production bottleneck 中文意思是什麼

production bottleneck 解釋
生產薄弱環節
  • production : n 1 生產,產生;【物理學】(粒子的)生成;製造;(電影的)攝制;(戲劇的)演出;著作。2 產品,製...
  • bottleneck : n. 瓶頸口;(交通易堵塞的)隘道,狹口;〈美國〉(特指生產中的)妨礙進度的因素,薄弱環節。2. vt. 阻礙,限制。3. vi. 交通堵塞。4. adj. (街道等)狹隘的。
  1. After the bottleneck in the original ethene production plant is analyzed, the revamp design plan for srt - iii cracking furnace is proposed. the measuring results after revampment show that the thermal efficiency and ethene recovery ratio are increased compared with the design data ; the production capacity of ethene cracking furnace is enhanced, and energy consumption is reducted

    通過分析原乙烯裝置生產存在的「瓶頸」 ,提出了srt -型裂解爐改造的設計方案,並對改造後效果進行測量,熱效率和乙烯收率均比設計值有所提高,乙烯裂解爐的生產能力提高了,能耗降低了。
  2. Conclusions show the post and telecommunications " inductivity is least which means this industry is most likely a bottleneck to nation economy ; analysis of the production inducing coefficient shows that the post and telecommunications is a consumption - relying industry ; the change of production value of post and telecommunications spreads most to the second industry, then the tertiary industry, the primary industry ; the change of price of post and telecommunications spread most to the tertiary industry, then the secondary industry, the primary industry

    得出郵電業感應度系數最小,其瓶頸地位最突出;對生產誘發系數的分析得出郵電業是消費依賴型產業;郵電業的產值增長,對第二產業的產值波及程度最強,其次是第三產業,第一產業;郵電業價格的變化對第三產業的價格波及程度最大,其次是第二產業,第一產業。見第五章。
  3. The content of this paper came from the renovation project of the proportioning system of no. 3 blast furnace in hefei steel & iron co. the former proportioning system became the bottleneck of the iron production due to the aging equipment and the low - level automation

    本論文的工作內容來自合鋼3 #高爐槽下配料控制系統改造工程。合鋼3 #高爐原有配料系統由於設備陳舊,自動化水平較低,已成為高爐煉鐵的瓶頸。
  4. Plant bottleneck analysis and execute equipment evaluation and updated plan, optimize productivity and production capacity

    工廠瓶頸分析,執行設備評估和更新計劃,優化生產效率和提高生產能力。
  5. Sheet metal process planning is an important activity to connect the design and manufacture of sheet metal part. however, the developing level of sheet metal process planning is far behind of others, and it is characterized as a bottleneck of production

    鈑金工藝設計是連接鈑金設計和製造的重要環節,但鈑金工藝設計水平卻遠遠落後于其設計和製造水平,成為制約鈑金生產效率提高的「瓶頸」 。
  6. During the production process, some production links with weak capacity will become a bottleneck to obstruct the full utilization of the other links

    摘要在產品的製造過程中,如果某些生產環節能力過于薄弱,將會形成瓶頸效應,阻礙其他部分生產能力的充分利用。
  7. Bottleneck restraints for economic and social development brought by infrastructure and basic industries have by and large been removed ; capability of energy production, transportation and communication have improved greatly

    第四,基礎設施、基礎工業對經濟社會發展的瓶頸制約基本解除,能源生產能力、交通運輸能力、通信能力大幅度提高。
  8. Due to the production bottleneck resulting from the global shortage of raw materials and customers requirements, the manufacturing lead time is shortened and peak production season is condensed to two to three months, mainly between august and october

    由於全球原料短缺,導致生產工序出現樽頸,加上客戶訂貨期縮短,使旺季集中於八月至十月間,生產間期較前更短。
  9. On the basis of comparing and analyzing dominating production planning and control approaches, an integrated production planning approach combining network planning and theory of constraints is put forward. and then, some key problems with the approach were studied, such as equipment resources assigned, bottleneck identified, selection of the operation priority rules, and optimization algorithm base on theory of constraints

    然後,在比較與分析了當前主要幾種生產計劃與控制方法的基礎上,提出了一種基於網路計劃與約束理論集成的模具生產計劃與管理的方法,並重點研究了網路計劃與約束理論集成方法的資源分配、瓶頸資源識別、工序優先級別選擇以及基於約束理論的優化演算法等問題。
  10. The problem of assembly sequence planning ( asp ) is a kind of np optimization problems, so it is very difficult to find an assembly sequence which can achieve the assembly request. therefore, assembly sequence planning had been becoming the bottleneck of reducing the cost and shortening the production time of a product

    裝配序列規劃問題本質上是一個np組合優化難題( nondeterministicpolynomialproblem ) ,因此很難得到一個滿足裝配要求的裝配序列,從而使裝配序列規劃成為提高產品精度、降低生產周期及成本的瓶頸環節。
  11. Analyse production, material, capacity, bottleneck problems which concern with sales plan achievement through information platform. submit solutions to the management

    2應用信息技術平臺分析公司在實現銷售目標方面存在的諸如生產,物流,產能,設備瓶頸方面存在的問題。並向管理層提出解決方案。
  12. Also the commencement of the group s third glass yarn furnace eases the bottleneck in its glass epoxy laminate production

    隨著集團第三個玻璃絲爐的投產,亦緩解了集團玻璃纖維覆銅面板的生產瓶頸。
  13. Chapter 2 is the model building and anglicizing of the financial structure. this chapter mainly discussed the system idea, the production models and the bottleneck effects of the financial structure, and then indicated the factors affecting the financial structure

    並比較英美和日德兩種模式的區別和聯系,進而指出我國融資模式的現實選擇;第五章主要指出我國融資系統瓶頸拓展的制度安排與路徑依賴。
  14. A schedule of sfc based on bottleneck working procedure and a dynamic dispatching strategy are also given in this chapter. in the 6th chapter, a product configuration design system and a flexible production management system are described. the two systems " architecture characters and main modules are introduced, partly realized the idea of integrated information management system which is oriented to mc

    第六章介紹了在本文理論研究的基礎上,開發的產品配置設計應用系統和柔性生產管理浙江大學博士學位論文:面向大批量定製的敏捷產品配置與柔性生產控制的研究系統,介紹了系統的結構特點和主要模塊的功能,部分實現了關于面向mc的集成信息管理系統的構想,驗證了本文理論的有效性。