preparation of construction 中文意思是什麼

preparation of construction 解釋
施工設備
  • preparation : n 1 準備,預備;〈常 pl 〉準備工作[措施];預修,預習 (for) 預習時間;(對…的)準備。2 (藥、菜...
  • of : OF =Old French 古法語。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Metal construction. jointing by means of bolts with controlled tightening. fabrication and preparation of joints

    金屬結構.可控拉緊螺栓連接.連接件製造和準備
  2. Construction of the formwork and preparation of the metal reinforcement for shells required particular care and accuracy because of their limited thickness.

    由於殼體的厚度有限,殼體的金屬能加工制備與模板建造需要特別細心與精確。
  3. Metal construction. preparation of parts in the factory

    金屬結構.構件在工廠中的制備
  4. Article 36 the preparation and construction office is responsible for the following concrete works : examining the designs of the project, signing the project construction contract, organizing the purchase and inspection of related equipment, materials, etc., working out the general schedule of project construction, compiling the expenditure plans, controlling project financial payments and final accounts of the project, drawing up managerial methods and keeping and filing documents, drawings, files and materials, etc., during the construction period of the project

    第三十六條籌建處具體負責審查工程設計,簽訂工程施工承包合同,組織有關設備、材料等物資的采購和驗收,制定有關的管理辦法,做好工程施工過程中文件、圖紙、檔案、資料的保管和整理等工作。
  5. 3. based on the bond test for 33 concrete specimens and gfrp and bending test for 15 beams strengthening with gfrp, surface preparation of concrete, type of epoxy adhesives, thickness of adhesives, hardening time of adhesives, cure condition after strengthening are considered, and the effect on concrete structures strengthening with gfrp causing by construction behavior was analyzed. 4

    根據gfrp片材加固混凝土結構在施工中常涉及到的一些相關因素,如混凝土基層表面處理情況、所選用的粘結劑類型、塗抹粘結劑的厚度、加固的方式以及養護狀況,進行了33個混凝土試件與gfrp片材的剪切粘結試驗,並進行了採用gfrp片材加固的15根混凝土梁的抗彎試驗,分析了與施工性能相關的因素對gfrp片材加固混凝土結構效果的影響。
  6. This text is main from the right independent directors and the companies of appearing on the market of three aspects to manage the construction to proceed the treatise : the first part, introduced the law meaning, the job and function, the history background and development trend of the independent directors ; part of the second, ami at the preparation of the theories and policy of independent directors system in the current our country, it was analyzed to the practice and problem of the companies of appearing on the market and expounded the important function of independent directors to perfect company manage construction ; part of the third, point out the problem of a few keys of developments of independent directors system which current influence the companies of appearing on the market in our country, bring up some speculation to perfect the independent directors of the companies of appearing on the market in our country, try hard to regulate the independent directors system from law, policy, system. . etc.,

    同時,分析獨立董事發揮作用的特定環境與條件,逐步完善有關的政策法規,解決影響我國上市公司獨立董事發揮作用的幾個關鍵問題,加快相關法制、政策與制度建設是推行上市公司獨立董事建設的當務之急。本文主要從三個方面對獨立董事與上市公司治理結構進行論述:第一部分,介紹了獨立董事的法律含義、獨立董事的職責與作用、產生的歷史背景與發展趨勢;第二部分,針對目前我國獨立董事制度建設的理論與政策準備,分析了上市公司獨立董事的實踐與存在的問題、闡述了獨立董事對完善公司治理結構的重要作用;第三部分,重點就目前影響我國上市公司獨立董事制度建設的幾個關鍵問題,提出了完善我國上市公司獨立董事制度的若干構想,力求從法律、政策、制度等方面規范獨立董事制度,促進我國上市公司治理結構的完善。
  7. This article first introduces physical geography general situation, clarifies the rank of this hydroproject, the grade and layout of its hydraulic structures, and expounds the necessity and feasibility of this project. then, this paper further gave a clear explanation of the developing summarize of construction diversion for embankment dams. this study made a theoretical preparation for its construction diversion

    本文首先介紹了四湖溝水利樞紐工程的天然地理概況,闡明了水工建築物的等級及工程布置,說明了四湖溝工程建設的必要性和可行性,文中進一步闡明了土石壩施工導流發展的概況,為四湖溝水利樞紐工程施工導流作出了理論上的準備。
  8. Participate in installation, commissioning and putting - in - service proactively on the stage of construction and production preparation, to ensure all units start up smoothly

    在安裝施工和生產準備階段,積極參與現場儀表設備的安裝、調試、投用,確保裝置順利開車投產。
  9. 1902 - 704 methods of testing refractory materials - unshaped refractories used in monolithic construction - preparation of test pieces from insulating castables method 1902 - 704

    耐火材料試驗方法.第7部分:整體結構用未成形耐火材料.第4節:隔離澆注試件制備
  10. 1902 - 703 methods of testing refractory materials - unshaped refractories used in monolithic construction - preparation of test pieces from dense castables by vibration method 1902 - 703

    耐火材料試驗方法.第7部分:整體結構用未成形耐火材料.第3節:振動密實澆注試件制備
  11. 1902 - 705 methods of testing refractory materials - unshaped refractories used in monolithic construction - preparation of test pieces from mouldables and ramming mixes method 1902 - 705

    耐火材料試驗方法.第7部分:整體結構用未成形耐火材料.第5節:可塑和夯築混合試件制備
  12. This paper introduces a new construction method of lowering ground water level suitable for sandy soil area regarding preparation of construction equipment and materials, construction procedure, attentive matters for construction and so on

    文章從施工設備及材料的準備、施工步驟、施工注意事項等方面介紹了一種適用於砂土地區降水的新方法。
  13. The paper puts forward the structure of debris - retaining works system, layout consideration and construction principle for the coarse sand concentrated coming area, time sequence of the works construction of " large - scale first and small - scale second ", " downstream first and upper stream second ", and " carrying out section by section " and some problems demanding prompt solution according to the present facts and ; to speed up the preparation of a large - scale debris - retaining reservoir ; to draft the standards for a large - scale debris - retaining reservoir as quick as possible and ; lay emphasis on the schedule of various projects and correct understanding and fully playing the function of key dams through the analysis on achievements and problems of debris - retaining works building and combining with the gully characteristics of coarse sand concentrated coming area

    摘要通過對粗泥沙集中來源區攔沙工程建設成就與問題的分析,結合粗泥沙集中來源區溝道特徵,提出了粗泥沙集中來源區攔沙工程體系的構成、布局思路、建設原則,提出了「先大后小」 、 「先下後上」和「分段實施」的攔沙工程建設時序,並針對當前工作實際,提出了亟待解決的幾個問題:加快大型攔泥庫前期工作步伐、盡快制定大型攔泥庫標準、重視各類工程實施進度以及正確理解和執行規范、充分發揮骨幹壩的作用等。
  14. Sichuan jiaoda civil engineering consultancy co., ltd is mainly engaged in examination of construction design documentation for road, bridge and tunnel projects, preparation of project feasibility study report, engineering consultancy and stress calculation and analysis for various large structures

    四川交大土木工程咨詢有限公司,主要從事道路、橋梁、隧道等工程的施工圖設計文件審查:工程可行性研究報告編制;工程技術咨詢及各類大型結構的受力計算與分析。
  15. This paper expounds a series of the construction techniques for the paving of steel fiber reinforced concrete deck including the requirements for the raw materials, the preparation of the construction, and the mixing, transporting, pouring and curing of the mixtures for the purpose of guaranteeing the quality and schedule of the construction of paving the steel fiber reinforced concrete deck

    論述了鋼纖維混凝土橋面鋪裝施工的原材料要求、施工準備、混合料拌和、運輸、澆築、養生等一系列施工工藝,以提高鋼纖維混凝土橋面鋪裝的施工質量與進度。
  16. Preparation for construction : the surface of the under layer should be even and firm, and in accordance with the design requirement, without loose material and flaccid site, and need to reroll 2 3 times within full - width range of the subgrade with vibrating roller before the construction, as well as test the compaction and defecting, to check whether there is unqualified point in the soil base

    施工準備:施工前下承層表面要平整、堅實,符合設計要求,無鬆散材料和軟弱地點,施工前要用振動壓路機在路基全寬范圍內復壓2 3遍,同時進行壓實度及彎沉檢驗,檢查土基中是否有不合格點。
  17. The word " work " means the engineering, design ( including, but not limited to, primary design, extended preliminary design and preparation of detailed design and construction drawings ), construction ( including, but not limited to, early work, site setting out, earth back filling works, sub - structure works, civil works, above - ground works, installation and testing ) and construction management services to be performed by the development manager and subcontractors pursuant to the provisions of this contract and a written authorization, and as modified from time to time in accordance with the provisions of this contract, and includes all designs, drawings, plans, means, methods, techniques, sequences and procedures and, unless expressed to the contrary in this contract, all materials, tools, utilities, labor, equipment services, licenses, permits, tests, warranties, guarantees, transportation and other items and facilities of every kind necessary for the complete performance of this contract

    「工程」一詞應指由開發管理人和分包商根據本合同的規定和書面授權書執行的工程、設計(包括但不限於初步設計、擴初設計以及深化設計圖和施工圖的準備) 、施工(包括但不限於前期工作、現場布局、回填土工程、次結構工程、市政工程、地上工程、安裝和測試)及施工管理服務,該等服務可根據本合同的規定被不時修訂,並包括所有的設計、圖紙、計劃、手段、方法、技術、工序和程序以及,除非合同中有相反規定,所有的材料工具、設施、工人、設備服務、執照、許可證、測試、保證、擔保、交通以及其他為圓滿執行本合同所需要的各種物品和設施。
  18. Standard practice for preparation of airborne particulate lead samples collected during abatement and construction activities for subsequent analysis by atomic spectrometry

    原子光譜分析用放射性強度衰減時空氣中微粒鉛樣品制備的標準規程
  19. Practice for preparation of airborne particulate lead samples collected during abatement and construction activities for subsequent analysis by atomic spectrometry

    用原子光譜測定法在對後期分析消除和構建活動過程中收集的空中微粒鉛樣本制備實施規程
  20. With reference to the hydrologic data and geologic conditions of the changjiang river over the years, this paper analyzes the features of and key technical problems to be resolved in the construction of in - water pier foundations in the north river branch of tianxingzhou changjiang river bridge. accounts for the construction organization principle preparation and construction implementation of the foundations, comparison and selection of working platform and steel cofferdam to be used at each pier site, and also summarizes the construction methods for the deep water steel cofferdams of the bridge

    摘要根據長江歷年水文資料、地質情況,分析了天興洲長江大橋北汊水中墩基礎施工的工程特點和要解決的關鍵技術,介紹了施工組織的原則制定和實施過程、各墩位平臺及圍堰的方案比選,總結了該橋深水鋼圍堰的施工方法。
分享友人