program alternatives 中文意思是什麼

program alternatives 解釋
方案抉擇
  1. In order to solve the problem of engineering roadblock of abnormity wall template design, program alternatives, construction techniques and engineering roadblock, this paper discusses the difficulty of hyperbola template construction on the innovation of traditional simple curve zoom type huge template by combining the three dimensional space hyperbola rinse concrete wall in art performance theater of qingdao art center project construction, provides a method to design and choose heteromorphy component template

    摘要為了解決異形墻體模板設計、方案選擇及施工工藝等技術難題,筆者結合青島市藝術中心工程藝術表演劇場三維空間雙曲線清水砼墻施工,在傳統的單曲線可調式大模板的基礎上進行了創新,很好的解決了雙曲線模板施工的技術難點,為異型構件模板的設計、選擇開拓了又一條思路。
  2. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一節制閘(而岸丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入水源地的截污工程; ( 2 )引水工程:是截污工程的配套工程,利用下游長蕩湖來補充水量,並對3個引水工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略水源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  3. The method ' s nature is to combine the construction experience with the net work program and in the priority of construction starting and make the alternatives that are possible to influence the finish time, providing a flexible technical preparation for adjusting errors actively later, which will supply a new measurement and insure both the rate of production and timing target accomplishment

    該方法的實質是將施工經驗與網路技術相結合,對可能影響工期的工程,做出盡可能多的施工方案和計劃,在施工方案的編制階段為以後的方案調整、動態監控和調整偏差提供了行之有效的技術準備,為動態施工網路計劃應用在土建工程中,確保進度、工期目標的實現提供新的手段與方法。
分享友人