project after completion 中文意思是什麼

project after completion 解釋
峻工項目
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  • after : adv 在後;繼后;后來。 follow after 跟著。 look before and after 瞻前顧后,前思後想。 soon after ...
  • completion : n. 1. 成就,完成,實現;【數學】求全法。2. 期滿;畢業。
  1. “ before - and - after ” test an analysis of a country or region before and after the completion of a project

    「事前事後」試驗指在一個項目完成之前和完成之後,對一個國家或地區所作的分析。
  2. The center, a 80 - storey high commercial building and one of the landmarks of hong kong, built after the completion of the queen s road central jubilee street project

    在皇后大道中租庇利街重建計劃中建成樓高80層的商業大廈中環中心,這幢建築物是香港其中一個地方標志
  3. After two years of test running the multi project management paradigm factory wide, significant performance improvement is observed across multiple projects with aggregated investment capital amounting to over 300 million yuan. the project mission is accomplished successfully, which is in sharp contrast to the past failures in different aspects including project deadline completion, budget, and other performance measures

    該廠通過這種多項目管理模式的兩年多的試行,已在投資總額超過3億元的多個技改項目和其他項目管理中收到了成效,在工期、資金、效果等方面一掃過去的積弊,較好地完成了企業技改任務總目標。
  4. The three gorges hydropower and water conoervancy project is the largest hydropower station in the world after completion of gezhouba hydropower station on the changjiangriver

    摘要三峽水利樞紐是繼葛洲壩水利樞紐建成后在長江上修建的世界第一大水電站,規模宏大,舉世矚目,具有巨大的防洪、發電、航運等綜合效益,是開發治理長江的骨幹工程。
  5. Auxiliary material will be supplied from domestic and overseas markets ; basic material will be supplied from domestic market in short period, in the long period it will be supplied by our factory after completion of the project of 6, 000t y tyre cord fabric

    原料供應:附屬原料由國內外市場供應,骨架材料近期由國內市場供應,將來由公司6000t y簾子線改擴建項目供應。
  6. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底水庫運用后水沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  7. Ningxiang county long tianfan the industry limited company is located within the boundaries of the beautiful and rich hunan province ningxiang county, the first period project area approximately 28000 square meters, have the fixed asset 2800 ten thousand yuan, the staff 200 people, the year productivity 240 tons ; the second phased project completion year after next productivity will amount to 500 - 600 ton

    寧鄉縣龍田釩業有限公司位於美麗富饒的湖南省寧鄉縣境內,首期工程佔地面積約28000平方米,擁有固定資產2800餘萬元,職工200餘人,年生產能力240噸;二期工程竣工後年生產能力達500 - 600噸。
  8. Article 7 after the completion of the engineering project, the owners shall submit all the explanatory data, such as the route chart and position chart of the submarine cables and pipelines, to the competent authorities for the record, and send duplicates to the harbour superintendence organs

    第七條鋪設施工完畢后,所有者應當將海底電纜、管道的路線圖、位置表等說明資料報送主管機關備案,並抄送港監機關。
  9. After the completion of the project, tbg brand tracking, according to the need for the extension of product design, and maintain the unity of brand and brand style visual chain integrity

    項目完成後,英特百奇進行品牌跟蹤,根據需要提供產品的延伸設計,保持品牌風格的統一性及品牌視覺鏈的完整。
  10. The estimating method of the power tariff for new hydropower project is counter - derived on the basis of loan principle and interest repayment during the loan repayment and then calculated based on meeting the needs of the base benefit rate of power industry after the completion of loan repayment ; or is estimated based on the rise trend of power tariff in the power network and the user " s affording capacity ; or is estimated by the marginal cost method ; or is estimated by adopting the rational financial profit rate

    水電建設項目上網電價的測算主要有以下幾種方法:還貸期間按歸還貸款本息反推,還清貸款后按滿足本行業基準收益率測算;根據電網電價的上漲趨勢及用戶的承受能力測算;採用邊際成本法測算;採用合理的資金利潤率測算。
  11. After completion of th ecivil work of the projexts, the water, power, gas, and telecommunication departments shall ensure to supply water, power. gas and telecommunication services in 15 days so long as the project sites are within the services areas

    項目工程竣工后,只要是在城網服務范圍內的,供水、供電、供氣、電信單位要確保十五日內實現通水(電、氣、話) 。
  12. How to guarantee the adequate finance to be put into the project timely is of vital importance to the smooth progress of the project and the operation after its completion

    如何確保資金籌措到位,將直接關繫到工程建設的順利進展及其建成后的投產運營。
  13. After project completion, execute building routine check on leakage and so on to find out hidden dangers and other problems and properly solve in time

    建設竣工后執行日常檢查如防水等等,發現潛在危險及其它問題並及時解決問題。
  14. The contractor agrees to redo the part of the project which did not conformto the drawings ' ecification with other projects performed / done meanwhile, remedy defects caused by / result from / arise from faulty materials and workma hip which are proved by evidence in one year after the completion of the project

    承包商同意對不符合圖紙規格的工程部分進行返工,並保證工程進行,同意完工一年後對有證據證明因瑕疵材料或工藝造成的缺陷進行補救。
  15. The contractor agree to redo the part of the project which are not conformed to the drawings ' ecification with the other projects performed / done meanwhile, remedy defects caused by / result from / arise from faulty materials and workma hip which are proved by evidence in one year after the completion of the project

    承包商同意對不符合圖紙規格的工程部分進行返工,並保證工程進行,同意完工一年後對有證據證明因瑕疵材料或工藝造成的缺陷進行補救。
  16. The grand millennium plaza, comprising two commercial office towers, built after the completion of the wing lok street queen s road central project

    在永樂街皇后大道中重建計劃中建成的新紀元廣場,共有兩幢商業辦公室大樓
  17. Introduction positional cloning of disease genes and research of protome become very important in the post - genome period after completion of human genome project ( hgp ). positional cloning is a new mean with the developing of hgp

    前言人類基因組計劃的測序工作完成之後,已進入后基因組學階段,疾病基因的定位克隆及其蛋白質功能研究已成為研究的重要內容。
  18. The emptying tunnel of the shuibuya project will be used for both the diversion during late construction and the emptying of the reservoir for maintenance after completion of the dam

    摘要水布埡樞紐放空洞主要承擔水布埡工程施工期後期導流及完建后大?檢修時放空水庫的任務。
  19. After completion of the project loan appraisal report, the appraisal & advisory department should conscientiously review the appraisal report, and submit to the credit management department and the credit policy committee in the form of departmental documents ; the credit management department will checkup and approve the loan according to the appraisal report and other data

    四、審查審批項目貸款評估報告完成後,評估咨詢部門要認真審查評估報告,並以部門文件的形式提交信貸管理部門和信貸政策委員會;信貸管理部門依據評估報告等資料進行貸款的審查審批。
  20. Such insurance expenses shall be borne by party b prior to the completion of the construction of this project, and shall be included in the project investment ; and shall be included in the costs and expenses for the operation of this project after this project is completed and turned over to party a for operation

    該保險費,在本項目建設完成之前由乙方承擔,並計入乙方對本項目投資;在本項目建設完成並交由甲方運營之後,計入本項目的運營成本及費用。
分享友人