preparatory construction 中文意思是什麼

preparatory construction 解釋
準備工程
  • preparatory : adj 準備的,預備的;籌備的。 a preparatory committee for a congress 大會的籌備委員會。 a preparat...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Later, in october 1976, a cks memorial hall building, preparatory directing committee was established. messrs. chang chun, ho ying - ching, chen li - fu, ni wen - ya, wang yun - wu, yu bin, chien ssu - liang, huang shao - ku, ku cheng - kang, huang chie, lin bo - shou, wu ching - hsiung, lien chen - tung, chen chi - tien, hsu ching - chung, chang bao - shu, hsieh tung - min, sun ya - fu, liu kuo - tsai, dai yen - huei, liu ji - hung, chou bai - lien, tsai hung - wen, lin ting - sheng, and lin yang - kang, were invited to serve as committee directors to oversee construction of the hall

    嗣於六十五年十月成立中正紀念堂籌建指導委員會,敦請張群何應欽陳立夫倪文亞王雲五于斌錢思亮黃少穀穀正綱黃傑林伯壽吳經熊連震東陳啟天徐慶鐘張寶樹謝東閔孫亞夫劉闊才戴炎輝劉季洪周百練蔡鴻文林挺生林洋港等二十五位先生為指導委員,指導建堂工作,俾臻完善。
  2. Whole story of preparatory construction of shanghai mint

    上海造幣廠籌建始末
  3. This text through the study of management at preparatory stages of project under construction to engineering, construct course and the time of completion, have systematically explained the management of the whole course of project under construction of engineering

    本文通過對工程建設施工項目準備期、施工過程及竣工期的管理進行研究,系統地闡述了工程建設施工項目全過程的管理。
  4. Supervision work in preparatory construction stage

    施工準備階段的監理工作
  5. This paper makes a study on how a supervision engineer should carry out the supervision work from the following aspects, i. e. inspection over safety techniques, supervision at the preparatory stage before construction, supervision at the main structure construction stage, supervision at the stage of decoration, and supervision over seasonal construction

    文章從安全技術措施的審查、開工前施工準備階段的安全監理、主體施工階段的安全監理、裝飾裝修階段的安全監理、季節性施工的安全監理等幾個方面論述了監理工程師如何搞好建築工程的安全監理工作。
  6. With reference to the practice in actual work, the paper gives an introduction to some of the preparatory work relevant to the field management of mechanical construction and issues concerning the coordination at planning stage and operation of mechanical construction

    結合工作實踐,介紹了機械施工現場各項準備工作,以及機械施工計劃協調、機械施工組織調度等現場管理工作應注意的問題。
  7. Study several important jobs at the preparatory stages of construction, put forward the mutual relation on time limit for a project, quality, cost control and carry on overall analysis to these, go on deep introspection to relevant questions at the same time

    研究了施工準備期的幾項重要工作、提出了施工過程管理中工期、質量、成本控制和安全管理的相互關系,並對這幾個方面的管理工作進行了全面的剖析,同時對有關的問題進行了深刻的反思。
  8. Introduction : on january 22nd, the preparatory coordination office of the hong kong, zhuhai and macau bridge and zhuhai municipal priority projects office held a joint mobilizing conference on the geological survey for the supplementary project of the main part construction of the hong kong, zhuhai and macau bridge offshore tunnels, marking an official launching of the geological survey for the core parts of the hong kong, zhuhai and macau bridge

    22日港珠澳大橋前期協調辦公室、珠海市重大項目辦聯合召開港珠澳大橋海中橋隧主體工程補充工程地質勘察開工動員會,正式啟動港珠澳大橋核心部分的地質條件勘察工作。
  9. The increase includes provision for redevelopment of the caritas medical centre, preparatory work on the redevelopment and expansion of pok oi hospital and construction of the fanling primary health care centre

    增加的開支包括為重建明愛醫院重建及擴建博愛醫院的準備工作,以及興建粉嶺基層健康服務中心而預留的撥款。
  10. From the time order of conception, project identification, preparatory construction and opening of comic library, the paper introduces the aspects of the house decoration, collection construction, indoor layout, business work and others of the comic library

    摘要以漫畫館的構思、立項、籌建、開館的時間順序介紹了漫畫館的館舍裝修、館藏建設、室內布置、業務工作開展和各項工作情況。
分享友人