primary gate 中文意思是什麼

primary gate 解釋
一號門
  • primary : adj 1 第一的,最初的,初級的;初等的;基本的;基層的。2 主要的,為首的,第一位的。3 原始的,根本...
  • gate : n 1 大門,扉,籬笆門,門扇。2 閘門;城門;洞門;隘口,峽道。3 【冶金】澆注道,澆口,切口;【無線...
  1. But from overall see development be balanced not quite, the foundation of impoverished area teachs devoted and opposite inadequacy, managerial condition is poor, because capital is not worth and the dangerous house of large quantities of one middle and primary school is couldn ' t get seasonable and reparative ; the whole nation still has at present quite a batch of children of the amount wander because of domestic poverty at the school gate besides

    但從總體看發展不夠平衡,貧困地區的基礎教育投入相對不足,辦學條件差,一大批中小學的危房因資金不足而得不到及時修繕;全國目前仍有相當數量的一批兒童因家庭貧困而徘徊于校門之外。
  2. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  3. 400 - 900mhz 300 - 1000m twoway simultaneous communication, low power consumption, wakeup mode, extensive application, the primary codes of all bottom softwares and all hardware information available. rf card networking gate controller

    支持射頻卡,密碼控制電鎖,採用讀卡器與繼電器一體化設計,卡,密碼,卡密碼均可使用,可控制2門4門8門16門。
  4. The primary work in this dissertation : a method was present to detect the radar echoes by slide - window. the calculation of gate, which was based on cfar, was present and proved both by theory and experiment result

    本文主要工作如下: 1 、提出了一種通過滑窗檢測的方法實現對雷達回波的檢測,並基於恆虛警處理技術提出一種檢測門限的計算方法,從理論推導和系統測試結果對其進行了驗證。
  5. The primary task of this thesis is how to design a set of data gathering system, which can track record original wave forms of sound signals, the moment that sound impulse range pass gate limits, the data on the orientations of vector water - sensor in the buoy and the data obtained by gps

    本論文以整個系統的硬體設計為主要研究對象,主要任務是設計一套數據採集系統,完成對聲信號的原始波形及聲脈沖幅度過門限時刻、浮標上矢量水聽器的方位數據及gps數據的記錄。
分享友人