proposal stage 中文意思是什麼

proposal stage 解釋
建議階段
  • proposal : n. 1. 申請;提議,建議;提案。2. 求婚。3. 〈美國〉投標。
  • stage : n 1 講臺;舞臺;戲院,劇場;〈the stage〉戲劇,戲劇藝術;戲劇文學;〈the stage〉戲劇業;劇壇。2 ...
  1. The jpm endorsed the proposal and the stage was set for a formal agreement to be signed between the two districts during the district installation on 6 july 2001 in hong kong

    戴甫靈社長在五月份的扶輪月刊中一再呼籲大家要不斷引介有新視野而又充滿活力的新會員。
  2. The proposal has not yet passed the discussion stage.

    這個提案還沒有通過討論階段。
  3. Based on the project scale argumentation of letan hydropower station, the paper briefly introduces the main results of scheme ' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee ; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of letan hydropower station

    摘要通過樂灘水電站工程規模論證,簡述該工程正常蓄水位選擇和裝機容量選擇設計階段方案技術經濟比較的主要成果、取捨方案的主要因素、以及項目建議書評估會專家組的評估意見;並根據樂灘水電站工程規模設計論證總結類似工程規模論證時的主要技術要點。
  4. Mr yam added that, since the proposal was still at a very preliminary stage, the exact details of the trial runs would need to be worked out once the decision to proceed had been taken

    任志剛補充,由於建議仍處于很初步的階段,試行的具體細節需要在作出有關決定后擬定。
  5. If successful, the fund, which is still at the proposal stage, will be the country ' s first gold investment fund

    目前尚處于建議階段的這項基金,倘若得以成功設立,將成為中國歷史上首次推出的黃金投資基金。
  6. Chongqing expressway networking toll data communication network cotains 2 - ring and 8 - ray network structure based on expressway physical structure, setting up a trasmission trunk layer of sdh stm - 4 ( can be up - graded to stm - 16 ), and channel protection business entry layer consisting of sdh onu / olt stm - 1 ( can be up - graded to stm - 4 ). data exchange layer, through ip route exchange network above sdh network, forms 3 - level computer network structure of account settlement center - road section management company - toll station. to ensure obtaining original and reliable toll data from communication network, 2m circuitous chain is established between each toll station, accountsettlement center and road section management company, and also pstn dialing backup chain is set up between toll station and account settlement center. in order to maintain clock synchronization of the whole communication network, a proposal of sub - stage clock sychrononization signal network for differet network construction scale has been put forward in this design. in view of sensitivity and importance of toll data, this design particularly gives considerations of network safety and information safety for external and internel of network. therefore, communication safety, smoothness and reliability of networking toll system can be able to maintained in many ways

    重慶高速公路聯網收費數據通信網的結構是根據高速公路的物理結構構築了2環8射的網狀結構,建立了以sdhstm - 4 (可升級到stm - 16 )的傳輸主幹層,以sdhonu / oltstm - 1 (可升級到stm - 4 )組成的通道保護業務接入層。數據的交換層是在sdh網之上的ip路由交換網,形成了結算中心-路段管理公司-收費站之間的3級計算機網路結構。為從通信網路上保證收費數據的原始性和可靠性,每個收費站和結算中心、路段管理公司之間建立了2m迂迴鏈路,同時在收費站和結算中心之間建立了pstn的撥號備份鏈路。
  7. Centro digital pictures collected the award for helping sell the hong kong airport authoritys vision of the new international airport at chek lap kok, as well as visualizing the beijing olympic bid committees proposal to stage the 2000 olympiad

    先濤數碼影像有限公司獲得此榮譽是實至名歸的,它曾在赤立角新國際機場把香港機場集團最新的機場發展理念拍成短片廣為宣傳,而且還見證了北京申奧組委會申請主辦2000年奧林匹克運動會的重大壯舉
  8. The sustainability assessment should be conducted at the early planning stage of a proposal

    可持續發展評估應在建議的策劃初期階段進行。
  9. These responsibilities are broad in scope and require process evaluations / improvements / optimization, and diagnostic engineering for all company products, processes of new projects, retrofits and technical services. this planning starts during the proposal stage and continues through the performance tests

    負責面廣並要求對公司所有產品,新工藝,更新和技術服務進行分析診斷,工藝評估/改進/最優化,計劃起始於投標階段並持續至性能測試。
  10. Engaged in earlier stage work of chemical construction project, project planning, monographic study, post evaluation of construction project, consultion work for enterprise how to build iso9000 quality system, drawing up and assessing the project proposal, feasibility study report

    從事化工建設項目前期工作,項目策劃,項目建議書,可行性研究報告的編制和評估;專題研究;項目后評價;以及企業建立iso9000質量體系咨詢工作。
  11. Establish project cost estimation budget acquire from the proposal stage

    在項目籌劃階段建立項目費用評估預算。
  12. " this proposal has emerged during a value engineering study at the detailed design stage and has now been submitted to the government

    九鐵公司是在詳細設計期間進行一項價值工程研究后而提出上述建議。
  13. At the first stage, youths are invited to submit a proposal to outline the concept and production plan

    第一階段會邀請各位青年人提交計劃書,勾劃製作概念及計劃。
分享友人