priority construction 中文意思是什麼

priority construction 解釋
近期[首期]建築。

  • priority : n. 1. (時間、順序上的)先,前。2. 較重要;上席;上位;重點,優先(權);先取權。3. 優先配給;優先考慮的事。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Based on an analysis of the history and present status of the farmland - pastoral ecotone in the northern part of china, a new point of view was proposed in this paper for the construction of eco - environmental systems, namely, the industrial structure has to be modified so as to make a functional integration between different parts of the whole system : to give priority to a combination between cultivated grassland and in - shed feeding of domestic animals, and at the same time, to employ a new model of animal husbandry so that the degradated natural grassland can be recovered ; to develop a new type of processing industry for agricultural and forestal products so as to create a pluralistic enterprise structure ; to make a better use of water resources by taking advantages of the abundant resources of energy and minerals, and to restrain the expansion of industries of high environmental cost ; to employ techniques of integration management and restoration ecology, and to speed up the process of woodland and grassland recovery ; to make a thorough plan for arrangements of hills, waters, roads, farmlands, forests and pastures in order to gain an integration at landscape level

    摘要在簡要分析中國北方農牧交錯帶形成歷史和現狀的基礎上,提出了北方地區生態環境建設必須從產業結構調整出發、進行系統功能整合的思路:把人工飼草業舍飼畜牧業擺在農牧交錯帶經濟發展的優先位置,推行新型畜牧業經營管理模式,促進天然草場改良復壯;發展「綠色」農林牧產品精細加工業,建立多元化產業結構;發揮能源和礦產資源優勢,合理利用水資源,限制以破壞環境為代價的產業的發展;推廣區域綜合治理與生態恢復技術,加大退耕還林還草的力度;山、水、路、農、林、牧統一規劃,實現生態系統在景觀水平上的整合。
  2. Considering the problem of the justification of logical theory, feng ' s such a theory requires that the construction of a logical theory adhere to the unity of a posteriority and a priority

    在邏輯理論的證成問題上, 「概念的雙重作用」要求邏輯理論的建構必須堅持后驗性與先驗性的統一。
  3. Priority construction treasury mainland china

    國家重點建設債券中國內地
  4. Nowadays, the tock of top priority is, under the quittance of the correct theory how to seize the unprecedented opportunities, and to conquer the probing, then posh the university construction to a new stag

    現在的當務之急是,我國高校如何把握這一前所未有的發展機遇,在正確的理論導向下,不斷克服困難與挑戰,將我國高校建設推上一個新的臺階。
  5. Small residential areas have become a priority with the ministry of construction.

    建設居民小區是建設部要優先解決的問題。
  6. According to the author, the fundamental principles in the construction of enterprise values should be as follows : the unification of the economic benefits and social responsibility, that of the efficiency - priority principle and the justice principle, that of the ideal goals and the actual development, and that of orientating to domestic development and facing to global markets. the main goal of the construction of enterprise values is to cultivate such ideas as manpower capital, enterprise innovation, scientific management, unbidden working, global marketing and enterprise cultural identity

    在此基礎上,本文將我國企業價值觀建設的基本原則確定為企業經濟利益與企業社會責任的統一、效率優先原則與公平合理原則的統一、確立理想目標與注重現實發展的統一、立足本土發展與面向全球市場的統一、企業價值觀共性與企業個性的統一,把人力資本觀念的培養、企業創新觀念的培養、科學管理觀念的培養、自願勞動觀念的培養、全球市場觀念的培養和企業文化認同觀念的培養作為企業價值觀建設的主要內容。
  7. Abstract : according to the safety evaluation of qiongzhou strait rail - ferry engineering , the construction protocol feasible to the rail - ferry engineering in straits and rivers in china is demonstrated. the relevant safety issues in the design and operation of the rail - ferry port are discussed. the priority issues need to considered and their safety countermeasures should be taken in the design of the project are proposed

    文摘:通過對粵海鐵路通道瓊州海峽鐵路輪渡工程的安全評價,闡述了適合於我國海峽及內河鐵路輪渡碼頭工程的建設方案,對鐵路輪渡碼頭工程設計中及運營中可能出現的危險進行了探討和分析,提出了鐵路輪渡工程安全設計中應重點加以考慮的問題和相應的安全措施。
  8. Using the simulation system for port operation and the queuing theory, the thesis studies the operation and management status of xiamen port. it is pointed that too less big berths and too many small berths are key problems, and giving priority to the development of the deep berths over 10000 tons and the reconstruction of the small berths improving their berthing ability is the developing tactic of the port, hi addition, the optimizing construction scale of xiamen port in 2010 is given in paper

    以港口運營模擬系統和排隊論方法為工具,分析研究了廈門港的運營生產狀況,針對其大船泊位偏少、小船泊位偏多的突出問題,提出了廈門港應該優先發展萬噸級以上深水泊位、改造小船泊位以提高其靠泊能力的港口發展戰略,給出了2010年廈門港的最優建設規模,為廈門港的建設與發展提供了決策依據。
  9. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  10. Giving priority to the construction of the leading bodies

    關于新時期加強領導班子建設的思路
  11. A point of code construction should be given the highest priority to promote the setting and completing of market system in order to guarantee the stridding development of social economics. in this thesis, based on the key action and important position of chongqing in the motion of the great development of west part, analysis is made on the social, economical and political methods about the two typical cases of " safegard developing plan of chiqikou traditional neighborhood and reconstruction planning of huguang neighborhood hotel safegarding. in the last chapter, based on the construction of regulation, we set up a brief code system for traditional neghborhood safegarding planning

    本文正是由此出發,以重慶市在西部大開發戰略中的關鍵作用及地位為出發點,將「有所作為」作為其「制度建設優先的發展之路」的基點,以制度建設理論的基本概念作為論文觀點闡述的框架,結合重慶市五十年建設歷程的回顧及目前城市歷史街區保護的現狀,並將其置於國際舊城更新改造的大背景下,再通過重慶市「磁器口傳統街區保護發展規劃」 、 「湖廣會館及東水g 』 1保護性開發建設規劃設計」兩個案例的分析,制訂一草案性質的「歷史街區保護規劃規范」 ,從制度建設角度將歷史街區保護的行為納入規范化的框架內,以實現制度建設對社會經濟發履的巨大推動作用。
  12. Based on the study on the current instance of agricultural environmental quality and safety in chongqing city, we put forward that : make the best of the environmental resources, carry on the layout of agriculture production, and adjust the agricultural structure ; strengthen ecoenvironmental protection and pollution control in the outskirts of the city ; reasonably apply pesticides and fertilizers in order to avoid agriculture products being polluted by them ; strengthen the construction of monitoring system of agricultural environment and agriculture product quality and safety in the whole city, and develop early warning monitoring ; strengthen non - point pollution control in the three gorges reservoir area ; and conduct more researches on controlling of priority pollutants in agricultural environment

    摘要對重慶市農業環境質量安全現狀進行了研究分析,提出了充分利用環境資源比較優勢,進行農業生產布局和農業結構調整;加強城郊區農業生態環境保護和污染的治理;合理施用農藥化肥,防止農產品農藥殘留和硝酸鹽污染;加強全市農業環境與農產品質量安全監測體系建設,開展預警監測;加強三峽庫區農業面源污染防治;進一步開展農業環境優先污染物的控制研究等防治對策。
  13. According to the general layouts of municipal, district ' s and town ' s urban construction and economic development plan, wuxi luoshe key open industrial park is designed in accordance with the principle of continuous economic development with priority to environmental ecology

    無錫洛社重點開放園區根據市、區、鎮城市建設總體規劃和政府經濟發展規劃,按照"整體發展原則、可持續發展原則、環境生態優先原則"進行規劃設計。
  14. Railway construction in the next five years will give priority to southwest china, coal transport, high - speed railways, network expansion and greater mileage of railways opened to traffic

    今後5年中國鐵路建設的總體部署和目標是:決戰西南,強攻煤運,建設高速,擴展路網,增加營業里程數。
  15. The chamber played a major role in shaping and securing approval of the boston municipal harbor plan, which will enable the construction of new hotel, residential, and office space along the water, and provide a major boost to another chamber priority, boston s new convention center

    各中轉地的到達及起飛時間,中轉的航空公司名稱,航班號等.另外,想詢問你處機票價格.最好是從武漢市到boston的聯票,因為這樣可保證國內段行李重量不超標
  16. As the national housing construction policy at current stage, the economic affordable housing aims at enlarging housing supply, regulating investment structure of real estate and starting the effective market requirement with the top policy priority. it is a policy based on the present special real estate market and housing market in china

    經濟適用住宅作為現階段的國家住房建設政策,旨在通過某種政策傾斜,來達到擴大住房供給、調節房地產投資結構和啟動市場有效需求的目的,它是基於我國目前特殊的房地產市場和住房市場發展階段的一種政策選擇。
  17. By the ranking model by similarity to ideal point based on m and n, the criterion of cultivated land can ’ t be used as plant cash crops and the criterion of cultivated land should priority used as plant cash crops and the criterion of cultivated land can ’ t be used as construction land and the criterion of cultivated land should priority used as construction land were confirmed. finally, the evaluation of cultivated land grade, realistic class, and potential class were all demonstrated and the result of cultivated land grade, realistic class, and potential class were all verified in a case study in changsha county changsha city, hunan province. by calculated cultivated land coefficient m and n and confirmed c _ m and c _ n of the ranking model by similarity to ideal point, the result 0. 5032 < c _ m 0. 9931 was confirmed as the criterion of cultivated land should priority used as plant

    最後以湖南省長沙縣作為典型研究區域,實證了耕地等、現實級和潛在級的評價,並分析了其評價結果的可靠性;通過計算耕地經糧系數和建糧系數,及逼近於「理想點」的排序模型中的c _ m和c _ n確定了長沙縣0 . 5032 < c _ m 0 . 9931為耕地應優先用作菜地等經濟作物用途和0 . 0126 c _ m < 0 . 5037為耕地不應用作菜地等經濟作物用途的判別標準;確定了長沙縣0 . 5035 < c _ n 0 . 9937為耕地應優先用作建設用地用途和0 . 0139 c _ n < 0 . 5035為耕地不應用作建設用地用途的判別標準;最後闡明了c _ m 、 c _ n在種植業結構調整、耕地保護和土地管理中的應用價值。
  18. Although chengdu telecom proposes to " make the market the first priority, and to regard the costumers as the ? re of its service operations ", its marketing practice cannot be well coordinated and conducted to satisfy the needs of costumers. the salespersons, market investigation department, advertising department, management department of telecommunication operations, construction department, and maintenance department are self - centered, vvhich cannot take integrate advantages of the company

    盡管成都電信提出了「以市場為龍頭,以用戶為核心」的觀念,但市場營銷職能卻不能圍繞客戶的需求出發通力協調,公司的營銷人員、市場調研、廣告、電信業務管理、建設和維護部門都各自為政,不能體現電信公司的整體優勢。
  19. The construction must give priority to the ecological requirement and enlarge the area and space of greenery patches, in the meantime, to integrate urban and rural areas. after that the whole urban environment would be improved by large - scale forestation activities

    要貫徹「生態效益優先」的原則,大力擴大綠地面積,增加「綠量」 ,實施城鄉一體,聯動發展,拓寬思路,拓展空間,樹立大綠化,建設大生態。
  20. The 4th section was the key section of whole article, and conducted the countermeasure study in the following law fields : engineering payment ensurence surety, legal demand on the available construction project fund, restlessly contradicted right, contract dissolution right, subrogation right, engineering payment compensation priority, the punish rule of engineering payment in arrears, construction industry enterprise law consciousness and law enforcement consciousness and level, so as to solve the problem of engineering payment in arrears in construction field radically

    第四章是本文的重點部分,該章節從工程款支付保證擔保、建設項目資金到位的法定要求、不安抗辯權和合同解除權、代位權、工程款優先受償權、拖欠工程款的處罰規則、建築業企業的法律意識及執法意識和執法水平等方面進行對策性研究,以期從根本上解決建設領域的拖欠工程款問題。
分享友人