務也不會移動。
  13. A task that must start or finish before another task can begin is called a predecessor task

    如果某一任務必須在另一任務開始之前開始或完成,則此任務稱為「前置任務」 。
  14. * * * but sometimes the work on a successor task can begin before its predecessor task is entirely finished

    但有時后續任務中的工作也可在其前置任務完全結束之前開始,也就是工作可以重疊。
  15. With lead time, you can overlap two tasks so that a successor task starts before the predecessor task finishes

    使用前置重疊時間可以將兩任務重疊,從而後續任務將在前置任務完成之前開始。
  16. 5. position the pointer over the gantt bar for the predecessor task and drag to the successor task in the other project

    5 .將指針指向甘特圖中某條形圖的前置任務,並拖動到另一項目的后續任務位置。
  17. If a predecessor task ends up overlapping the constrained task, a resource assigned to both tasks might be overloaded with work on the overlapping days

    如果前置任務最終與受條件限制的任務發生重疊,則同時分配給這兩個任務的資源在任務重疊期間將過度分配。
  18. * * * * with a start - to - start ( ss ) link, the task begins when its predecessor begins. for more information about task relationships, see chapter 5, " getting tasks done in the right order, at the right time.

    關于任務相關性的詳細情況,請參閱第5章「按恰當的順序和時間完成任務」 。
  19. A task starts after its predecessor finishes

    任務在其前置任務完成之後開始
  20. A task starts when its predecessor starts

    任務與其前置任務同時開始