receiving plan 中文意思是什麼

receiving plan 解釋
接收方案
  • receiving : n. 1. 接收。2. 收買賊贓。adj. 接受的;收報的。
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. The guideline further requires the receiving bank to agree in advance with the sponsor of the ipo a formal contingency plan for coping with any unexpected level of interest in the ipo

    指引又要求收款銀行事先與首次公開售股事項的保薦人商定正式的應變計劃,以應付意料之外的認購熱潮。
  2. Before receiving the pandas, the memphis zoo submitted a detailed research plan

    在樂樂和雅雅到達美國之前,孟斐斯是要向中國有關方面提供詳細的研究計劃。
  3. What should a local guide do after getting the receiving plan from a travel service

    接到旅行團接待計劃后,全陪導游員應做好哪些工作?
  4. When should a local guide start the receiving work ? how many days should a local guide go to the travel service for the receiving plan

    地陪的工作是從什麼時候開始的?地陪需在上團前幾天領取接待計劃
  5. As a general rule, the company will arrange the material and plan for production after receiving the payments in above no. 8 terms

    原則上,公司在收到客戶的全部貨款、部分定金經復核無誤后,開始安排生產計劃,組織貨源,進行生產。
  6. Incoming quality control for direct material and indirect material according to specification / sampling plan and maintenance of receiving inspection records

    根據規格和抽樣計劃對原材料進行進料檢驗並保存進料檢驗記錄。
  7. Receiving requirement forecast and delivery plan from customers, revise mps and fg delivery plan. plan logistics proposal for customers

    為確保滿足客戶供貨需求,根據公司文件,接受客戶需求預測和供貨計劃,編制主生產計劃和成品發運計劃;參與策劃客戶供貨物流方案。
  8. The article aims at making a set of design about project management and a total developing plan orienting towards beijing huamao center, finally realizing the setting goal of progress, quality, safety and investment control, receiving utmost profit and social welfare with the minimal cost. the main contents of this paper are as follows : 1. brief introduction of the project and the basis on which the project strategic plan is worked out

    主要目的:就是根據本工程項目的特點及市場定位,結合國際國內工程項目建設管理的最新技術、最新理論制訂出一套適合「華貿中心」工程特點及要求的建設組織策劃方案,從而指導本工程項目的總體開發建設,最終實現該工程項目制定的工期、質量、安全、文明施工及投資控制目標,以最小的投入獲得最大的利潤、最大的社會效益。
  9. What ’ s more, we don ’ t mean that the putting out of the products is the end of the tourism planning. actually the process of tourism planning is a developing process which demands the planners a lot, such as focusing on the market changes, receiving the market feedback, adjusting the plan constantly and then putting out the latest products

    但是這並不是說推出了一定的旅遊產品,旅遊規劃工作就結束了,事實上旅遊規劃的過程是一個動態的過程,它要求規劃人員必須時刻關注市場動向,不停地接受市場反饋,不斷地調整規劃內容,不時地推出新的旅遊產品。
分享友人