pulverized coal furnace 中文意思是什麼

pulverized coal furnace 解釋
粉煤加熱的爐子
  • pulverized : 霧化的,粉末狀的
  • coal : n 1 煤,煤塊,煤堆。2 〈pl 〉〈美國〉(一堆)燒紅的煤。3 〈常 pl 〉〈英國〉(幾塊)供燃燒的煤。4 ...
  • furnace : n. 1. 爐子;熔爐;高爐。2. 極熱的地方。3. 磨煉;艱難。vt. 在爐中燒熱(金屬)。
  1. Study on pulverized coal particle size of blast furnace pci

    高爐噴吹用煤粉粒度的研究
  2. Its current products include : top oscillation electrical precipitator, side electrical oscillation precipitator, magnetism controlled static electricity precipitator, wet electrical precipitator, honeycomb electric catching tar instrument, high - pressur silicon rectifier equipment and plc low - pressure controlling system, blast furnace gas impulse precipitator, high concentration pulverized coal collector, coke oven and boiler flue gas low pressure impulse precipitator, blower fan inhaler, crossing piping gas cooler, high temperature fume cooler, gyre - orientation impulse hop - pocker and all sorts of molded sections

    目前主要產品有:頂部振打臥式電除塵器、側部振打電除塵器、磁控靜電除塵器、濕式電除塵器、蜂窩電捕焦油器、高壓硅整流裝置及plc低壓控制系統、高爐煤氣脈沖除塵器、高濃度煤粉收集器、焦爐及鍋爐煙氣用低壓脈沖除塵器、風機空氣過濾器、橫管式煤氣冷卻器、高溫煙氣冷卻器、回轉定位脈沖大布袋及加工各種冷彎型鋼。
  3. Transformation of additional combustion of blast furnace gas of pulverized - coal fired boiler in a heat power plant

    鍋爐摻燒高爐煤氣的汽溫調節
  4. Technical measures for changing 200 t h pulverized - coal fired boiler to blast furnace gas - fired boiler

    煤粉鍋爐改造為全燒高燒煤氣鍋爐及其經濟效益
  5. Transformation of the 130t h pulverized - coal fired boiler to the all blast furnace gas fired boiler and the economic benefit

    高爐煤氣混燃在軋鋼加熱爐上的開發應用
  6. Experimental study on effects of pulverized coal staging on in - furnace combustion process

    煤粉分級燃燒對爐內燃燒過程影響的試驗研究
  7. Abstract : coke saving measures in the recent , years at pangang are summarized according to various ways of beneficiated materials , high blast temperature , oxygen - enriched blast , pulverized coal injection rate and improvement of blast furnace operation , the effect of related smelting factors on coke rate is investigated in combination with the production data and moreover further measures for reduction of coke rate are proposed

    文摘:從精料、風溫、富氧和噴煤量以及改善高爐操作等方面總結了攀鋼近幾年來採取的節焦措施,並結合生產數據分析了有關冶煉因素對焦比的影響,同時提出了進一步降低焦比的措施。
  8. Problems and technical transformation of 75t h boiler using pulverized coal and blast furnace gas

    電廠煤粉鍋爐增燒高爐煤氣改造
  9. Influence of pulverized coal combustion boiler adding blast furnace gas on coal complete combustion

    煤粉鍋爐改造為純燒高爐煤氣的技術措施
  10. Guide on selection of furnace characteristic parameters for large pulverized coal fired power boilers

    大容量煤粉燃燒鍋爐爐膛選型導則
  11. Abstract : the initial position and velocity of pulverized coal at oxygen - coal lance outlet has been proposed, thus injection of pulverized coal in the blast furnace can be simulated

    文摘:給出了氧煤槍出口處煤粉顆粒初始位置和初始速度的分佈,從而為高爐煤粉噴吹的數值模擬打下了基礎
  12. This paper computes the burnout - time of pulverized coal and experiment in one - dimenion thermal furnace, concludes that the relation between residing - time in burnout zone and size of pulverized coal in the circumstance of the higher burnout efficiency

    摘要通過對超細煤粉燃盡時間的計算和熱態爐實驗的研究,在保持煤粉高燃盡率的同時,確定了再燃燃料在燃盡區的停留時間和煤粉粒度的關系。
  13. Abstract : to realize pulverized coal injection for smelting blast furnace femn, the technical difficulties are analysed on chinese large injection value of pulverized coal for blast furnace femn using advanced experiences in all over the world, the feasibility and appropriate measures are also probed into

    文摘:為了早日實現高爐冶煉錳鐵噴煤,借鑒國內外高爐噴煤的先進經驗,分析了中國錳鐵高爐大噴煤量的技術難點,對錳鐵高爐大噴煤的可行性及相應措施進行了探討。
分享友人