project analysis and control 中文意思是什麼

project analysis and control 解釋
項目分析及控制
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  • analysis : n. (pl. -ses )1. 分解,分析;【數學】解析。2. 梗概,要略。3. 〈美國〉用精神分析法治療(= psychoanalysis)。
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  1. Hydraulic control system of double - cylinder vessel gate is a sort of typical electrohydraulic proportional control system0 in order to study electrohydraulic flux control characteristics of this system, i have analyzed the principle of this hydraulic control system, and made its mathematics model ? in double - cylinder hydraulic system, it is necessary to process electric synchronous control in this hydraulic system, this paper also introduces a sort of fnn ameliorated from the point of view of intelligent control theory, and clarifies the principle of applying that network to achieve synchronous controlo at the same time, the means of fuzzy configuration analysis is used for network training, the comparative experiments make known that the method of applying fnn to realize synchronization control is feasible, furthermore, its effect is better than others0 this paper puts forward that a distributed control system can be used to monitor and control vessel gate within a real - time or remote distance, the basic project, structure, applications and functions of computerized scada system in hydraulic system of vessel gate is introduced ? a double layer network structure, epigynous and hypogynous machine network, is applied to this system, in accord with the application of technique such as plc, integrated software etc, this paper introduces the methods and application to achieve the computerized scada system in the task, and analyzes the characteristic of this system, in this paper, the application of configuration in monitor and control system of vessel gate is discussedo in addition, in accord with the application of technique such as visual basicb

    雙缸船閘液壓啟閉控制系統要求解決同步控制問題,文中從智能控制理論角度出發,採用了一種改進的模糊神經網路,結合模糊聚類分析方法,闡述了應用該網路實現同步控制的原理。通過對比模擬實驗表明:應用模糊補經網路實現同步控制是可行的,而且它的同步控制效果要優于傳統的設置主從令缸控制方法,具有良好的魯棒性能。另外,本文提出了建立船閘控制系統的分散式控制系統,介紹了船閘液壓控制系統的計算機監控系統( scada )的方案、結構、應用和主要功能,採用雙層網路化結構:上位機網路和下位機網路,並結合plc通信網路技術和組態軟體等技術構成的計算機監控系統的實現方法,實際應用,分析了這種較新的系統模式在船閘液壓控制系統的計算機監控系統的功能實現中所具有的特點。
  2. On the basis of research on pumping station in changzhi iron and steel limited group company and analysis and research on the basic capability of industry control computer plc and state view software, this article adopt the systems analysis method to establish the frame of pumping station supervisory system based on " king view ", and propose the project to develop the distributed control system of pumping station ( ipc + plc ) using " king view " as supervisory software and siemens s7 - 200 as hypogynous machine

    在對長治鋼鐵公司泵站進行調研,對工業控制計算機可編程序控制器及組態王監控軟體基本性能特點進行充分分析和研究的基礎上,本文以系統分析的方法,構建了基於「組態王」的泵站監測系統框架,提出了以「組態王」為監控軟體,可編程序控制器( plc )採用西門子s7 ? 200系列做為下位機的泵站分散式控制系統? ? ( ipc + plc系統)方案。
  3. The strategy included the principle and selects of dcs controlling system project, force analysis and calculation of the pectination slides, the design of hard ware and software, anti - interference design of hard ware and software, selects of plc and transformer, and system control design of intellectual simulative modulated plate, etc. and also analyzed the extension and reliability and economic ability of the pectination slides synchronism controlling system

    包括該同步控制系統控制方案的選取、控制系統的原理、梳式滑道絞車的受力分析和計算、同步控制系統的plc設備和程式控制系統傳感器等硬體的選型、程式控制系統的硬軟體設計,程式控制系統的軟體抗干擾設計和智能調度模擬控制系統設計等。並對整個系統的擴展及系統可靠性和經濟性進行了分析。
  4. Education in china has since a long time ago regarded the teaching - studying process simply as a process of understanding, overlooking the emotional activities along with it, and, effect of teaching activities is greatly weakened as a result. directed against this, we put forward a project of reach and control on the goal of etmotional field in studying of chemical course of secondary school students, which is based on roger ' s theory of non - guided teaching and bloom ' s theory about goal of emotional education, taking into account our investigation and analysis on emotional problems in chemical course studying of students from several secondary schools of changsha of different levels

    國內教育長期以來把教學過程簡單地看作一種認知過程,忽視了伴隨其間的情感活動,從而在很大程度上削弱了教學活動的效果。本文即針對這種狀況,根據布盧姆關于教學過程中情感教育目標的理論以及羅斯傑關于「非指導性教學」等理論,結合對長沙市不同層次的幾所中學的學生化學學習情感問題的調查分析,探討了目前中學生化學學習情感領域教育目標的達成與調控問題。
  5. The study work in the dissertation is an important part of the tenth five - year defence advanced research project of “ study on control technology of the machining distortion for complex structure parts ” supported by pla general armament department of china. theoretical analysis and experimental study are carried out on the initial residual stresses and their effects on milling distortion for thick aero - aluminum - alloy plate

    本文作為總裝備部「十五」預研項目「復雜結構件加工變形控制技術研究」的主要組成部分,以航空鋁合金厚板為對象,研究重點定位在其初始殘余應力分佈規律及其對數控銑削加工變形的影響。
  6. Analysis and evaluation of effect of tuberculosis control project implemented in juchao district of chaohu city

    2005年結核病控制項目實施效果分析
  7. Analysis and control of project cost of construction enterprise

    建築施工企業項目成本控制分析
  8. The following five aspects must be done well for the elaborating management : ( 1 ) the preceding preparation before project design, ( 2 ) the continious management and technical risk analysis, ( 3 ) the communication in time, ( 4 ) the strict control and monitoring, and ( 5 ) the analysis and sum - up

    要做好工程項目設計的精細化管理,必須做好五個方面的工作:精心的設計前期準備;持續的管理及技術風險分析;充分及時的溝通;嚴格的過程監控;認真的分析總結。
  9. And secondly target and methods about quality control to construction project, have the affect factor " 4m1e " to quality variation under analysis and control, that quality to be influenced, seven kinds of means and tools of mathematical statistics to control quality and basic work need to do

    接著對施工項目質量控制的依據、目標和方法,影響質量變異的「 4m1e 」因素的分析和控制、數理統計控制質量的七種工具和方法、需做的質量基礎工作等作了全面的論述。
  10. These simulations include the stability analysis, and dynamic variety while the influent and the feedback coefficient are variety. 5. an auto - control system project used in wastewater treatment plant based on ethernet and plc is introduced ; and for the pumping station, using dynamic programming ideology, builds a model with the least running - time optimization goal, and introduces the software realization using plc

    以作者負責的一個項目為例,詳細的介紹了如何基於工業以太網和plc實現污水處理廠的全廠實時自動監控系統;同時,對污水處理廠的重要環節?污水泵站,應用動態規劃思想,建立以泵組使用時間最短為優化目標的數學模型,並介紹了該模型基於plc的軟體實現。
  11. Combined with the existing problems of the national key project - linhuaigang flood - control project, this paper systematically studied the theories of sluice structures design foundation model modern calculation methods of both plane and spatial sluice structures ; at the same time, static and dynamic analysis of he spatial structure of the jiang tang lake ' s flood - entry sluice was studied using the finite element method

    本論文結合國家重點水利工程臨淮崗洪水控制工程中遇到的實際問題,系統地研究了水閘結構的設計理論、地基模型、平面和空間水閘結構的現代計算方法;並對姜塘湖進洪閘空間結構進行了有限元靜動力計算分析。
  12. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  13. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對水工大體積混凝土溫控問題進行了分析和總結,結合青居水電站閘壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。
  14. Mechanics analysis and safety control of the strutting system in the process of the construction of steel roof truss in national gymnasium project

    國家體育館鋼屋架施工過程中支撐體系的受力分析與安全監控
  15. Study several important jobs at the preparatory stages of construction, put forward the mutual relation on time limit for a project, quality, cost control and carry on overall analysis to these, go on deep introspection to relevant questions at the same time

    研究了施工準備期的幾項重要工作、提出了施工過程管理中工期、質量、成本控制和安全管理的相互關系,並對這幾個方面的管理工作進行了全面的剖析,同時對有關的問題進行了深刻的反思。
  16. In the paper, through the example of the waiting hall of xt an international airport, several main questions meet in the design have been discussed, analyzed and solved, which include in negative friction force around pile in collapsible loess, the calculating method of bearing capacity of pile. the crack control methods of analysis and design in the super - length reinforced structure have been tested in the project, and reached the effect to be hoped

    本文通過西安咸陽國際機場新航站樓工程設計的具體實例,分析、論述了建築結構在設計中遇到並解決的幾個主要問題:如自重濕陷性黃土場地樁基負摩阻力問題;淺層土雖經強夯但下層土仍有可能產生負摩阻力時樁的承載力計算方法;對鋼筋混凝土結構的裂縫控制實現超長設計的分析和設計對策,經過工程驗證,達到了預期的效果。
  17. This project name is " basic technique research and vibration isolation theory with bionic mechanism for devices of high precision ". this thesis is mainly in two aspects : theoretical analysis and experimental research. it is composed of the characteristic of power transmission based on the smr model, control theory of vibration isolation for micro - manufacturing platform

    本學位論文結合國家自然科學基金項目「精密裝置仿生隔振系統理論及基礎技術研究」 ( no . 50075078 ) ,從理論分析和實驗研究兩方面,對smr模型的功率傳遞特性、微製造隔振平臺控制理論和主動振動控制技術進行了深入、系統的研究。
  18. It analyses institutions consummating, claim management in the stage of project bidding ( such as investigating jobsite, studying bidding documents and contract negotiation ) and construction in ar company. by studying a claim case of h hydropower plant of ar company, it states the features of claim management of hydro electrical project and comments its advantages and disadvantages in claim management, pointing out that claim management is in the starting stage in ar company which details insufficient knowledge on claim, weakness in market risks and claim consciousness, claim analysis and control system is not perfect, lack of professional person in claim and internal information flow is not smooth

    論文分析了ar公司各項制度建設情況、工程投標階段索賠管理情況(如勘察施工現場、研究招標文件及合同談判等)及工程實施階段索賠管理情況,通過ar公司h水電站索賠管理案例分析,闡述了公司水利水電工程索賠管理的特點,其索賠管理現狀具體表現為:對索賠認識不足、市場風險及索賠意識不強,索賠分析與控制體系不完善、缺乏索賠專業人才以及內部管理信息流通不暢。
  19. This article is on the it hardware product project risk analysis and research, considering its particularity, put the project risk management divides into 4 processes : risk planning, risk analysis, risk settlement and risk control. also introduce the application of the methods and tools in every process. lastly, analyze polycom conference call ( soundstation2 basic ) product

    本文將整個項目風險管理過程可分為風險計劃、風險分析、風險評估和應對以及風險監控四個環節,對項目風險管理的整個過程進行全面系統的分析和研究,最後使用層次分析法( ahp )對寶利通會議電話項目進行了具體的項目風險管理過程的研究。
  20. In this thesis, study on engineering project administration method reform, applying scientific administration and engineering specialty theory knowledge under the guidance of modern project administration theory and strategy, a useful investigation and research on engineering project administration method reform is set off. the analysis and research is mainly focused on organizational structure guarantee as well as administrative method reform and technical measure improving for three great goal ( quality, cost and progress ) control in engineering project administration. the organizational structure selection scheme which aims to geo - engineering project administration as well as systematic and whole progress administration theory method and technical way of engineering project quality, cost, progress is presented

    《工程項目管理方法改革研究》一文在現代項目管理理論和方法的指導下,運用科學管理與工程專業理論知識,對工程項目管理方法改革展開了有益的探索和研究,著重分析研究工程項目管理在組織機構保障方面及三大目標控制(質量、成本和進度)方面的管理方法改革和技術措施改進,提出了適宜於地學工程項目管理的組織結構選擇方案和工程項目質量、成本和進度的系統化全過程管理理論方法和技術途徑。
分享友人