rail passenger crossing 中文意思是什麼

rail passenger crossing 解釋
鐵路旅客通道
  • rail : n 1 (圍欄等的)橫木,橫檔;(釘帽架等用的)橫條,欄桿,扶手;〈pl 〉圍欄。2 軌道;鋼軌;鐵路;〈...
  • passenger : n. 1. 乘客,(尤指)船客;旅客。2. 行人,過路人。3. 〈俚語〉無能船員[隊員];礙手絆腳的人。
  • crossing : n 1 交叉,相交;橫切,橫斷;橫越,橫渡。2 交叉點;十字街口;人行橫道;(河的)渡口,(鐵路的)閘...
  1. Hebi - puyang, hebi - huixian expressways, the main road from huguan of sahnxi province to taiqian of shandong province, beijing to zhengzhou high - speed passenger rail routes, has built up the “ crossing ” traffic hub of the north part of henan province

    國家交通大動脈京廣鐵路、京珠高速公路和107國道縱貫南北,鶴壁至濮陽高速公路、鶴壁至輝縣高速公路、山西壺關至山東臺前省干線公路、京鄭高速鐵路客運專線,構築了豫北「十字」交通樞紐。
  2. The first passenger train on the kwun tong line of the mtr started operation in 1979. the mtr was subsequently expanded to include the tsuen wan line ( 1982 ), the island line ( 1985 ), the eastern harbour crossing rail tunnel connecting kwun tong to quarry bay ( 1989 ) and the tung chung line ( 1998 )

    地鐵觀塘線載客列車在一九七九年投入服務,其後,荃灣線、港島線、東區過海鐵路隧道(連接觀塘與?魚涌)和東涌線先後在一九八二、一九八五、一九八九和一九九八年通車。
  3. A new rail passenger boundary crossing connecting lok ma chau with huanggang in shenzhen is expected to be completed by mid - 2007

    一條新的鐵路旅客過境通道將會連接落馬洲至深圳皇崗,工程預計在2007年年中完成。
  4. A new rail passenger boundary crossing at lok ma chau connecting huanggang in shenzhen is expected to be completed before mid - 2007

    一條新的鐵路旅客過境通道將會連接落馬洲與深圳皇崗,工程預計在2007年年中之前完成。
  5. In the first stage of the study, issues such as the functions and strategic importance of the erl, the regional transport demand, passenger forecast, and the possible alignments and crossing points of the rail link were studied

    第一階段研究的議題包括廣深港鐵路項目的功能和策略重要性,有關區域的運輸需求分析及客運量預測,與及鐵路的可能走線及過境位置等。
  6. A second rail passenger boundary crossing at lok ma chau will be developed to handle the substantial growth in two - way travel and commerce across the boundary

    為應付香港與內地日益頻繁的過境旅客量和跨界商業活動,政府會在落馬洲興建第二條鐵路旅客跨界通道。
分享友人