primary mill 中文意思是什麼

primary mill 解釋
初磨機
  • primary : adj 1 第一的,最初的,初級的;初等的;基本的;基層的。2 主要的,為首的,第一位的。3 原始的,根本...
  • mill : n 1 米爾〈姓氏〉。2 James Mill 詹姆斯米爾〈1773 1836,英國經濟學家〉。3 John Stuart Mill 約翰斯圖...
  1. What exam of grade of numerical control machine wants to see you learn is which kind of machine, numerical control machine includes numerical control car specificly, mill, auger, grind, machining center is waited a moment, you need study machine of the system to add knowledge, be familiar with a machine tool, return practice of the machine on need, the most important is the person guidance that need knows, self - study is very difficult, the knowledge on book needs to combine practice a little, the proposal has gone ability school learns a few the basiccest knowledge ( 2 to 3 years ), there can be relevant grade letter after ability school graduates next ( from primary labour, intermediate class, senior worker worker, technician, senior technician, hind two kinds obtain the hardest, want knowledge not only even relevant experience, its wage scale is equal at the engineer, chief engineer one kind ) remain be about to rely on oneself to get

    數控機等級考試要看你學的是哪一類機器,數控機器具體的包括數控車,銑,鉆,磨,加工中心等等,你需要系統的學習機加知識,熟悉機床,還需要上機實踐,最重要的是需要懂的人指導,自學很難,書本上的知識有些是需要結合實踐的,建議去好一點技校學習一些最基本的知識( 2到3年) ,然後技校畢業后會有相關的等級證書(從初級工,中級工,高級工,技師,高級技師,后兩種最難取得,不僅要知識還要相關經驗,其待遇級別等同於工程師,總工程師一類)剩下的就要靠自己鉆了。
  2. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括連接、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了焊接鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出現疲勞裂縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  3. Machinery for primary processing of natural rubber. hammer mill

    天然橡膠初加工機械.錘磨機
  4. Primary ball mill

    初磨球磨機
  5. This article introduces the principle of deb and features of its function blocks. the article studies the difference, advantages and disadvantages of co - ordination control strategy under the direct energy balance and indirect energy balance. it introduces the configuration and way of max1000 + plus distributed control system, studies the characteristics and its influence to the operation of coordination control of the subsystems of mill, primary air fan etc. deeply and systematically

    本文介紹了直接能量平衡控制( deb )的原理及其功能塊的特點,研究了直接能量平衡和間接能量平衡兩種方式下協調控制策略的差異和優劣,介紹了max1000 + plus分散控制系統的組態及方法,深入而系統的研究了磨煤機,一次風機等子系統的特性及對協調控制系統投入的影響。
  6. Through the research on the loop controlling system of high speed rod mill, wuhan iron & steel company and analyzing the state of the big fluctuation of the loop and difficulty in control., this paper simulated the control system, via the system, consummating the factor that influence the loop, optimized the primary control system and find out the best curve and control parameter. finally, increase rate of eligible products for the sake of achieving the high economic benefits

    對其活套套量波動大,不易控制的狀態進行分析,模擬模擬出控制系統;並在其控制系統中分析影響活套的因素,優化控制系統,找出活套控制的最優化曲線和控制參數,從而提高產品的成材率,提高產品生產的綜合經濟效益。
分享友人