  1. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到梁段以外附近區域的作用,在其兩端面上施加了由平面桿系結構分析所得的端面內力,另外,索力和預加力(梁縱向、橫隔梁橫向、斜腹板豎向)也施加在相應的位置,分析了箱形主梁在自重、索力和預應力作用下的空間應力效應。
  2. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。
  3. Construction technology of prestressing anchor cable consolidation for high road cut side slope

    預應力錨索加固高路塹邊坡施工技術
  4. The seperated pair of main ribs section was made up by bridge panel and girder, because its construction is convenient, used widely in the prestressing force concrete cable - stay bridge of large span

    回答:分離式雙主肋截面是由橋面板與邊主梁組合而成,由於其施工方便,在大跨度預應力混凝土斜拉橋中得到廣泛應用。
  5. The influence of some design parameters, such as density of net, rise - span ratio, height of strut, prestressing tension of cable, are analyzed, some economical and reasonable optimized parameters were gotten

    分析了網格密度、矢跨比、撐桿長度、鋼索預應力值等設計參數對弦支穹頂各項性能指標的影響,得到了經濟合理的設計參數取值范圍。
  6. Considered local damage due to steels corrosion, fatigue, prestressing loses, whole bridge incline and distortion, this paper studies damage diagnosis technique of the cable - stayed bridge and determines the location and size of damages for yonghe cable - stayed bridge, which has been used after 15 years

    針對鋼筋腐蝕、疲勞、預應力鬆弛、橋梁整體傾斜或變形所引起的斜拉橋局部破損,本文以使用15年後的永和斜拉橋為研究對象,對大型斜拉橋破損診斷技術進行研究,對永和斜拉橋破損位置進行定位、對其破損程度進行評價。
  7. Normally there are hundreds of cables in a continuous beam bridge, especially in an indeterminate structure. and the shape of the prestressing cable is complicated, so it has great difficulties in its drawing

    預應力鋼束因其線形變化多,大都又呈曲線狀,而對于大型復雜的預應力結構,如連續梁橋,往往有幾百根鋼束,幾十種形狀,所以鋼束圖的繪制任務繁重。
  8. Based on such characteristics and the researches of the country and outside, this paper mainly studies at the automatic distribution of prestressing cables of prestressed concrete beam bridge and the automatic working drawing of the steel bundles. in this paper, based on the study of the group of the project, it sets up a fuzzy optimum math - model of the prestressed degree for prestressing cables disposition of prestressed concrete continuous beam bridges. and in the drawing of the steel bundles, the set up of the " prestressing cable model " makes its course convenient

    本文針對現有的橋梁cad系統的不足,從工程實際應用的角度出發,初步構想了預應力混凝土梁橋cad系統的框架,並主要在其自動配束以及預應力鋼束布置圖的自動繪制方面作了一定的分析與研究:在配束方面,根據其設計的特點及存在預應力束調配過程煩瑣的現象,引入數學方法,基於模糊集合和預應力度的概念,初步探討了連續梁橋預應力鋼束自動配置的機理;在鋼束圖的繪制上,根據對鋼束特點的分析,提出了「鋼束模型」的概念,對預應力束進行描述,並給出了控制「鋼束模型」以及鋼束布置的參數,據此,作者採用fortran語言編寫了鋼束布置圖的繪製程序,實現了鋼束布置圖的自動繪制。
  9. Three - dimensional model was also set up to analyze the structure ' s distortion, cable tension and stress state during the segmental - construction of wenhui bridge ' s girder with degenerated solid elements. the effect of prestressing force and concrete ' s creep were considered in analysis

    建立了文暉大橋主梁施工過程的空間分析模型,採用實體退化單元對主梁分段施工過程中的變形、索力及應力進行了空間模擬分析,分析中考慮了縱橫向預應力效應和混凝土徐變的影響。