probability interval 中文意思是什麼

probability interval 解釋
概率區間
  • probability : n 1 或有;或然性。2 【哲學】蓋然性〈在 certainly 和 doubt 或 posibility 之間〉。3 【數學】幾率,...
  • interval : n 1 (空間方面的)間隔;空隙。2 (時間方面的)間隔,間歇;工間休息,幕間休息。3 【軍事】(各小隊...
  1. Precision and reliability are two contradictory aspects of the theory of interval estimates. to find a confidence interval of prescribed width and prescribed probability is of groat importance in practical applications, arid thereby sequential procedures have to be employed in many cases

    精確度與可靠度是區間估計理論中互相矛盾的兩個方面,尋找同時滿足精確度與可靠度的區間估計在實際應用中具有重要價值。
  2. In the real numbers are chosen in such a way that the probability that the number lies in any particular subinterval of this unit interval is equal to the length of the subinterval

    在實數被選擇,在這種情況下可能性數字謊言在這個單位信號間隔所有特殊子區間與子區間的長度是相等的。
  3. The new ways that solve multiple objectives decision making under risk into probability permanent type : decision making diagram method, matrix analysis method, multiple objectives markov method, the shortest distance method, successive type variation multiple objectives decision making under risk method and fuzzy analysis decision making method. 3. the new modes that solve multiple objectives decision making under risk into probability interval type and uncharted type : weighted method and sorting method 4 the new repent average value criterion that handle multiple objectives decision making under risk into probability uncharted type and generalizing the criterions that have been used into one objective decision making under probability into uncharted type to multiple objectives decision making under probability into uncharted type. 5. giving the error analyses method and decision result regulating method that been used into multiple objectives decision making under risk

    2 、探討了『決策圖法』 、 『矩陣法』 、 『多目標馬爾科夫法』 、 『最小距離法』 、 『連續型變量的多目標風險型決策法』和『模糊分析決策法』等解決概率固定型的多目標風險型決策的新方法。 3 、探討了『加權法』 、 『排序法』兩種解決概率區間型和未知型的多目標風險型決策的方法; 4 、在概率未知型的多目標風險型決策中改進了『後悔值準則』 ,提出了『後悔均值準則』 ;並將單目標概率未知型風險型決策的準則推廣運用到多目標概率未知型的風險型決策中去; 5 、探討了多目標風險型決策方法誤差分析及決策結果值調整的方法。
  4. After analyzing the character of risk, i introduce data mining method into risk management, to solve the contradiction between great capacity of data and lack of information, the methods include mathematics statistics and artificial neural network ( ann ). then, i study on the methods of risk management in risk identification, risk evaluation and risk disposal, what is advanced, fault tree analysis method based on fuzzy probability, stochastic simulation method and the topsis method based on interval number all consider the characteristic of risk. finally, i discussed the application of information system ( mis ) in project risk management, and developed a risk management information system

    論文在深入分析了風險特徵之後,將數據挖掘技術引入風險管理,用以解決海量數據與貧乏信息之間的矛盾,所採用的技術有數理統計和人工神經網路( ann )兩種方法;接著,論文對風險識別、風險評價、風險處理中的風險管理方法進行了研究,所提出的基於模糊概率的故障樹技術、隨機模擬技術和基於區間數的topsis方法都體現了風險管理的特點;最後,論文對信息系統( mis )在工程項目風險管理中的應用進行了探討,開發出一個風險管理信息系統。
  5. A kind of probability sample in which a set interval is applied to a list often population to identity elements included in the sample ( e. g., picking every 10th name )

    一種概率抽樣.以一定的間隔來從人口名單中抽取所需的樣本(如:每隔10個人抽取一次)
  6. In this paper it is proved that there are no scramble sets with nonzero invariant probability measure and especially there are no sequence - distribution - scramble sets with nonzero invariant probability measure in the minimal mappings of a compace metric space and interval mappings with zero topological entropy

    摘要證明緊度量空間的極小映射以及拓撲熵為零的區間映射不存在具有非零不變概率測度的混沌子集,特別不存在具有非零不變概率測度的序列分佈混沌子集。
  7. Then, the confidence interval of future stoch prices based on a certain probability is obtained, and as an application, some risk analyses were conducted

    運用這一結果,給出了一定概率意義下未來股價的置信區間,作出了對實際投資者有一定參考價值的風險分析。
  8. The influences of the signal - to - noise ratio and the integration limit on reverberation times evaluation are weakened, and a minimum statistical standard deviation and 95 % probability confidence interval are obtained

    同時,對比現有其他方法在統計上有最小的估值標準差,其均值的95 %概率置信區間也最小,有效地提高了混響時間的估值精度。
  9. “ for a prediction to be successful, the probability of occurrence in a time interval and a space domain must be specified in advance, as must the lower magnitude

    「一項預測稱之為成功,發生的概率,包括時間的間隔、位置的范圍,以及最低量級,均必須事先明確。
  10. “ for a prediction to be successful, the probability of occurrence in a time interval and a space domain must be specified in advances, as must the lower magnitude

    「對於一項預測作為成功的,預測必須事先明確發生的時間概率的間隔偏差以及空間范圍偏差,以及最低的震級。
  11. By computer sampling the long periodic sequence and estimate the confidence interval, we can conclude the cross correlation value of long periodic sequence is biger than 0. 03 with a probability lower than 10 - 7. this thesis also presents a new quick acquisition method of long periodic non - linear codes used in the satellite navigation and positioning signal ( snps )

    通過計算機采樣數據和區間估計,對于超長偽隨機序列可以以99 . 99的概率確信,在2048相關長度的條件下,長碼的局部互相關值超過0 . 03的概率低於10 ~ ( - 7 )數量級。
分享友人