put into power 中文意思是什麼

put into power 解釋
使執政, 使上臺
  • put : vt 1 擱,放,安,擺;放進,加入,攙進 (to in)。 put milk to tea 加牛奶在茶里。 put a saddle on ...
  • into :
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  1. Technique of transmitting data via power line ( pl ) , a new technique developed in recent years , is used to automatize the free collecting system in public service and the management of uptown service 。 this article discussed the advantage , disadvantage and the current state of the power line carrier communication 。 the advantage , method and current state of using spread spectrum technique in power line communication are discussed 。 then the characteristic of low voltage power network was also compendious analyzed 。 in this paper , after introducing the principle of ssc , design of hardware and software of the system are been discussed 。 this system has been put into use , the result has proved its high stability and reliability

    本文研究旨在提供一種利用低壓電力供電網路、低成本、高可靠地實現公共事業收費自動化和小區物業管理智能化的技術應用。討論了電力線載波通信的優、缺點及現狀,擴頻技術在電力線載波通信應用的優點、方式和現狀,並對低壓電力線網路的特性進行了簡單的分析。在闡述了擴頻通信的基本原理的基礎上,本文詳細地介紹了電力載波遠程抄表系統的具體實現,包括硬體模塊和管理軟體本系統已投入運行,具有較高的穩定性和可靠性。
  2. Along with the a enhancing proportion of hydroelectricity in the whole electricity system in our country, the increase of the single unit capacity, the faults ratio of the large - scale hydropower units is more and more important to the whole system safe operation, if we do n ' t manage it well, it will cause the collapse of the whole system and bring a great loss of country ' s economy, hi addition, accompany with " to dispart plant and grid, connect to the grid according to the price " put into practice, how to control the production cost of the power plant has to be put into consideration

    隨著我國水電在系統中所佔比重的增加及單機容量的增大,大型水電站和機組的故障率對系統的安全運行也越來越重要,如果處理不好,甚至會引起整個系統的崩潰,給國家帶來巨大的損失。另外,隨著我國「廠網分開,競價上網」的逐步實施,如何控制發電廠的生產成本,也將提上各個電廠的議事日程。
  3. At last, to be assure that the project can be put into execution effectively, the paper brings forward some suggestions that the plant should reform its system basing on corporation - oriented in order to solve historical debts problems, and should carry out its independent management right, and should reclaim its electricity fee and strive for a reasonable electrovalence, and exploits electric power market, and so on

    最後,為保證成本控制方案的有效實施,提出了對永昌電廠進行公司化改制以解決歷史債務問題、落實企業的經營自主權、進行電費回收並爭取合理的上網電價、開拓電力市場等具體配套性措施和建議。
  4. Conventional power system stabilizer ( cpss ) has such shortcoming as complex design, fussy parameter testing, poor adaptability and so on. in this article formula fuzzy control algorithm is put into the design of pss. quantified factors and modifying factors, which have large effect on the performance of formula fpss, are optimized

    本文針對傳統電力系統穩定器( cpss )設計復雜、參數調試繁瑣、適應性差等缺點,將一種公式型模糊控制演算法應用於pss設計,並對公式型模糊電力系統穩定器的性能影響較大的量化因子和修正因子進行優化,從而設計出一種自尋優模糊電力系統穩定器( sofpss ) 。
  5. The reason for the unprecedented development of southern economy such as agriculture, industry and commerce in the period of the six dynasties was that the policies of macroeconomic regulation and control were put into practice by the six dynasties. the policies were shown by increasing agricultural production factors, compromising with powerful families and limiting their power and developing business and trade

    六朝時期,南方經濟得以較大程度的開發,農、工、商都有了前所未有的發展,其中一個最重要的原因是六朝政府實施了較合時宜的宏觀調控政策,表現為對農業生產要素的增加、對豪族勢力的妥協與限制和發展商業貿易的政策。
  6. In domestic project management, the progress management is ineffectively for a long time, especially the information - based system construction aspect in progress management. the ning dian power engineering was put into production on 27th, dec. it was advanced twelve month. the key was using the p3 software to control the engineering ’ process during the construct period

    標志著我國電力裝機容量突破5億千瓦的寧電工程,於2005年12月27日正式投產發電,工期提前了12 . 5個月正式移交試生產,而應用p3有效控制工程進度是該重點工程提前並網投產的關鍵。
  7. In the vying for state power, you are put into a beauty trap of inter - locking stratagem

    在中原的逐鹿中,你被推進連環的美人計里。
  8. After carefully analyzed the principle of standard svpwm and traditional overmodulation methods, this paper proposed one simple and effective overmodulation scheme. experiments were carried out in one 1. 5kw induction motor and its results were recorded and analyzed by pz4000 power analyzer and the proposed scheme were proved to be effective. although there are many sensorless control methods for induction motor control, many of which are either too complicated or too sensitive to the motor ? parameter to be put into practice

    在分析了標準svpwm演算法和常見各種過調演算法的原理的基礎上,提出了一種簡單有效的演算法滿足過調控制的要求,在1 . 5kw異步電機上進行了實驗並使用pz4000功率分析儀對其結果進行了準確測量與分析,證明了本文提出的svpwm演算法可以有效地提高電源電壓的利用率。
  9. Based on the propounded control algorithm, combined with the developmental way of thematic project automation, this paper designs a system structure of distributed control system with unique merit, which fit for the automatic and intellectual requests of automation of homemade middle and miniature power station boiler. the parameter self - optimizing fuzzy control system designed by this paper has been put into continuous automatic running in industrial process. the integrated characters of the system has gone beyond the national standards and has achieved ideal control effect as well as economic efficiency

    基於本文提出的控制策略,結合熱工自動化的發展方向,設計出一種適合我國國產中小型電站鍋爐特點的計算機分散式控制系統dcs結構,符合我國國產中小型電站鍋爐運行自動化、智能化的要求,該系統成功地在工業現場中投入全自動連續運行,性能可靠,經濟性好,綜合性能指標達到或優于部頒標準,取得了理想的控制效果和良好的經濟效益。
  10. In the procedure of combining into chinese rule of law, it had suffered all kinds of trouble, for example, try out the law, policy replace the tax law, confer the power of legislation etc. the problem in tax law explains such as administration power is too serious, the explain ownership is too misty, the effect is at will, in the tax law being put into practice, such as revenue from tax according to plan, reduce tax - free handles, the contradiction between tax and fee etc. reflect the distance between the ideal and the realistic

    在移植並鍥入到中國的法治化進程中,遭遇了種種規避和背離、錯位與隨意、變通與沖突的困境,如稅法制定中的法律試行、法律政策化和授權立法問題,稅法解釋中的行政權力色彩濃厚、解釋主體歸屬模糊、解釋的效力隨意問題,稅法實施中的稅收計劃、減免稅處理、稅費之爭問題等,一程度上反映了稅收法定主義理想與現實之間的距離。
  11. More thermal power units will be used as peak load regulation units because many hydropower and nuclear power plants have put into production in recent decade, and three gorges hydropower plant is being constructed

    摘要近十年來,新建了很多水力發電廠、核電站,三峽水力發電廠正在建設,將有更多的火力發電機組成為調峰機組。
  12. Translation it is learnt that in order to increase the generation of electricity for sale to the mainland, clp power hong kong limited " clp power " has put into operation all the coal - fired generating units in the castle peak power station

    據悉,中華電力有限公司"中電"為增加向內地出售電力,開動青山發電廠內所有燃煤發電機組,而有研究發現,東涌屯門等新界西地區的空氣污染物主要源自該發電廠。
  13. In the system of the national ownership, every trivia of state - owned corporations, during the era of planned economy, was in the charge of the nation, whereas, itself was put into a state of being in lack of rights, benefits and responsibilities, in that, it was, at most an individual workshop of the big factory of the nation ; in this state, obviously, the state - owned corporations were in deficiency of developing power, which resulted in low output

    在計劃經濟時代的國家所有權制度下,受「父愛主義」的關懷,國有企業的一切經營均由國家承包,其自身處于無權利、無利益也無責任的狀態之中,充其量不過是「國家這個大工廠中的一個個小車間而已」 。這種狀況下的國有企業發展動力不足,效益低下。
  14. Article 15 projects for power networks such as transmission, substation, power dispatching telecommunication and automation projects, and environmental protection projects, shall be designed, constructed, inspected for acceptance and put into operation simultaneously with electricity generation projects

    第十五條輸變電工程、調度通信自動化工程等電網配套工程和環境保護工程,應當與發電工程項目同時設計、同時建設、同時驗收、同時投入使用。
  15. Ningxia shizuishan power plant project phase i ( 4 300mw ), the first national 2000 - year demonstration coal - fired power plant, put into operation

    寧夏石嘴山電廠一期工程, 4 300mw機組,全國第一個「 2000年燃煤示範電廠」項目,已投入生產運行。
  16. Along with the development of power system, more and more generators and ehv transmission systems are put into operation. there come many new situations, such as the lengthening transmission distance, the heavier load, the increasing transient elements during the transient process. these new conditions influence the correct working of relay protections

    隨著電力系統的不斷發展,大容量發電機組和超高壓輸電系統的相繼投入運行,系統中出現了許多新的情況,如輸電距離增大、負荷加重、故障暫態過程中的暫態分量大大增加、持續時間變長等,這些情況對目前常用的各種繼電保護方法的正確動作會產生許多不利的影響,甚至不能正常運行。
  17. The shahe pumped - storage power station with two 50mw reversible units has been in good conditions on general since it was put into operation, but there still were some defects, such as the failure of unit ' s contemporaneous device, the insufficient cooling water discharge and pressure, and the failure of static frequency converter and excitation overcurrent

    摘要沙河抽水蓄能電站兩臺50mw可逆式機組自投運以來,總體情況良好,但是也出現了一些缺陷,如機組同期裝置故障,機組冷卻水流量或壓力不足,靜止變頻器故障,勵磁過電流故障等。
  18. The cooperation with other agents is the emphases in this paper, and the multi - agent based power system dispatching operation assistant system is developed and put into the field. the efficiency is tested by the field

    以與其它agent之間的協作作為本系統的一個研究重點,並開發了基於mas的電網調度操作指導系統,並應用於現場,證實了所提方案的有效性。
  19. The system has been put into use on the no. 2 unit of beilun power plant. it can effectively direct the practical start - stop operations which meets the purpose of operational optimization

    該系統已經在北侖發電廠2號機組投入運行,有效指導機組啟停,達到了優化運行的目的。
  20. The vibration of magnetism pole center in main and subsidiary generator could be deduced to the different order when the generator put into power system

    主、副發電機磁極中心線與系統初相角前後不同,將使主、副發電機併入電網的順序不同。
分享友人